Loading...
HomeMy WebLinkAboutSUB201400141 Correspondence 2015-03-13John Anderson From: Steve Driver [sdriver @terraengineering.net] Sent: Friday, March 13, 2015 1:10 PM To: 'Michael Vieira' Cc: John Anderson; Christopher Perez Subject: RE: Fontana -Phase 4C, Sections 1 &2 approval Michael, Thank you. We'll slip in at some point to pick up. Thanks, Steve Steven L. Driver, PE, LS President Terra Engineering and Land Solutions, PC 2374 Stuarts Draft Highway Stuarts Draft, VA 24477 PH: (434) 244 -0600 x 103 PH: (540) 337 -4591 x103 FX: (540) 337 -5291 C: (434) 989 -8786 From: Michael Vieira [ mai Ito: mvieira @serviceauthority.orcl] Sent: Friday, March 13, 2015 11:48 AM To: sdriver @terraengineering.net Subject: Fontana -Phase 4C, Sections 1 &2 approval Steve, The Fontana -Phase 4C, Sections 1 &2 plans are approved. The stamped plans and approval letter are available to be picked -up at our office. Let me know if you have any questions. Thanks, Michael Vieira, P.E. Civil Engineer Service 1mthi r 168 Spotnap Road Charlottesville, VA 22911 Office: (434) 977 -4511 ext. 113 This e-mail may contain confidential information that should not be shared with anyone other than its intended recipient(s).