Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CLE200700164 Legacy Document 2014-01-22
Application i ®r Zoning Clearance County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 511106 Page 2 of 3 �-o ro C1 me OFFICE USE ONLY. „�,r�` 7 /49 9 (��J / oning Clearance = $35 CLE # -7 _ PLEASE REVIEW ALL 3 SHEETS Check # Date: Receipt # Staff: PARCEL INFORMATION iJ © e per(, Tax Map and Parcel: o 7 8 00 - 00 - ©p - o t 5 C o Existing Zoning N l q hw Ly G wl 94eyt l Parcel Owner: /7l b e MAV-( ,P_ �y Se yV ir- e. +t4,lvt� Parcel Address: _1 & D .A I?6aJ City C. earl0f'qSV l Ue State Y ► rQ l h C< Zip ZZq (in dude suite or floor) PRIMARY CONTACT Who should we call/write concerning this project? / city(Oi���1Ue State Vcv�_ L KLLGk Zip. Address: 1(05 `ypaiuLap �4� CUV Office Phone: y( 3�() 1-i -H51 l Cell # Fax # 4134 -q71- MbE-mail lfGv-ylp5emc-e oLtADa &V, APPLICANT INFORMATION Sev-v !�-�I �c3V`� � � � � use �(.l,Vb �I.l, t Business Name/Type: WLd. IL �, t C, Previous Business on this site Describe the proposed business, including use, number of employees, number of shifts, available parking spaces and any t(_e. � D er4 DAD Ce Wi (00 additional information that you can provide: 1 c, l,t of1 r l0 \Jt0e_5 3 a.5Si re +0 WL Ka�tce_ s�k-op o e hi LkoweVer af-hcV koulrs c mr c L fake_ (awe w i ( s i la *This Clearance will only be valid on the parcel for which it is approved. If you change, intensify or move the use to a new location, a new Zoning Clearance will be required. I hereby certify that I own or have the owner's permission to use the space indicated on this application. I also certify that the information provided is true and accurate the best of my owledge. I have read the conditions of approval, and I understand them, and that I will abide by them. Signature �.% Printed SlIA110: All OVAL INFORMATION [ Approved as proposed [ ] Approved with conditions [ ] Denied [ ] ackflow prevention device and /or current test data needed for this site. Contact ACSA, 977 -4511, x119. [ No physical site inspection has been done for this clearance. Therefore, it is not a determination of compliance with the existing si a plan. [ ] This site complies with the site plan as of this date. Notes: Building Official A Date S �a Zoning Official Date Other Official Date County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296 -5832 Fax: (434) 972 -4126 511106 Page 2 of 3 �-o ro C1 me Intake to complete the following: ❑ YES r0 following: Reviewer to complete the following: Square ootage of Use: �I"V Is use in LI, HI or PDIP zoning? If so, give applicant a Certified Engineer's Report (CER) pa .et. F1 YES O YES ❑ Permitted as: Will there be food preparation? Under Section: d'• - If so, give applicant a Health Department form. Zoning review can not begin until we receive approval from Health Dept. FAX DATE Supplementary re tions sect' n: 1 �• ` I °� ❑ YES ❑ NO Is parcel on private well or mubl'c water? Parking for C� L/ If private well, provide Health Department form. Zoning review can not begin until we receive approval from Health Dept. FAX DATE Required spaq� ❑ �,n, , u �n YES ❑ G� v ►1 NO ❑ YES ❑ NO Items to be verified in the field: Is parcel on septic or public sewer? ❑ YES P-5-0"" Will you be putting up a new sign of any kind? If so, obtain proper Sign permit. Permit # Inspector : Date: S F-1 NO Notes:f`� Will there be any new construction or renovations? If so, obtain the proper Permit. Permit# 6a003 -00583 -IBC Zoning Tech to;complete the tollowmg: Violations: ❑ YES If so, List: NO Variance: ❑ YES If so, List: [V NO Proffers: ❑ YES NO If so, List: SP's: ❑ YES VNO If so, List: 511106 Page 3 of 3 1Q Y �� OF ALg� U$ ` I 9CrrJ -V �'IRGIN�P COUNTY OF ALBEMARLE Department of Zoning 401 McIntire Road Charlottesville, Virginia 22901 -4596 (804) 296 -5875 July 16, 1992 J. W. Brent Executive Director Albemarle County Service Authority Albemarle County Office Building 401 McIntire Road Charlottesville, Virginia 22902 Re: OFFICIAL DETERMINATION OF USE - Proposed A.C.S.A. office and Operations Center Dear Mr. Brent, This serves to confirm in writing, that which we have discussed verbally. After consultation with the Director of Planning and Community Development, it is my opinion that this use is a public use / utility. And as such, it is permitted by -right within each zoning district. If outdoor storage is proposed and is visible from the entrance corridor, a special permit is required for the proposed development; otherwise, it is permitted by- right. Prior to construction, a site plan is required. You have explained the proposed use of the operations center verbally and by your letter of June 11th. It will be the relocation of the administrative offices and the maintenance operations. The development will include a warehouse, vehicular storage and fueling, and storage of pipe and gravel. In our consideration, the Planning Department and I considered the use to be quasi - public and of a utility company nature. .The use of the property would be similar to that of major utilities, with the mix of offices and contractor's equipment storage yard. I am informed that the City of Charlottesville operations yard was located on Avon Street in the County, under a similar determination of use. July 16, 1992 J. W. Brent; ACSA Office & Operation Center Page 2 The specific property to which you refer, Tax Map 78, Parcel 15C, is zoned Highway Commercial, without proffer. A portion of this parcel is located within 500 feet of Route 250 East, an entrance corridor. Depending on whether this proposed development is visible from Route 250, a special permit may or may not be required, and a certificate of appropriateness for the site plan may or may not be required from the Architectural Review Board. There are no parking standards which directly apply to a use such as this. I preliminarily recommend that the office function be separated out for the parking requirements, from that of the "contracting" or maintenance function. In that case, the offices will require 1 space per 200 square feet of net office area. The maintenance shop will require 1 space per 2 employees on the major shift. I hope this is of assistance to you. If you are in need of additional information, please do not hesitate to contact me. sincerely, A Amelia M. Patterson Zoning Administrator AMP/ cc: Wayne Cillimberg Jim Bowling