Loading...
HomeMy WebLinkAboutARB201400011 Legacy Document 2014-04-21daggett + grigg architects Rio Square - Office Building B Description: Office Building B is the final building to be constructed in the Rio Square PRD development, which was approved in 2001. Generally, the scope of work will include a new commercial building with parking and commercial space on the ground floor and two floors of commercial space above. Each floor is approximately 3,300 sq. ft. The building will of brick veneer, with materials and details matching the existing office building (on left) on the adjacent lot in the development. Compatibility with Surrounding Area and Entrance Corridor: The frontage along E. Rio Rd is a mix of commercial, multi - family, residential and religious institutions. The proposed brick veneer and traditional white trim will match the adjacent office building and the scale and style is in keeping with many of the existing commercial buildings along E. Rio Rd. Additionally, the scale is compatible with the adjacent single - family residence to the right. March 31, 2014 1 of 15 f daggett + grigg architects �� lift _ Proposed building location (South side of E Rio Rd, east of Wakefield Rd) March 31, 2014 2 of 15 daggett + grigg architects View of site from west March 31, 2014 3 of 15 daggett + grigg architects View of site from east March 31, 2014 4 of 15 daggett + grigg architects I I slow W rj PULL LIT L --------- iv 5a COL. WRAP, WOOD, PTD WHITE LITE METAL DOOR 4 W/ COPPER ROOF TRANSOM LU/ DIVIDED LITE57 CONCRETE STOOP Wl BRICK ROWLOCK EDGE METAL HANDRAILS L —_ -------------------------------------------------------------------------- NORTI4 ELEVATION SCALE ui CONT. RIDGE VENT 3 -TAB ASPHALT SHINGLE, CHARCOAL COPPER LOUVER 1111-41TE ALUMINUM GUTTERS COPPER DOWNSPOUT - TRAN[STION TO WHITE 0 FRIEZE BD. ENGINEER BRICK, OLD VIRGINIA - ALBEMARLE Lu/ C13 MORTAR SOLDIER COURSE JAG ARCH' TYP. METAL-CLAD WINDOW W1 WHITE TRIM 4 DIVIDEI LITE. V1915LE LIGHT TRANSMITTANCE (VLT) SHALL NOT DROP BELOW 4096, V1515LE LIGHT REFLECTANCE (VLR) SHALL NOT EXCEED 30% Lu i CONCRETE STOOP W/ METAL GUARDRAIL, PAINTED WHITE ti ------------------------------ March 31, 2014 5 of 15 daggett + grigg architects 50UTH ELEVATION SCALE March 31, 2014 6 of 15 daggett + grigg architects EAST ELEVATION SCALE I/8" ■ i' -m" WEST ELEVATION SCALE I/8" ■ I' -m" March 31, 2014 7 of 15 daggett + grigg architects Bullnose brick sill Details of existing building to be incorporated in new building (Albemarle Brick from Old Virginia w/ C73 mortar) Soldier course and jack arches Beveled water table 9 March 31, 2014 8 of 15 l r Beveled water table 9 March 31, 2014 8 of 15 daggett + grigg architects ,'_d" L 9' -4" L 4' -S" L 24' -0" L 4' -a" L V -4" L 6' -o,, L �, -4' 1. 20' -a" SCALE ve�� • i' -m" o� March 31, 2014 9 of 15 daggett + grigg architects FIRST FLOOR Mail wwor-w HVI a s EN Q Q co a� March 31, 2014 10 of 15 daggett + grigg architects v L. 9m' -m" '3' -4" i.4' -m" i. 6' -0" i.4' -0" i. 6' -m" i.4' -m" i. 6' -m" i.4' -m" i- 6' -0" i.4' -m" i. 10' -4" 1.4' -0" L 10' -4" L4' -0" L S' -m" C-, —0 4 =0 e> _ 0 4' -01' 6' -m" 4' -m" (o' -m" 4' -0 1I'=O" G =0" SECOND FLOOR an m March 31, 2014 11 of 15 Ct n W N N O N A F-' N O N Ui 3C -YR FIBERGLASS SHINGLE, CHARCOAL ON # 15 FELT 5/8" PLYWOOD ENGINEERED WOOD TRUSSES ALUMINUM DRIP EDGE, WHITE PRE - FINISHED ALUMINUM K -STYLE GUTTER, WHITE CONT. 2x FASCIA FRAMING 1 XS SMOOTH FINISH FIBER CEMENT FASCIA 1X4 SMOOTH FINISH FIBER CEMENT SOFFIT W/ CONT. SOFFIT VENT 6 "CROW N - AZEK AZM -45 1XIOSMOOTH FINISH FIBER CEMENT FRIEZE THROUGH -WALL FLASHING, TYP. BRICK JACK ARCH, TYP. GALV. LINTEL, PAINTED METAL- CLAD WOOD WINDOW W/ SIM. DIVIDED LIGHTS BULLNOSE SILL 1 /7' OFFSET SOLDIER COURSE 2x6s 0 16" O.C. W/ R -19 BATT INSULATION TYVEK ON 1/2" PLYWOOD SHEATHING 3/4" PLYWOOD SHEATHING ON 11 7 /8 "TJIs 16" O.C. W/ R -19 BATT INSULATION THROUGH -WALL FLASHING, TYP. BRICK JACK ARCH, TYP. GALV. LINTEL, PAINTED BULLNOSE SILL BEVEL WATER TABLE COURSE Roof 558' - 1 I" Second 548'- 7' NONNI A1 Q O cfl TQ O n N daggett + grigg architects TW.539 536.0 TW:538L5 7 COND. 11.84, 1 Story stucco ." , 12 • AMO E Ras—cnt NEW SEGMENTAL RETAINING WALL MAX. RET. KT. 3 Fr. T 3507 7' r TW.,537.5 NEW CONCRETE STOOP 90.00, NEW SEG ENT R AININ TM HT. MAX. RE Tr SCREENING SHRUBS COND. NFW TWO—S70P1 RLI'l DING W/ GASFVFNT n g NITS I SYCMO F DISTURBED AR 7.701 S.F. E SPO TO STORM I. D(TEND 4* SPRINK BUILDING R LINE INTO IUIIDIN—� -- NEW CONCRETE 625.25 5 SIDEWALX 525.25 70' TREE TM RAM] DOME INSERT ' Stem &, Lord;,,l NEW CG -8 CURB .W 4' SCH 1"0 C SANITARY LATERAL 17 I nrATF FM nW—OFF 0 ASSEMBLY BEHIND CUR LOCATE MEYER DO 4EW ASPHALT PAVEMENT BEHIND CURB. SET METER---- n 4 ---__NEW STRIPING—/ in Paved Parking Patting H/C Handic.p ROMI Parking NEW 1' TYPE C�CV TO BUILDING C Th—h.ld Flew. -+b24 5 Electric Meters LATERAL- PREVENTER 0,5-- 2 Store B,i. I, B.ildincg Revised Site Plan w/ screening shrubs at cond. units. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. March 31, 2014 13 of 15 daggett + grigg architects LANDSCAPING REQUIREMENTS REQUIRED PROVIDED SYMBOL SYMBOL QUANTITY 10 YEAR COVERAGE TOTAL COVERAGE STREET TREES 1 PER 50 FT. FRONTAGE x 450 FT. 9 TREES 1A 8 - - S COVERAGE x1.25 OVERAGE PARKING 5R OF PAVED PARKING .05 x 25.170 SF 1,259 SF COVERAGE 1 TREE PER 10 SPACES x 78 SPACES 8 TREES G 8 w 240 1440 LS 3 424 +272 Cc 4 155 62J MI- 2 740 4811) TOTAL: 15 3.812 SF CANOPY (15% OF LAND AREA) LAND AREA - TOTAL SITE - OPEN SPACE 3.11 AC.- 0.93 AC. =2.18 AC. 15% OF 2.18 AC.= 14,244 SF TOTAL: 18.471 SF BIOFILTER LS 2 CA 6 SCREENING ;AZ( AMFRICAN a - 2 GT REMOVED AT NEW PARKING SPACES LANDSCAPING SCHEDULE SYMBOL PLANTING QUANTITY 10 YEAR EXISTING TOTAL NOTES SIZE COVERAGE x1.25 OVERAGE N CRABAPPLE CRABAPPLE VARS. � "INO'AN SUMVzR, VF -ES' z %C ? k T PRAIRIF F Rr, ND AN VACIC' SCREENING ;AZ( AMFRICAN 8D V SYMBOL PLANTING QUANTITY SIZE �n SCF7, -CUCH JAPANESE HOLLY j it I X CIRI NAIA "1;01 1 TOUCH" iC �3 2 Ckf T U) IHL LANDSCAPING SlIL('IIONS SHOWN ABI)VI Ail! ; •<OV CIE ORIGIN'AI S I! i'IAN AN.' ARI I III • 2 WSS+NG OR WILT NEED FO BE REPLACED AF1ER CONSIRUCTION. Landscaping Schedule - Requirements shown are for total site development. The scheduled plantings are in the area impacted by new construction only. March 31, 2014 14 of 15 • daggett + grigg architects / t5ol C�1f�O i 11 I RAID / Chi / 1 1 1 �r668� • �, 1 POP Jaw f8� PINE 1 1 f 1 New HOB rrt9.67 1 3 1e Mac. 1 PROPOSED OFFICE BUILDING B f STING FCE 1 DING A Z7 O 11 11� m 1 D >A Q C�- i OVERALL SITE PLAN a S VIc N TY MAP NO SCALE March 31, 2014 15 of 15 M L { i OVERALL SITE PLAN a S VIc N TY MAP NO SCALE March 31, 2014 15 of 15