Loading...
HomeMy WebLinkAboutSP200400026 Action Letter e tc e COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5823 Fax (434) 972-4126 October 21,2004 Cindy Newsom 621 Montei Drive Earlysville, VA 22936 RE: SP-2004-00026 Mission Link Proiect! Calvary Baptist Church Amendment (Si/:m #9) Tax Map 77. Parcel 43 Dear Ms. Newsom: On October 13, 2004, the Albemarle County Board of Supervisors took action on SP 2004-00026 to allow a modification of conditions of prior SUP (SP-2001-59) to permit construction of an accessory structure at the existing church on 2.997 acres, in accordance with Section 13.2.2(10)ofthe Zoning Ordinance on Tax Map 77 in the Scottsville Magisterial district. This special use permit was approved by a vote of 5:0 subject to the following six conditions recommended by the Planning Commission: 1. The church's improvements and the scale and location of the improvements shall be developed in general accord with the submitted preliminary site plan entitled, "Site Plan Calvary Baptist Church" received May 26, 2004 and initialed WDF 9/8/04; 2. The total square footage of the building including the proposed expansion shall not exceed thirteen thousand, one hundred (13,100) square feet; 3. Yards and setbacks for structures shall be in accord with the R-1 setbacks, as specified in Section 13.3 in the Zoning Ordinance, to be in effect on March 20, 2002. Parking areas shall be setback at least ten (10) feet from all property lines, except the southern portion of the property that abuts the Southside Shopping Center; 4. There shall be no day care center of private school on site without approval of a separate special use permit, or amendment to this permit; 5. VDOT approval of the proposed entrance aligning with the Southern Parkway must be granted prior to final site plan approval; and 6. A tree conservation plan for the rear forested area of critical slopes in accordance with Section 32.7.9.4(b) shall be submitted with the final site plan. It may only be disturbed under the conditions of connecting to the available public sewer in the rear of the property. Following such activity, the slopes shall be reconstructed and replanted as deemed necessary to comply with Engineering requirements and the approved final site plan. The tree conservation plan shall be subject to review and approval by the Planning Director. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: .---- · compliance with conditions of the SPECIAL PERMIT; and · approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty-four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted action, please do not hesitate to contact Keith Lancaster at 296-5832. Cc: Amelia McCulley Bill Fritz Tex Weaver Chuck Proctor Keith Lancaster