Loading...
HomeMy WebLinkAboutWPO201300002 Inspection 2014-02-19COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 EROSION CONTROL RE- INSPECTION INVOICE # 2 DATE: February 19, 2014 INVOICE TO: Wendell W. Wood First Gold Leaf Land Trust & River Heights Associates LP P.O. Box 5548 Charlottesville, VA 22905 RE: WPO -2006 -00050 Northtown Center WPO -2013 -00002 — Northtown Phase IIA Erosion and Sediment Control. and Stormwater Management Plan Stop Work Order Dated 1/8/2014 DATE OF RE- INSPECTION: 2/3/2014 RE- INSPECTION FEE: $250.00 By March 19, 2014, you should forward the re- inspection fee of $250.00 to continue your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. if you should have any questions, please do not hesitate to contact me. Sincerely Ana D. Kilmer Management Analyst Administration AD K/ Enclosure LADHPTTommunity Development4Administfation DivisionWilmeASOPS for Billing Reinspmdon Pees•invoice.doe K�- inn S In�,� -cull � pF AL g ®� �'IRGIly1P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 January 8, 2014 First Gold Leaf Land Trust C/o Mr. Wendell Wood P.O. Box 5548 Charlottesville, VA 22905 RE: Northtown Center Phase 1 & 2A Tax Map & Parcel 04500 -00 -00 -11100 Tax Map & Parcel 04500 -00 -00 -11000 WPO 2013 -00002 WPO 2006 -00050 STOP WORK ORDER Dear Mr. Wood: Under § 17 -214 of the Albemarle County Code, you are hereby notified to immediately cease all land disturbing activities on the above referenced property (STOP WORK) with the exception of work to address the installation of erosion control measures, soil stabilization, and any necessary drainage corrections as approved by the County. A sworn complaint has been made by the Inspector, Jonney Otto, who indicates that a prior Notice to Comply had been issued and the corrective measures have not been met by the agreed upon correction date of January 7, 2014. This STOP WORK ORDER shall remain in place for seven (7) dys from the date of receipt. If satisfactory repairs have not been made within seven (7) days, the County may elect to issue another Stop Work Order, and /or petition the Circuit Court for penalties and relief with regard to this violation. Required Correction(s): 1. Submit an Erosion & Sediment Plan of Action in accordance with the Virginia Erosion and Sediment Control Handbook Third edition dated 1992 for county approval, as stated in the Notice to Comply dated January 2, 2014 �13�i�� If you have any questions or concerns with steps necessary to correct this violation, pleas cgntac eith� nyi ll //,/ Thacker or Jonne Otto at 296 -5832. � / / Sincerely, Jonney Otto Engineering Inspector II ICen'Gny hacker Erosion Control Officer k :� Glenn Brooks P.E. Comity Engineer Program Administrator d' M LO � N y I--1 G � � N M N � p � C o U E a co I N O } \= Q d Y ON q N �wr (5 CF) N 2w 4FF m mQ ix J J J z . LO a� Q N a0 ou m � O z -j U X U5 Z 0w� 51 C a �O < °w a0 N rm ru ti L%- N rm a LJ1 0 0 0 0 rJ] ru l 0 Ln 0 s Er La Cl rLi IL N � U U U T GQ � � � n S � O M � � N a o E W � �Q co I N O } \= Q d Y ON q N �wr (5 CF) N 2w 4FF m mQ ix J J J z . LO a� Q N a0 ou m � O z -j U X U5 Z 0w� 51 C a �O < °w a0 N rm ru ti L%- N rm a LJ1 0 0 0 0 rJ] ru l 0 Ln 0 s Er La Cl rLi IL V OFj` rNAL -white 94549 D PLICATE -Canary County of Albemarle TRIPLICATE - Pink Department of Community Development Telephone (434) 296 -5832 Date Z ZECEIVED FROM: AMOUNT: 4 307 308 324 _ Z5O. Q C3 510 For: S C) _ check cash credit card By BRANCH BANKING & TRUST COMPANY UNITED LAND CORPORATION CHARLOTTESVILLE, VA 22901 21410 CONSTRUCTION ACCOUNT 68-426/514 P.O. BOX 5548 CHARLOTTESVILLE, VA 22905 (434) 975 -3334 2/7/2014 PAY TO THE COUNTY OF ALBEMARLE ORDER OF $ '+250.00 Two Hundred Fifty and 001100+++++++++++++ rr+++++ r+++++ r++++++++ r+ rr+++++++++++ rrr+++++ r+++ rr *+ + + + + + + + + +++ + +r + + + + + + + +r +++ ++ COUNTY OF ALBEMARLE DEPT OF FINANCE /ACCOUNTING 401 MCINTIRE RD CHARLOTTESVILLE, VA 22902 DOLLARS MEMO W PO- 2006- 00050=PO- 2013 -0002 II'020,011w ':05L404260i:000S13? ?223 ?4n' L -- vo �'IRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 EROSION CONTROL RE- INSPECTION INVOICE DATE: January 29, 2014 INVOICE TO: Wendell W. Wood First Gold Leaf Land Trust & River Heights Associates LP P.O. Box 5548 Charlottesville, VA 22905 RE: WPO- 2006 -00050 — Northtown Center WPO- 2013 -00002 — Northtown Phase IIA Erosion and Sediment Control and Stormwater Management Plan Notice to Comply dated 1/2/2014 DATE OF RE- INSPECTION: 1/8/2014 RE- INSPECTION FEE: $250.00 By February 28, 2014, you should forward the re- inspection fee of $250.00 to continue your project. To pay the re- inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely 00,1, �' , Ana D. Kilmer Management Analyst Administration ADK/ Enclosure IADEPnCommunity DevelopmenAAdministration DivisionWinneASOPS for Billing Reinspection fees - invoice.doc n �� 9 �'IRGII�ZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 January 2, 2014 First Gold Leaf Land Trust P.O. Box 5548 Charlottesville, VA 22905 RE: WPO 2006 -00050 WPO 2013 -00002 Northtown Center Phase 1 & 2A NOTICE TO COMPLY Dear Mr. Woods, Under Section 17 -213, of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the Erosion Control Permit for the referenced property and to immediately take corrective measures that address the erosion and sediment control deficiencies on this property. The specific deficiencies and measures required to correct those deficiencies are as follows: Deficiency: Minimum Standards 19- Sediment observed in the stream due to the collapse of the retaining wall. Properties and waterways downstream fi•om development site are not being protected from sediment deposits and damage. Required Corrections: Submit an. Erosion & Sediment Plan of Action in accordance with the Virginia Erosion and Sediment Control Handbook Third edition dated 1992 for county approval. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by no later than January 7, 2014. Page 2 First Gold Leaf Land Trust P.O. Box 5548 Charlottesville, VA 22905 Note: 17- 207(2) "Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authorty) finds are necessary parts'of the construction that are subject to an active building permit and areas where erosion is prevented by a non - erosive sui;face. For the purposes of this section, a "non- erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel., stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion.'.' Under Sections 17 -213, 214 and 215 of the Albemarle County Code, failure to make these corrections by the required date can have the following results: Your permit may be revoked. You may be required to submit a new Erosion and Sediment Control Plan and have it approved before additional land disturbance will be allowed. Review of a new plan can take up to 45 days for each submission and it is not unusual for several submissions before the plan can be approved. This requirement would include a new application, fee and bond for the work proposed under the plan. The County may issue a STOP WORK ORDER and seek relief in the Circuit Court. The Circuit Court can fine the property owner up to $2,000 per violation, convict the property owner of a Class I misdemeanor and require the property owner to pay any damages resulting fi•om a failure to comply with this notice. Should you have a legitimate reason you can not complete the corrective measures by the above given date, you must immediately contact me at (434) 296 -5832. Unless you have contacted us and alternative arrangements have been agreed to in writing, we will expect the corrections to be completed by the above date. Sincerely, Jonathan Otto Engineering Inspector II QT co N v I