HomeMy WebLinkAboutWPO201300072 Inspection 2015-03-19AL�
9
O
GINZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone 11434 Fax � ) 972 -4126
EROSION CONTROL RE- INSPECTION INVOICE #1
DATE: 2/12/2015
INVOICE T0: Woodbriar Associates
c/o Mr. Wendell Wood
P.O. Box 5548
Charlottesville, VA 22905
RE: Briarwood Commercial Lots
WPO- 2013 -00072
Notice to Comply dated 1/15/2015
DATE OF RE- INSPECTION: 2/4/2015
RE- INSPECTION FEE: $250.00
By March 12, 2015 you should forward the re- inspection fee of $250.00 to continue your
project. To pay the re- inspection fee, please send a check payable to the County of Albemarle
to my attention along with the enclosed copy of this invoice.
if you should have any questions, please do not hesitate to contact me.
Sincerely
Todd Shifflett
Engineering Division
VTS/
Enclosure
=�OF ALgn.
��RGINIP
NOTICE TO COMPLY
Hand delivered
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Project: 3n 'o�r Wax) 67m m �Ws i JPO _'2013 - Lly7d,, Date: / -/5-- /S
Under section 17 -900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the
requirements of the VSMP Permit for the referenced project and to immediately take corrective measures
that address the deficiencies on this property. The specific deficiencies are circled below:
Mud on ro�a� - -�$$ hovel and sweep all mud and dirt from the road. Install adequate wash -
- - sk id construction entrance for cleaning. Go f 06i S 4 rci at Q s 1,9,0—f /P/cam
Measures not installed Items not been installed per the approved plan, or have been
removed. Install them, or obtain a plan amendment.
Measures fa' ' easures have failed more than once. Build larger, more effective ones, or
amend the plan to better protect the site. n5 ti 5t �L_ or c,,m -_ ,J P'(,.,
Site abandoned and repairs needed The site is not stabilized and erosion is occurring.
Repair all measures and stabilize.
No inlet protection Inlet protection has not been installed. Install inlet protection per the plans.
Site does not match plans The site has deviated too much from the approved plan, or the
plan was not buildable. A plan amendment is required.
6EPPPdocuments deficie�rrect document deficiencies. 0,4 R 10 -7 J 99
Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP.
not provided or used
M
,e washout facilities
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by: Date:
Re- inspection of this notice to verify corrective measures will incur a $250 fee (17- 207/8, $150 for SF).
Failure to take effective corrective measures will result in a Stop Work Order upon re- inspection.
County Inspector Si
Receipt Signature: