HomeMy WebLinkAboutLZC200800012 Legacy Document 2014-04-07COUNTY OF ALBEMARLF
Department oI' Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832
May 23, 2008
Jeff Galanti
Virginia Land Company
195 Riverbend Drive
Charlottesville, VA 22911
RE: Tax Map 78, Parcels 15C7 and 15F (the "Property")
South Pantops Office Complex III, Charlottesville, VA
Mr. Galanti:
Fax (434) 972-4126
In response to your request for a Letter of Zoning Compliance, please be advised of
the following:
The above referenced -parcels are zoned Highway Commercial (HC) and
located in the Entrance Corridor Overlay District (EC). The HC District allows
a variety of commercial and office uses, including office buildings. The
parcels are not part of a Planned Unit Development.
The "Property" is developed under a site plan, SDP1991-009 as South
Pantops Office Complex III. The buildings contain multiple offices as allowed
by the zoning district. The development was later amended by SDP1992-57
to revise the square footage, allowing 20,330 sq.ft. of gross floor area for the
buildings. The site is served by 94 parking spaces. The site plan provides
parking for office uses, calculated at a rate of 1/200 net floor area (80% of
gross) which totals 82 spaces. The plan shows 94 spaces are provided. The
parking requirement remains the same under the current zoning ordinance
therefore the parking is in conformance. Section 4.12.6 is provided.
The building(s) on TMP 78-15F received a Certificate of Occupancy on June
17, 1993. According to property records, the building(s) on TMP 78-15C7
were completed in 1991. It is the policy of this department to purge building
permit files after three years. Copies of Certificates of Occupancy are
maintained on microfilm. Therefore, we have not retained any copies of
Certificates of Occupancy associated with this pro
Jeff Galanti
May 23, 2008
Page 2
absence of a Certificate of Occupancy for the project will not give rise to any
enforcement action. Please be aware that interior renovation that does not
involve a change of use does not require a Certificate of Occupancy. You may
obtain a copy of a Certificate of Occupancy for an additional fee of $25.00
each.
This office has no record of any pending zoning violations. A site inspection
conducted on May 22, 2008 found no deviations from the site plan and no
potential violations.
Please contact me if you have questions or require additional information.
Sincerely,
John Shepherd,
Manager of Zoning Administration
Enclosures: Sections 24 of the Zoning Ordinance
Section 4.12.6, Parking Regulations