Loading...
HomeMy WebLinkAboutSUB201400110 Approval - County Preliminary Plat 2014-09-03ALg���� � �'IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 September 3, 2014 Dustin Greene Dominion Engineering 172 South Pantops Drive Charlottesville, VA 22911 RE: SUB201400110 Whittington Phase B- Preliminary Plat Mr. Greene: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced subdivision plat. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final subdivision plat for all or a portion of the site within one (1) year after the date of this letter as provided in 14 -226 of the Subdivision Ordinance of the County Code, and thereafter diligently pursues approval of the final subdivision plat. An Erosion and Sediment Control Permit may be issued after the following approvals are received: 1. Approval an Erosion and Sediment Control Plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of a Stormwater Management Plan meeting the requirements of Chapter 17 of the Code. 3. Approval of all easements for facilities for stormwater management and drainage control. 4. Approval of a mitigation plan for the disturbance of Water Protection Ordinance buffers. 5. Submittal of a tree conservation checklist. The final subdivision plat will not be considered to have been officially submitted until the following items are received: 1. A final subdivision plat that satisfies all of the requirements of 14 -226 of the Subdivision Ordinance. 2. A fee of $1,230. Please submit eight (8) copies of the subdivision plat to the Community Development Department. The assigned Lead Reviewer will then distribute the plans to all reviewing agencies. Once you receive the first set of comments on the final subdivision plat, please work with each reviewer individually to satisfy their requirements. The final subdivision plat will not be approved until the following conditions are met: The Department of Community Development shall not accept submittal of the final subdivision plat for signature until tentative approvals for the following conditions have been obtained: Planning Division Approval of (2 copies): 1. A plat meeting all the requirements for final subdivision plats per the subdivision ordinance. 2. [14- 302(A)3] Existing or platted streets. Provide the right -of -way width of State Route 631. 3. [14- 302(A)4 &5] Private & public easements. Label all new easements as 'proposed'. 4. [14- 302(A)9] Building sites on proposed lots. Building sites are required to be the size of the anticipated dwelling footprint plus the area of setbacks /yards. While critical slope disturbance was addressed in the proffers for ZMA200600011, several of the proposed lots are significantly impacted by stream buffer (lots 5, 13, 23, 27, 28, 29 & 76 in particular). Adequate building sites must be provided outside of the stream buffer. Provide a "typical" minimum building site diagram with the resultant required square footage (as indicated above) and show that lots limited by stream buffer in fact provide this minimum required building site. 5. [14- 302(A)11] Instrument creating property proposed for subdivision. Provide the most recent instrument in addition to the information shown on sheet 2. 6. [14- 302(B)5] Zoning classification. Add Entrance Corridor (EC) to the zoning note. 7. [14- 302(8)8 & 18- 19.9.1] Setbacks. The plat indicates that lots 30 -36 will have a 35' rear setback as they are adjacent to RA zoning. Lot 87 also adjoins RA property; please add lot 87 to the list of lots that will have a 35' rear setback. 8. [14- 302(B)10] Stream buffers. Add the following note: "The stream buffers shown hereon shall be managed in accordance with the Albemarle County Water Protection Ordinance." 9. [ZMA200600011 Proffer 1] Prior to Final Plat approval, Phase B must be added to the Covenants and Restrictions of the homeowner's association (assuming CCRs were created for Phase A). This document should include maintenance responsibility for all open space and other privately owned improvements, and must be reviewed and approved by the County Attorney's Office. 10. [ZMA200600011 Proffer 2] Each lot is required to be a minimum of 40,000 square feet. Provide the square footage calculations for each lot rather than the acreages. 11. [ZMA200600011 Proffer 4] Prior to Final Plat approval, an overlot grading plan must be submitted that meets all requirements listed in Proffer 4 for Engineering review and approval. This review may result in a reduction of the number of approvable lots. 12. [ZMA200600011 Proffer 7] The Application Plan approved with ZMA200600011 shows a picnic shelter within Open Space J and two trails leading from Open Space J and connecting to the larger trail system within the subdivision. One of the trails goes through Open Space H connecting to the trail system in Open Space F, and the other goes between lots on Street B and Kendra Street to connect to the trail system in Open Space E. These amenities should be provided as shown on the Application Plan; show the trail system as indicated and note that the picnic shelter will be provided. Prior to Final Plat approval, a performance bond will likely be required for the picnic shelter. 13. [ZMA200600011 Proffer 8] The 25' screening and landscaping easement must be shown and labeled on the plat. A landscaping plan that meets current regulations for screening must be provided, either with the road or WPO plans or as a separate submittal. Maintenance and responsibility of the screening within the easement should be addressed in the Covenants and Restrictions mentioned above. A note alerting affected owners to this easement restriction on their property shall be stated on the Final Plat. 14. [ZMA200600011 Proffer 9] Trail locations and construction details should be provided on the Road and /or WPO Plans. 15. [ZMA200600011 Application Plan] The lot numbers within the subdivision do not match the lot numbering provided on the application plan. To eliminate confusion, please revise the lot numbers on this plat to match the application plan. 16. [Comment] Road Plans and WPO application must be approved, all required improvements must be built or bonded, and all required Deeds and Declarations must be reviewed and approved prior to Final Plat approval. Please contact Ellie Ray at 296 -5832 if you have questions or require additional information. Engineering Division Approval of (1 copy of site plan: WPO plan number stated in application): 1. VDOT approval for road geometry. 2. Please label the contour elevations per survey information or GIS. 3. Walking path Bridges should be shown. 4. Slope of walking path located at the end of Kendra Street appears too steep to traverse. 5. Access roads for storm water maintenance facilities should be shown on the initial plat, but will be required on the final Plat. 6. VSMP requirements will adequately addressed prior to Final Plat Approval. 7. "No Parking" signs may be required. 8. Please delineate the areas of "Low Maintenance Vegetation" as required by Proffer 4d on the plan. 9. Proffer 4f does not appear adequately addressed. 10. Proffer 4g does not appear adequately addressed. 11. Proffer 4h does not appear adequately addressed. Please contact Max Greene at 296 -5832 if you have questions or require additional information. ACSA approval to include (1 copy to County, 3 copies to ACSA): The applicant should submit 3 copies of construction drawings along with water and sewer data sheets to the ACSA (Attn: Jeremy Lynn, PE). The ACSA has determined certain items that will be evaluated during the construction review that the applicant should be aware of: 1. Final water and sewer plans required for ACSA construction approval. 2. Sheet PSP5: ACSA will require a connection to the existing watermain near road St. 26 +50. 3. Sheet PSP5: Waterline relocation plan required at road crossing due to the addition of fill material. 4. Sheet PSP8: Waterline relocation plan required at road crossing due to the addition of fill material. 5. Sheet SPS8: Clearly show Phase A existing infrastructure versus phase B proposed infrastructure. 6. Sheet SPS9: Clearly show Phase A existing infrastructure versus phase B proposed infrastructure. Please contact Alex Morrison at 977 -4511 ext 116 if you have questions or require additional information. E911 approval to include (1 copy): 1. Before final approval can be given the applicant should contact this office with a list of three (3) names for 'Street A', 'Street B', and 'Street C' for approval. Please contact Andrew Slack at 296 -5832 if you have questions or require additional information. Fire & Rescue approval to include (1 copy): 1. Cul -da -sac's shall be 96 ft FC /FC. 2. Fire Flow test required prior to final approval. Please contact Robbie Gilmer at 296 -5833 if you have questions or require additional information. VDOT approval to include (1 copy): 1. Proposed pavement design will need to be verified by pavement design calculations that will need to be submitted with the road plan. 2. Justification for the reduction of the minimum pavement width of 24' to 20' should be added to the typical section for streets "A ", "B ", and "C ". In addition, the typical section for these streets should be noted as "No Parking" on the streets. 3. The typical section for Kendra Street should be noted as "No Parking ". 4. Sheet number 6 of 14 shows storm sewer located within the roadside ditches. What is the purpose of including storm sewer in these areas? 5. On sheet number 11 of 14, is the terminus of Kendra Street shown proposed to be a temporary or permanent turnaround? The preferred turnaround at this location would be a cul -de -sac. The "branch- type" turnaround shown does not appear to have an adequate length or radii. 6. Per Appendix B(1) of the Road Design Manual, cul -de -sacs with unpaved centers should be considered one -away and designed in accordance with Table 3 of Appendix B(1). Refer to page B(1) -24 of the Road Design Manual. 7. On sheet 13 of 14, Route 631 does not appear to be drawn accurately based on the contours provided. The edge of pavement of Route 631 should be field verified and reflected on the preliminary plat. 8. 1 question the availability of adequate intersection sight distance at the intersection of street "C" and Route 631. Sight lines should be provided at each intersection, and sight line profiles should be provided at locations with questionable sight distance such as the intersection of street "C" and Route 631. For 45 mph, the minimum intersection sight distance required is 500 feet. 9. The alignments and locations of the proposed streets may need to be adjusted as the road plans are prepared and reviewed. Please contact Troy Austin at 422 -9373 if you have questions or require additional information. If you have any questions about these conditions or the submittal requirements please feel free to contact me at Extension 3432, eray @albemarle.org. Sincerely, 6'. 26t Ellie C. Ray, PLA Senior Planner