Loading...
HomeMy WebLinkAboutSP199100027 Legacy Document 2014-07-03<C� Ot A1.IiF.,i i.i 9 COUNTY OF ALBEMARLE Department of Zoning 401 McIntire Road Charlottesville, Virginia 22901 -4596 (804) 296 -5875 MEMORANDUM TO: File SP -91 -27 Glenmore - Work In Floodplain File ZMA -90 -19 Frank Kessler - Glenmore P.R.D. The Kessler Group (Attn: Frank Kessler) FROM: Amelia'M. Patterson,,r�, Zoning Administrator DATE: May 29, 1991 RE: Zoning Approval for Work in Floodplain - Compliance with Section 30.3 It is my opinion, after researching relevant files and consulting several staff members, that a new and separate special permit for work currently proposed in the floodplain is not necessary. Therefore, the application for SP -91 -27 the Kessler Group is hereby void, and the fee will be refunded. This memo refers to work shown on the Glenmore Master Plan by Clower Associates, dated September 24, 1990 with last revision on November 2, 1990. This work is also shown on the current erosion control plan. It includes ponds, fill, culverts, grading, utilities and the like, for the golf course, trails and associated elements in the floodplain. Further special permit review under the flood overlay by the Board of Supervisors is not necessary. The floodplain work was adequately addressed with the review of the rezoning so as to sufficiently comply with the intent and procedural requirements of the Zoning Ordinance. This is based on the following: 1. This work was shown on the master plan approved by the Board of Supervisors as the rezoning application plan; Memo on Glenmore - Work in Floodplain May 29, 1991 Page 2 2. A separate application form for special permit submitted with the rezoning (attached) outlines this work in the floodplain. Section 19.3.2 P.R.D. states, ". . . no separate.application shall be required for any such use as shall be included in the original P.R.D. rezoning petition." 3. The work proposed in the flood plain and its impact was discussed in the ZMA and CPA staff reports for the Planning Commission and Board of Supervisors. 4. Mr. Tom Gale has confirmed compliance with Section 30.3 as to the technical components. He has stated that there is no excess filling; that the flood level will not be elevated; and that there will be no negative impact on downstream properties. AMP / s t cc: Marilyn Gale Ron Keeler George St. John Charles Steinman Bob Shaw Reading File " Glenmore"