Loading...
HomeMy WebLinkAboutCLE201300286 Legacy Document 2013-12-30Application for Zoning ClearanceFEI;_'` of ni.�iF. �/I //��� i1 � s CLE # .k OFFICE US1EILY V 'f Date: ` PLEASE REVIEW ALL 3 SHEETS Check # i y Receipt # Staff: PARCEL INFORMATION �u Tax Map and Parcel: 0-7 700 -00' 00 —0 It D Z Existing Zoning f r Parcel Owner: 1�arv�P� LL C jJ Parcel Address: (Zd� �� , ri'n I .City 6�etel�4CWJIC State A Zip (include suite or floor) PRIMARY CONTACT tt)✓l� Who should we call /write concerning this project? u5-*� / cJi`,� �" y ��`t City 1-4rrj ovt�V State y� Zip Address: l�yX Office Phone: 40 A33-3,060 Cell # S�10 - 7 �gRx # E -mail Ca ,�lci-� �vv . Go✓il. APPLICANT INFORMATION Change of use Change of name New business Check any that apply: Change of ownership.( � I CD✓154,un+;e Business Name /Type: 1 Previous Business on this site S Y 1 ed—Ai) 00Q �,S L_ L Describe the proposed business including use, number of employees, number of shifts, available parking spaces, number of �o 1 rr^� S SV ► vehicles, and any additional information that you can rovidg: eeS I S�; �toieSa(� wq�e e c�; - Fi-�l� �d� �hs�vc� -,v� ,�-c ••�•�e ;d Ls . *This Clearance will only be valid on the pa cel for which it is approved. If you change, intensify or move the use to a new location, a new Zoning Clearance will be required. I hereby certify that I own or have the ne s permission to use the space indicated on this application. I also certify that the information provided is true and accurate to the be o kno dge. I have read the conditions of approval, and I understand them," and that I will abide by them. Signature — Printed APPROVAL INFORMATION 'Approved as proposed [ ] Approved with conditions [ ] Denied [ ] Backflow prevention device and /or current test data needed for this site. Contact ACSA, 977 -4511, x117. [ ] No physical site inspection has been done for this clearance. Therefore, it is not a determination of compliance with the existing site plan. [ ] This site complies with the site plan as of this date. Notes: Building Official Date ( `t t'1 .: — •�.1`• (r it ' i% Date Zoning Official _ ,uJv"�' r Other Official Date [ ] 3 County of Albemarle Department ui L.Ur„uiui,1Ly UVVU VNAUU.- 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 Revised 7/1/2011 Page 2 of 3 US Intake to complete the following: f'/ N Is use in LI, HI or PDIP zoning? If so, give applicant a Certified Engineer's Report (CER) packet. YIN Will there be food preparation? If so, give applicant a Health Department form. Zoning review can not begin until we receive approval from Health Dept. FAX DATE Circle the one that applies „____„ Is parcel on private well or pirbliewat r? If private well, provide Health Department form. Zoning review can not begin until we receive approval from Health Dept. FAX DATE Reviewer to complete the following: Square footage of Use: GIN Permitted as: 7h' /4�. IPAIZA- l�fjl Under Section: Supplementary regulations section: Circle the one that applies Is parcel on septic or publi~ se YIN Will you be putting up a new sign of any kind? Sign permit. Permit # Parking formula: Required spaces: b Y/ Items to be verified in the field: If so, obtain proper Inspector : Date: Y / N Notes: Will there be any new construction or renovations? If so, obtain the proper Permit. Permit # rz +., .,1 +o +ho inlln[xrinfi• "VIA AX w •.vua Violations: Y /LN} If so, List: Proffers: Y /, � If so, List: Variance: Y /IN) If so,`L'ist: SP's: (19 / N If so, List: Clearances: SDP's Revised 7/1/2011 Page 3 of 3 �J. "I G i z z n. o. x � � C2 z z O LU 4lbw wr MQaOo a< 0zu�4 -i ►(�ju C) co O ti~ *} C OWC)P q (0110 +} in r1 .11 (ry COD to (D 1, CERTIFICATION THAT NOTICE OF THE APPLICATION HAS BEEN PROVIDED TO THE LANDOWNER This form must accompany zoning applications (Home Occupation, Zoning Clearance, Zoning Administrator Determinations or Appeals, Sign Permits, Building Permits) if the application is not the owner. I certify that notice of the application, d✓1 i ✓l C ` eor [Count pplication name and number] was provided to /Sa CYl eS LL C the owner of record of Tax Map [name(s) of the record owners of the parcel] and Parcel Number O 7 700 " 00 - 00 - Q 11 O z by delivering a copy of the application in the manner identified below: Hand delivering a copy of the application to [Name of the record owner if the record owner is a person; if the owner of record is an entity, identify the recipient of the record and the recipient's title or office for that entity] on Date Mailing a copy of the application to ECyjeS L L C [Name of the record owner if the record owner is a person; if the owner of record is an entity, identify the recipient of the record and the recipient's title or office for that entity] on to the following address: Date /,?(o 5- 6,ov+ , c N ,Pe, VA Z2c701 [address; written notice mailed to the owner at the last known addresss of the owner as shown on the current real estate tax assessment books or current real estate tax assessment records satisfies this requirement]. Signature plicant 1044 N - 5i .,-t,:p4.s Print Applicant Name / 2Z2LI ? Date Certified Engineer's Report Compliance Review Zoning Ordinance section 18 -4.14 Project: Construction Materials Group, CLE2013 -00286 Report Revision Date: 17 December 2013 Certifying Engineer (required): Michael Koslow Reviewing Engineer: Overall Level of (Level of Compliance Compliance .A corresponds to the lowest score on any standard) Comments: Key to Grades: A. Full Compliance: The use does not generate discharge, noise, vibration, etc. Or, the physical conditions (distance, barriers) assure compliance with the standards indefinitely. Approval is recommended. B. Monitored Compliance: This use has the potential to exceed the standards. Preventive and mitigating measures are proposed which will achieve compliance but require maintenance, such as fences, shields, vegetation, drains, recycling, oil separators, filters, mufflers, etc. Approval is recommended with conditions for maintenance and periodic inspection or reporting. Compliance is likely, with occasional instances of non - compliance. C. Tentative Compliance: This use has the potential to exceed the standards. Only operational methods are proposed to address concerns, such as limited hours of business, working inside only, keeping gates operational, machines turned off, uses on a particular corner of the site, etc. In other words, compliance is based on a promise of good behavior. Careful consideration is recommended as this may place a policing burden on the neighbors and County staff. Strict conditions should be placed on any approvals if possible. Compliance is possible, but instances of non - compliance will likely occur. D. Non - compliance: It is likely that the standards will be exceeded. This is not recommended for approval. E. Not enou6 information: The report was insufficient, and it should be completed or revised. exempt sounds under 18- 4.18.05 may be considered part of operations and impact this grade A. Full compliance B. Monitored compliance C. Tentative compliance D. Non- com liant E. Not enough information 1. Noise* X 2. Vibration X 3. Glare X 4. Air Pollution X 5. Water Pollution X 6. Radioactivity X 7. Electrical Interference. X Overall Level of (Level of Compliance Compliance .A corresponds to the lowest score on any standard) Comments: Key to Grades: A. Full Compliance: The use does not generate discharge, noise, vibration, etc. Or, the physical conditions (distance, barriers) assure compliance with the standards indefinitely. Approval is recommended. B. Monitored Compliance: This use has the potential to exceed the standards. Preventive and mitigating measures are proposed which will achieve compliance but require maintenance, such as fences, shields, vegetation, drains, recycling, oil separators, filters, mufflers, etc. Approval is recommended with conditions for maintenance and periodic inspection or reporting. Compliance is likely, with occasional instances of non - compliance. C. Tentative Compliance: This use has the potential to exceed the standards. Only operational methods are proposed to address concerns, such as limited hours of business, working inside only, keeping gates operational, machines turned off, uses on a particular corner of the site, etc. In other words, compliance is based on a promise of good behavior. Careful consideration is recommended as this may place a policing burden on the neighbors and County staff. Strict conditions should be placed on any approvals if possible. Compliance is possible, but instances of non - compliance will likely occur. D. Non - compliance: It is likely that the standards will be exceeded. This is not recommended for approval. E. Not enou6 information: The report was insufficient, and it should be completed or revised. exempt sounds under 18- 4.18.05 may be considered part of operations and impact this grade Certified Engineer's Reports According to Zoning Ordinance section 18- 4.14.8, Albemarle County requires a certified engineer's report prior to issuing a zoning compliance clearance or home occupation permit for uses of an industrial character. The certified engineer's report must be reviewed by the County Engineer (or designee). A certified engineers report shall consist of; Type 1: For uses which will have no discharge, noise, vibration, smell, lighting, emissions, impulses or radiation beyond a normal office or residential use, and will not store any hazardous materials, a letter from the owner with the following information will suffice as a certified engineer's report; 1. a description of the business and the physical process involved. 2. a description of any machinery and operations. 3. a statement or explanation for meeting each of the performance standards of section 18 -4.14; noise, vibration, glare, air pollution, water pollution, radioactivity, electrical interference. Examples of type 1 uses might be offices or warehouse storage of clothes or home occupations for wood workers. An example letter is available. Type 2: For.uses which will have any discharge, noise, vibration, smell, lighting, emission, impulse or radiation which might reasonable be expected to exceed the performance standards of 18- 4.14.4 at any time, or which have any permit requirements from DEQ, EPA, Health Department or other local, state or federal agency, a full certified engineers report is required. This report must contain a signed and dated seal from a professional engineer. It must contain copies of any local, state or federal permits. It must contain plans and descriptions of physical and operational measures to meet all of the performance standards, with actual supporting measurements and data where applicable. Examples of type 2 uses might be a contractor's office and storage yard or equipment repair shop, or a manufacturer of electrical components. CEF, r vis =c 2/11/09 12/17/13 Community development department Division of Zoning and current Development 401 McIntire Road Charlottesville, VA 22902 To the County Engineer: Construction Materials Group LLC is a small construction materials supplier. We distribute materials that are used in concrete construction and hardware goods that are used by General Contractors. We have three employees that manage the warehouse and drive one delivery truck. We have addressed the performance standards of Zoning Ordinance Section.18 -4.14: Noise: Our operation will not create sound or impact noise levels in excess of the limits set in section 4.14.1. We are in one half of a building that has on one side an embankment, two sides with a tree buffer, and the back of building is bordered by another large commercial building. Our only sources of noise are telephones, one small indoor /outdoor forklift, and typical noise expected from truck deliveries. Vibration: One Toyota 30001b indoor /outdoor lift with pneumatic tires. One hand driven palletjack that will roll on the concrete floor in the warehouse. Glare: All materials that will be stored outside will cause no reflective glare, and no additional lot lighting will be needed as outlined in section 4.14.3. We only operate one shift that will operate during daylight hours with will not require headlights on lifts or delivery trucks to cast light on surrounding properties. Air Pollution: There will be no emission of smoke, odor, or gaseous pollutants. Water Pollution: No liquid waste will be generated by this operation. There is no hazard to water quality. Radioactivity: My operation handles no radioactive materials. Electrical Interference: My operation does not use any equipment that would generate electrical disturbances. Please feel free to contact me with any further questions that you may have. 540- 607 -6849 or jeff.crider@conmatgroup.com conmatgroup.com Sincerely, /eff, rider Vice President Construction Materials Group