HomeMy WebLinkAboutARB201400072 Legacy Document 2014-08-14 (3)L J F E IN ESC PHASE 2 SEQUENCE OF CONSTRUCTION: 1) FOLLOWING INSTALLATION OF PHASE 1 ESC MEASURES AND REMOVAL OF EXISTING FEATURES, GRADING MAY COMMENCE, 2) COMMENCE CLEARING AND EARTHWORK. SEED EXPOSED AREAS PROMPTLY. ONCE BUILDING PAD REACHES THE APPROPRIATE ELEVATION, BUILDING CONSTRUCTION CAN BEGIN. 3) INSTALLATION OF SITE UTILITES SHALL BE COMPLETED, INLET PROTECTION SHALL BE INSTALLED ON PROPOSED INLETS AND SITE WATER SHALL BE CONVEYED TO THE INLETS. NOTE: REMOVAL OF INLET PROTECTION ON EX. DI -1 SHALL NOT OCCUR UNTIL APPROVAL BY THE PROJECT ENGINEER AND LOCAL OFFICIALS. 4) COMMENCE CURB CONSTRUCTION. INSTALLATION OF SIDEWALKS MAY BE INSTALLED AT THIS TIME. 5) COMPLETE REMAINING EARTHWORK TO SUBGRADE ELEVATIONS. GEOTECHNICAL ENGINEER TO EVALUATE SUBGRADE SOILS. 6) PLACE AGGREGATE BASE MATERIAL UPON APPROVAL BY GEOTECHNICAL ENGINEER. 7) REMOVE CONTRUCTION ENTRANCE AND DIVERSIONS AND INSTALL ASPHALT. PLACE TOPSOIL. SEED ALL EARTH AREAS PROMPTLY. 8) AFTER FINAL STABILIZATION IS ACHIEVED, INLET PROTECTION MAY BE REMOVED. 9) UPON COMPLETION AND APPROVAL BY THE PROJECT ENGINEER AND LOCAL OFFICIALS THE AREA MUST BE RESTORED TO ITS ORIGINAL CONDITION. ALL ESC MEASURES ARE TO BE REMOVED FROM THE SITE, UNLESS OTHERWISE DIRECTED BY THE PROJECT ENGINEER OR LOCAL OFFICIAL. GRADING NOTES: 1. REMOVE TREES, SHRUBS, GRASS, AND OTHER VEGETATION, IMPROVEMENTS OR OBSTRUCTIONS AS REQUIRED TO PERMIT INSTALLATION OF NEW CONSTRUCTION. REMOVE TREES AND OTHER VEGETATION, INCLUDING STUMPS AND ROOTS, COMPLETELY IN AREAS REQUIRED FOR SUBSEQUENT SEEDING. CUT OFF TREES AND STUMPS IN AREAS TO RECEIVE FILL MORE THAN THREE FEET IN DEPTH TO WITHIN EIGHT INCHES OF THE ORIGINAL GROUND SURFACE. 2. BARRICADE OPEN EXCAVATIONS OCCURRING AS PART OF THIS WORK AND OPERATE WARNING LIGHTS AS RECOMMENDED BY AUTHORITIES HAVING JURISDICTION. 3. CUT SURFACE UNDER PAVEMENTS TO COMPLY WITH CROSS SECTIONS, ELEVATIONS, AND GRADES AS INDICATED. 4. EXCAVATE TRENCHES TO UNIFORM WIDTH CONFORMING TO VDOT STANDARD PB--1 FOR STORM DRAINAGE PIPING. 5. PREVENT SURFACE WATER AND SUBSURFACE OR GROUND WATER FROM FLOWING INTO EXCAVATIONS AND FROM FLOODING PROJECT SITE AND SURROUNDING AREA. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. REMOVE WATER TO PREVENT SOFTENING OF FOUNDATION BOTTOMS, UNDERCUTTING FOOTINGS, AND SOIL CHANGES :]ETRIMENTAL TO STABILITY OF SUBGRADES AND FOUNDATIONS. CONVEY WATER WHEN ATMOSPHERIC TEMPERATURE IS LESS THEN 35 -F (1'C). 6. PROTECT EXCAVATED BOTTOMS OF ALL FOOTINGS AND TRENCHES AGAINST FREEZING WHEN ATMOSPHERIC TEMPERATURE IS LESS THEN 35'F (1'C). 7. FINISH LAWN AREAS TO WITHIN ONE INCH ABOVE OR BELOW REQUIRED SUBGRADE ELEVATIONS. SHAPE SURFACE UNDER WALKS AND PAVEMENTS TO LINE, GRADE, AND CROSS SECTION, WITH NOT MORE THAN 112" ABOVE OR BELOW REQUIRED SUBGRADE ELEVATION. 8. PROTECT GRADED AREAS FROM TRAFFIC AND EROSION. REPAIR AREAS WHICH HAVE SETTLED, ERODED, OR BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST TO OWNER. 9. SPREAD TOPSOIL TO A DEPTH OF 4° OVER ALL DISTURBED AREAS NOT RECEIVING WALKS, PAVEMENT, WALLS OR BUILDING, INCLUDING TRENCHES. IMMEDIATELY FOLLOWING PLACEMENT OF TOPSOIL, DISK THE ENTIRE TOPSOILED AREA AND RAKE FREE OF STONES AND DEBRIS OVER 1/2" IN ANY DIMENSION. PROVIDE A FINISHED SURFACE FREE OF DEPRESSIONS OR HIGH SPOTS. SEED IMMEDIATELY. 10. FINISH GRADE AROUND ALL BUILDINGS SHALL BE A MINIMUM OF 8" BELOW FINISHED FLOOR ELEVATIONS. 11. PROVIDE A MINIMUM OF 5% SLOPE FOR A DISTANCE OF 10' AWAY FROM ALL BUILDINGS FOR POSITIVE DRAINAGE. 12. ALL SIDEWALKS SHALL CONFORM TO ADA REQUIREMENTS WITH A MAXIMUM SLOPE OF 5% AND A MAXIMUM CROSS SLOPE OF 1:48. CONTRACTOR NOTE: 1. CONTRACTOR TO ENSURE THAT NO SEDIMENT ENTERS THE EXISTING STORMWATER CONVEYANCE SYSTEM AND REMAINS ONSITE. ANY SEDIMENT ENTERING THE STORMWATER SYSTEM WILL REQUIRE THE ENTIRE SYSTEM BEING CLEANED, AND CAMERA /VIDEO INSPECTION OF THE SYSTEM MAY BE REQUIRED TO PROVE THE SYSTEM IS CLEAN PRIOR TO RELEASE OF THE WPO BOND. ESC LEGEND TEMPORARY STONE 3.02 CONSTRUCTION CE ENTRANCE 3.03 CONSTRUCTION ROAD STABILIZATION R S 3.Q5 SILT FENCE S F 3 07 STORM DRAIN INLET PROTECTION P 3 ❑� TEMPORARY n DIVERSION DIKE !J 3.30 TOPSOILING TO 3.31 TEMPORARY TS SEEDING 3.32 PERMANENT PS SEEDING 3.35 MULCHING M U 3.38 TREE PRESERVATION & PROTECTION T P 20 0 20 40 SCALE: 1 " = 20' .R W O Q 0 C4 CS ~'O t I r f ��- _ I , .� I � (T01' Of 0p1�AN1 ) - t� I�r, 1 IQP 'j? ____ I_ MITS OF DISTUR NICE I i I 1 SF '�� (T01' Of-- +I��ir'1!1i1 ?LIJ i,.�..r..� _ E E� 7 �? 491 � 11 489.73 �S 89.2 895 ;' } A I (((-te, r�•, : , : _.._` - ---- ....... ...... 4 ❑89.8y0 I +;� I _ 489 86 �± ! 48930 '�'� DD r - I- ' i , 1 ! � I � 9 ,.:, �:...... ■. � � r -'1 488.35:.`. 4 �t �� > >[.{ , ';: I; I= :- 92.Z ,I± 488 2 88.35 1 .. iii" ` �M�tJ� , I IT I i r IS- � 4 P � t 19 l � , f 491 FFE- 492 2 i 0 9 4 4 8 8 .4 C CS I - 1 +r ... ..... X49 .901 488.4 -.. .. _...._.._ -.. '• lr i 4 .7 4 492.00 `� 488.8' 49 .2. 488.35 ' 1 .......... . 1 � �49 •'' ; ' + `I FFE- 492.- - _....._.. _ j 0, rV i' - - ..r. ,J PROPOSED G� ■ - ,, BW49 80. _ OODWI LL ST _ .......... A� _.. � - r ' I r } __.......... y ... _._........_. _ ..... II ; #`1�1. � r 492.�0� -..10 400 S. F. _. 't !rT4J 6.�0 ! . Al 3 'I �.. I� CD, 1 1 +IBW492.80 up 71500 S.F. OF RETAIL 149i 66 ti , , , I ! ! 3 n I ' 49 ,1 I !: , ', �- - 491.60 O.7 3 AC S f , I I , , 1 - - - - - -- 492.20 1 r Y+ i _ 492.10 1� !i 1 o� 1, / i -�a� _............ 492.10 1 _. - -- -_ - -.... I ; � '1 _�___ - - - -- ._.. -- , _ **491 '.60,, ''l ►'` 492.20 SF - �. �t� • � �� �'� � _ F 49a 2,2_ 0 493.20 I 432.20 492.10 10 . 492.10 491.60..-,- FFE =492.2 - - 4 93.10 4 ;FLJSF 4A 6 9 1 ,64 - ! 493:20 D 492.10 I I - - -.. - - - -- � 3 1 49� 67 , 492.10 F I 1493 17 ! � I 492 493' .1 a .4922 6Q 1 �ryA I �y .. �a� Y I _....._ 1 .I . , ' `' -• • - ... : _ 493-50 494.0 492.40 42,4 493.00 SN x3 9W. __ . _. 9 ~:�.�' .' -.- •• - -- ._.:::. , r 1 TO 494.30 TP 4O- " MU ! 493.80 4 ' 1 PS Tt�V494.80 i 4 494.60 4.160 TO o BVti.494.20 494.10' TOPS - IL_ STOCKPILE—_- _- 49944..2700' 4'S '�� ; � I rj I 1 i �: • , , - .QW+494.60 :_:_ -- - - -- - - - - -- - - -- Iiy} r�. W IM ow � up ��...�a "6. 1p �- W � bw =ww a.mw M -ofd i r:� j� ; f� i. _ Ir � 4ss.o`f TP CL M r- ��``�. - .•~� 1 -- - - �r....,_._ .. .. � .�. -,- -. �.: _ I___._ -.__ - .---i- - - .- .... - `f^_:. �. �. bin /�' ` 00 W_ It I a xa f II t 1 r lit , flP 7. \1 LIMITS OF DISTURBANCE I 0 MILL CREEK DRI VE __-ROUT .1 150 (120' R 0 41) ---- - - wrill REFLECTING TOMORROW www.balzer.cc N New RiVeT Valley Richmond Roanoke Shenandoah Valley RESIDENTIAL LAND 0EVELOP14ENT ENGINEERING SITE DEVELOPMENT ENGINEERING LAND USE PLANNING & ZONING M LANDSCAPE ARCHITECTURE LAND SURVEYING ARCHITECTURE STRUCTURAL ENGINEERING TRANSPORTATION ENGINEERING E HVIRONME NTAL & SO] L SCIENCE WETLAND DELINEATIONS & STREAM EVALUATIONS L Balzer and Associates, Inc. 1561 Commerce Road Suite 441 Verona, VA 24482 543- 248 -3220 FAX 540 -248 -3221 K �IiT H OF - -- v �I 'D. Kent O'Donohue, dr. C,, U0. No. 04061001683 J 7 07-11-2014 d � �.4PEAL �W Y F Cw V 0 0 .J 02 � ' D E Z Q J a. Z a_ W Z Q A U � ❑ Q W W J m CSI) Q LL Q 0 U U] Z O U D DRAWN BY DKO DESIGNED BY DKO CHECKED BY ERB DATE 02 -21 -2014 C1 SCALE 1" = 20' 0 REVISIONS: 05 -05 -2014 07-11-2014 SHEET NO. JOB NO. S1 300029