HomeMy WebLinkAboutZMA201300012 Review CommentsCOMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
NORTHERN REGIONAL OFFICE
Douglas W. Domenech 13901 Crown Court, Woodbridge, Virginia 22193 David K. Paylor
Secretary of Natural Resources (703) 583-3800 Fax (703) 583-3821 Director
www.deq.virginia.gov
Thomas A. Faha
Regional Director
January 7, 2014
Mr. Andrew Boninti
SENT VIA E-MAIL
Rivanna Village, LLC RECEIPT CONFIRMATION REQUESTED
314 East Water Street
Charlottesville, Virginia 22902
Re: Virginia Water Protection (VWP) General Permit Number WP4-13-1230
Rivanna Village, Albemarle County, Virginia
Final VWP General Permit Authorization
Dear Mr. Boninti:
The Virginia Department of Environmental Quality (DEQ) has reviewed your application dated August 2, 2013 and
received August 8, 2013. Based on DEQ's review, the proposed "Rivanna Village Subdivision" project qualifies for the
VWP General Permit Number WP4 in accordance with 9 VAC 25-690-10 et seq. The enclosed VWP general permit
contains the applicable limits, reporting requirements, and other conditions for authorization.
Please note that an Authorization Note has been included on the permit Cover Page outlining the Construction Monitoring
requirements for this permit.
This authorization expires seven years from the Authorization Effective Date. Please note that this authorization may be
extended at the State Water Control Board's discretion and as per the VWP permit regulations. If the authorized activity
has not been completed and you wish to obtain an extension, in accordance with the general permit conditions, you must
request this extension no less than 60 days prior to the expiration date of the VWP general permit authorization, for the
Board's decision, otherwise coverage will expire on the original date.
The work authorized by this permit also satisfies the terms and conditions contained in the Norfolk District, Corps of
Engineers' State Program General Permit (12- SPGP-01) and the special conditions, if any, attached to 12-SPGP-01. No
additional authorization from the Corps is required. Your 12-SPGP-01 authorization is effective as of the date on this
letter and remains effective until May 31, 2017.
If you have any questions, please contact Margaret Quigley at (703) 583-3892 or Margaret.Quigley@deq.virginia.gov.
Respectfully,
JtZ4� A a M.
Trisha M. Beasley
Regional VWPP Program Manager
Enclosures: VWP General Permit, VWP Permit Construction Status Update Form, 12-SPGP-01, 12-SPGP-01 Special
Conditions Form,
cc: Ms. Rachel Roberts, Williamsburg Environmental Group, Inc. — VIA EMAIL
Mr. Vincent Pero, U.S. Army Corps of Engineers, Western Virginia Field Office — VIA EMAIL
COMMONWEAL TH of VIR GINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
VWP General Permit No. WP4
VWP General Permit Authorization No. WP4-13-1230
Authorization Effective date: January 7, 2014
Authorization Expiration date: January 6, 2021
VWP GENERAL PERMIT FOR IMPACTS FROM DEVELOPMENT AND CERTAIN MINING
ACTIVITIES UNDER THE VIRGINIA WATER PROTECTION PERMIT AND THE VIRGINIA
STATE WATER CONTROL LAW
Based upon an examination of the information submitted by the applicant and in compliance with § 401
of the Clean Water Act as amended (33 USC 134 1) and the State Water Control Law and regulations
adopted pursuant thereto, the board has determined that there is a reasonable assurance that the activity
authorized by this VWP general permit, if conducted in accordance with the conditions set forth herein,
will protect instream beneficial uses and will not violate applicable water quality standards. The board
finds that the effect of the impact, together with other existing or proposed impacts to wetlands, will not
cause or contribute to a significant impairment of state waters or fish and wildlife resources.
Subject to the provisions of the Clean Water Act, as amended, and pursuant to the State Water Control
Law and regulations adopted pursuant to it, the permittee is authorized to permanently or temporarily
impact up to two acres of nontidal wetlands or open water and up to 1,500 linear feet of nontidal stream
bed. While this general permit authorized impacts up to two acres non tidal wetlands or open water and up
to 1,500 linear feet of nontidal streambed, this coverage only authorizes impacts as presented in the
Activity Description below.
Permittee: Rivanna Village, LLC
Address: 314 East Water Street; Charlottesville, Virginia 22902
Activity Location: The project site is located on Richmond Road (Route 250), approximately'/2 mile
east of its intersection with Glenmore Way in Albemarle County, Virginia.
Activity Description: The applicant proposes to construct a residential subdivision with associated
infrastructure, on an approximately 95 acre parcel, known as "Rivanna Village Subdivision." The permit
authorizes the total permanent impact of 0.50 acre of surface waters, consisting of 0.04 acre of palustrine
forested wetlands, 0.40 acre of open water, and 0.06 acre (907 linear feet) of stream channel. Permitted
activities shall be as described in the Joint Permit Application dated August 2, 2013 and received August
8, 2013 and additional information received through January 3, 2014. Compensation for permanent
wetland impacts shall be provided through the purchase of 0.08 wetland credits from the James River
Mitigation Bank or from a DEQ approved mitigation bank(s) that is authorized to sell credits to the
VWP General Permit No. WP4-13-1230
January 7, 2014
Page 2 of 2
permitted impact site. Stream channel impacts shall be provided through the purchase of 919 stream
credits from the Innisfree Stream Mitigation Bank or from a DEQ approved mitigation bank(s) that is
authorized to sell credits to the permitted impact site. Credit sales must be in accordance with the
approved Mitigation Banking Instrument for the mitigation bank(s).
The work authorized by this permit also satisfies the terms and conditions contained in the Norfolk
District, U.S. Army Corps of Engineers' (USAGE) State Program General Permit (12-SPGP-01) and no
additional authorization from the USAGE is required. The permittee is responsible for following all
special conditions contained within the 12-SPGP-01 (attached) that are pertinent to the project.
Authorization Note: The VWP Permit Construction Status Update Form enclosed with this permit shall
be completed in June and December of every year during the term of this permit. The VWP Permit
Construction Status Update Form shall include reference to the VWP general permit authorization
number, authorized impacts map and one of the following statements for construction activities within
each impact location: a) Construction activities not started; b) Construction activities started; c)
Construction activities started but currently inactive; or d) Construction activities complete.
The VWP Permit Construction Status Update Form shall be submitted electronically to
vwp.nro@deq.virginia.gov or mailed to the Northern Regional Office, and must be received by DEQ no
later than January 10 and July 10 of every year. These updates fulfill the requirements of conditions
Part II.B.1-3 and II.E.3 of this authorization.
The permittee shall notify DEQ within 24 hours of discovering impacts to surface waters (including
wetlands) that are not authorized by this permit. The notification shall include photographs, estimated
acreage and/or linear footage of impacts, and a description of the impacts.
The authorized activity shall be in accordance with this cover page, Part I - Special Conditions, Part II -
Compensation, Monitoring, and Reporting, and Part III - Conditions Applicable to All VWP General
Permits, as set forth herein.
Jim h a /3?.
Regional VWPP Program
, Department of Environmental Quality
January 7, 2014
Date
`D VWP PERMIT CONSTRUCTION STATUS UPDATE FORM
XIRGIENTOF
ENVIMA� MEP. AL QUALITY
Attached to WP4-13-1230: Permit Issuance Januar 7, 2014
ENVIF�M1MEM1TAL QCALfTl' Y
Date (check one):
❑ June ,
❑ December ,
VWP Permit No:
Project Name:
Status within each authorized surface water impact location, as identified on "Jurisdictional Area Impacts;
Map; Rivanna Village," dated July 16, 2013 with latest revision date of November 11, 2013, and received
November 11, 2013: (check one of the following status options for each impact number/location. Attach
additional sheet(s) if needed.)
Impact number
Construction
activities
started
Construction
activities not
started
Construction
activities started but
currently not active
Construction
activities
complete
PG1
PG2
PSW1
PSW4
PSWS
PR1
PR2
I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing violation.
Authorized Signature:
Print Name:
Title:
Date:
Email:
Phone: