Loading...
HomeMy WebLinkAboutSDP200800086 Review Comments Final Site Plan and Comps. 2008-06-17AN - lit -111�N-1.'. • COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 June 17, 2008 Steve Edwards Terra Concepts 224 Court Square Charlottesville VA 22902 RE: SDP - 2008 -00089 Willow Glen Final Site Plan Dear Sir: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Planner) Albemarle County Division of Zoning & Current Development (Engineer) Albemarle County Department of Fire Rescue Albemarle County Service Authority Virginia Department of Transportation Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by June 30, 2008. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. . Please contact me at your earliest convenience if you have questions or require additional information. Sincere y, Francis H MacCall Senior Planner Zoning & Current Development �pF ALg�, o ®.t IRGII4ZP County of Albemarle Department of Community Development Memorandum To: Steve Edwards From: Francis H. MacCall, Senior Planner Division: Zoning & Current Development Date: 6/16/08 Subject: SDP - 2008 -00086 Willow Glen Final The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will approve the final site plan when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Code of Albemarle.] Proffers: Per proffer #1; 15% of the dwellings units are to be designated as affordable. 35 is the magic number (232 X 15% = 34.8 or 35). Provide a table that breaks down the number of affordable units in each phase making sure that each phase contains a minimum of 12% of the units in that phase designated as affordable. 2. [18- 32.5.6 b] Sheet 2: "Site Specific Notes" - #13 provides a condominium breakdown that appears to be more than what is shown in the parking table. 3. [18- 32.5.6 b] Sheet 2: "Property Size" — It appears that it should be 23.681 AC 4. [18- 32.5.6 b] Sheet 2: "Project Data" Total # of Units/Density — It appears that it should be 232 Units = 9.80 DU /AC 5. [18- 32.5.6 b] Sheet 2: "Breakdown" — The pervious /open space should be shown as individual areas and percentages. 6. [18 -4.12] Sheet 2: "Parking Data" — The total required for the townhouses with 1 car garages should be 40 not 41. This would make the total required 470. The total provided for the townhouses with 2 car garages should be a total of 144 not 108. 2 cars plus 1 in the driveway. 48 X 3 = 144. Also, there actually appears to be 11 additional spaces not 9. This would make the total provided 524. 7. Sheet 2: - "Trip Generation" The number of single family detached should be 22 and the other number should be 210 8. [18- 32.7.2.8] Sheet 5: Note that phase 1 will be built first and that all of the other phases can be built in no particular order. At the southern corner of the amenity pond in Phase 1 the entire pond and path should be included in Phase 1 going around the path. A portion of the parking of Phase 8 appears to be in Phase 1. Not sure why. Unit 99 appears to be split by the phase line between Phases 1 and 8. Include the 1/2 basketball court in Phase 5 since that is when the number of units would go over 100. If the phasing does not proceed numerically then be aware that the 1/2 basketball court needs to be provided when 100 units is reached. 9. [18- 32.5.6 n] Sheets 7 -11: Provide crosswalk hatching in the roads at all appropriate curb cuts along the public and private streets. 12 locations on Sheet 7, 4 locations on Sheet 8, 7 locations on Sheet 10, and 3 locations on Sheet 11. 10. [18- 32.7.2.8] Sheet 7 and 8: Provide sidewalk along the frontage of Dickerson Road. The portion on Sheet 8 should be connected to the sidewalks already shown on Sheet 8. All sidewalks should be shown built to the property lines. 11. [18- 32.5.6 m] Sheet 7: Provide the distance to Airport Road since that is the closest existing intersection. Townwood Boulevard is not in existence yet, so do not refer to that as being the closet intersection. 12. Sheet 7: "Minimum lot and yard requirements" — The table is taken from the rezoning where the types of units are shown. That same labeling is not used on the site plan. Please correct to have the lot numbers correspond with the unit types. 13. Sheet 9: Buildings E and F appear to have parts of the building that are in the 20' perimeter setback. 14. [18- 32.7.2.5] Sheets 7, 8, 19, 20, 38, 39, 44, 45, 51 and 52: Show the interparcel connection being made on all of the appropriate sheets. This will remove the tot lot and landscaping through what will eventually be the interparcel connection to TMP 32 -56. To avoid any confusion in the future Albemarle County is asking that this plan show the interparcel connection being shown on this plan. There may be some ROW issues that engineering may comment on but we feel that they can be resolved by shifting the buildings slightly. 15. [18- 32.5.6 n] Sheet 22: There appears to be a wall stretching behind Lots 41 -44 that is not labeled. 16. [18- 32.5.6 n] Sheets 19 -23: All retaining walls need to be labeled consistently. Some do not appear to be labeled and others are missing information. 17. [ 18- 32.7.9.4] A conservation plan needs to be provided for the preserved tree areas that are being shown on each page of the landscape plan 18. [18- 32.7.9.9 c] Sheet 38: The canopy calculations cannot include both the open space credit and the recreation and preservation credits since the recreation area and the preservation areas are shown within the open space. Deductions shall be cumulative but shall not be duplicative. 19. [18 -4 -16] The amount of recreation area appears to be OK. The number of tot lots does not appear to be OK and the number of 1/2 basketball courts does not appear to be OK. The requirement for tot lots is 4. The 202 townhouse and condo units are used for this calculation. (1 for the first 30 units and 1 for every 50 units. 202 units -30 = 172. 172/50 =3). The requirement for 1/2 basketball courts is 2. The 202 townhouse and condo units are used for this calculation. (1 for every 100 units. 202 units = 2 courts) All tot lots should have the appropriate fencing around them if adjacent to travelways. 20. [18-32.5.6 1 and [ 18- 32.7.5] Provide utility easements for other utilities that will be provided to the units. 21. It is recommended that the landscaping around the 1/2 basketball court enclose the entire area Please contact me at your earliest convenience if you have questions or require additional information. Copy: SDP - 2008 -00086 �l COUNTY OF ALBEMARLE Department of Community Development To: Francis MacCall, Planner From: Amy Pflaum, Engineering Review Subject: SDP- 2008 - 00086, Willow Glen Final Site Plan Date received: 27 May 2008 Date of Comment: 16 June 2008 The final site plan for Willow Glen has been reviewed. A full review of the stormwater management and erosion control plans are pending. Before Engineering can recommend approval, the following items must be addressed: A. General Review Comments 1. Please provide copies of federal and state permits for wetland and stream disturbance (Army Corps, VDEQ, etc.). 2. Please revise the note on Sheet 11 regarding the connection to Towncenter Drive to read "...permission of the COUNTY ENGINEER should a more... ". This will correspond with Proffer #3 on Sheet 2. 3. Please provide all copies of necessary offsite easements on adjacent parcels, including TMP 32 -46 and TMP 32 -50. These easements include, but are not necessarily limited to, road construction and drainage easements. 4. Please add the Deed Book & Page numbers to the existing 30 foot electric easements which are to be removed or relocated. 5. This plan removes the existing entrance to parcel TMP 32 -49B from Dickerson Road and does not provide for its relocation. 6. This plan does not provide for future inter - parcel connectivity to parcel TMP 32 -49B from within the site. 7. Please label proposed retaining walls with maximum wall height. Please provide details for retaining walls. Safety railing is required on walls over 4 feet high. Guardrail is required for retaining walls adjacent to parking or travelways, as well as roads over fill slopes or culverts. 8. There are areas of hatching on the Layout Plans that are not labeled with the type of easements to be dedicated in those areas. Please add labels. 9. Please submit architectural elevations and drawings showing the proposed parking structure. 10. This WPO plan is currently being reviewed independent of the site plan. Additional WPO comments may be given in the reviews to follow. B. Streets, Parking, and Circulation Review Comments 1. VDOT approval is required for any work affecting the public right -of -way. 2. Please revise parallel parking spaces to meet the requirement of 9 feet wide by 20 feet long. 3. Should all the parking spaces under Buildings A, B, and D be full, is there sufficient space for a vehicle to turn around in the travelway? Please demonstrate that there is Albemarle County Community Development SDP - 2007 -00065 Waiver Requests Sheet 2 of 2 sufficient space, or add a turn around at the end of each travelway. 4. This site plan proposes several `dead -end' parking lots. If these lots are full, it will be difficult for a vehicle searching for a space to turn around. It is recommended that these parking lots be revised to provide connectivity or that turn - arounds be added to the ends. 5. Please demonstrate how a garbage truck will turn around after accessing the dumpster at the northwest corner of Building D (Lot 84). 6. If all parking spaces are full in the lot to the east of Building B (Lot 2), how will a garbage truck turn around after accessing the dumpster? 7. To access the dumpster next to Lot 98 on Trudeau Court, a garbage truck will have to block its travelway. 8. Please include a dumpster pad detail or specification per the Albemarle County Design Standards Manual. 9. Please revise the grade of the parking lot to the east of Building B (Lot 2) to be 5% or shallower. 10. Please revise the sidewalks to the east of Buildings A & B to be 6' wide, or add bumper blocks to the abutting parking spaces. 11. The radius is not labeled at the eastern entrance of Trudeau Court onto Prestwick Glen Drive. The parking for lots 97 & 98 being in such close proximity to this entrance may present a safety issue. Parking places must be separated from entrances and streets a minimum of 18' from the back of the entrance radius. 12. The public /private boundary between Prestwick Glen Drive and Trudeau court is awkward. Why not continue the private ROW of Trudeau Court through the intersection and cut Prestwick Glen's public ROW shorter? 13. The street section details are referenced incorrectly on the Layout Plan sheets. The sections for Roads A through F are on Sheet 16, not Sheet 17. Please revise the detail references. 14. The right -of -way of Prestwick Glen Drive is 63 feet, however the width available for a "future interparcel interconnection access easement" is 58 feet. In order for Prestwick Glen to maintain the same road section, a sidewalk easement will be required in Lot 14. 15. In order to avoid future conflict, it may be appropriate to build this connection with this plan. 16. Tempelhof Court is spelled incorrectly on the profile sheets. 17. I am unable to find a curve table for the horizontal curves on the street centerlines. Please provide horizontal curve radii. 18. Please show cross -drain locations, labeled with VDOT designations, at every major cut and fill transition or sag curve. B. ESC Plan Review Comments 1. Please provide a copy of the written agreement between Willow Glen and the owners of the "Sediment/SWM Basin by Others" that allows Willow Glen to utilize this basin for sediment trapping purposes. Also, please verify that this basin has been sized to include the portion of Willow Glen that will drain to it. 2. The Erosion Control Narrative describes the demolition of and clearing around an existing home on the property during Stage 1. This structure is not pictured or otherwise identified on the Erosion and Sediment Control Plan Stage 1. 3. The location of the proposed logging trails described in the Narrative are not shown on Albemarle County Community Development SDP - 2007 -00065 Waiver Requests Sheet 3 of 3 the Plan. 4. A diversion dike may be necessary along the boundary between Zone A and Zone C, depending on the timing of installing the diversion dike proposed within Zone C. If grading commences within Zone A prior to perimeter controls being established within Zone C, exposed soil may erode from Zone A into Zone C, unless a diversion dike is in place. 5. The diversion dikes proposed in Zone B appear to direct run -off around Sediment Trap #1, instead of into it. 6. The maximum allowable drainage area to a diversion dike is 5 acres. Drainage areas larger than 5 acres may require a diversion designed per VESCH STD & SPEC 3.12. 7. Please also provide safety fence with sign around the sediment traps. 8. These comments do not encompass a full WPO application review. A more thorough review of the Erosion and Sediment Control Plan will be done on the WPO submittal of this project. C. SWM Plan Review Comments 1. Please provide a copy of the written agreement between Willow Glen and the owners of the "Stormwater Management Basin by Others" that allows Willow Glen to utilize this basin for water quality and quantity purposes. Also, please verify that this basin has been sized to include the portion of Willow Glen that will drain to it. 2. The minimum standard width for drainage easements is 20 feet. Depending on the size and depth of the proposed storm sewer pipe, an easement may need to be wider. Please check your easement widths using the formula and detail in the Albemarle County Design Standards Manual. 3. Drainage easements are not shown on Sheets 22 and 23. 4. No structures or trees are allowed within drainage easements. 5. Please provide adequate vehicular access to and permanent stormwater management easements around the proposed bio- filters, bio - swales, and bio- detention basin. Adequate access is 10 feet wide, not exceeding 20% in grade. For grades in excess of 10 %, graveled access is required. 6. Please provide adequate access to and permanent stormwater management easements around the stormwater management pond, its riser structure, and the 2 forebays. Adequate access is 10 feet wide, not exceeding 20% in grade. For grades in excess of 10 %, graveled access is required. 7. The piping of the stream under Trudeau Court is labeled as a 48" culvert in the plan views and on Pipe C's profile where it crosses under this storm sewer. This does not correspond to its label as a 48 "x96" arch pipe in its own profile, and to the calculations on Sheet 25. Piping this stream is a significantly important piece of this development, please clarify what this pipe is to be. Please also show the crossing of this pipe in the street profile of Trudeau Court. 8. Please provide overland relief for proposed inlets A -4 and A -5 in case of clogging. The failure of any system should not cause structures or yards to floods. 9. Structure C1 -2 is shown and labeled as a STD MH -1. This structure is the upper -most structure of the proposed pipe run, however, a manhole will not collect any flow. Please explain the necessity of this manhole and its outlet pipe. Albemarle County Community Development SDP - 2007 -00065 Waiver Requests Sheet 4 of 4 10. Please provide a detail for the storm sewer pipe from Shannon Glen Court to Forebay #2 as it goes through the proposed wing wall of the bridge. 11. Please provide a detail for the storm sewer pipe from Tempelhof Court to the bio- detention basin as it goes through the proposed retaining wall. 12. Safety slabs (SL -1) are required for any structure greater than 12 feet deep. 13. Table 7 on Sheet 26 references inlets A5 -5, A5 -6, and A5 -7, these inlets do not exist in the plan or profiles. 14. Provide outlet protection computations for all outlets. 15. A baffle may be necessary in the Amenity Pond between the inlet of Forebay #2 and the pond's outlet structure to assure that the flow is not short circuiting. 16. The trash rack over the riser crest may not be flat (no DI -7), please specify a different trash rack. 17. Will there be 6 or 8 orifices on the pond outlet structure? There appears to be a discrepancy in the detail labeling on Sheet 34. Also, are these orifices really to be 2 feet long, 50% of the 48" length of the side of the structure? 18. A fence is required at or above the maximum water surface elevation when a basin slope is a vertical wall. 19. Show and label the 10 -yr and 100 -yr water surface elevations on all facility cross sections. 20. It appears that the flow in the Bio- Detention Basin may short circuit. 21. Please dimension the base of the Bio- Detention Basin riser structure on Sheet 35. 22. Label the minimum floor dimensions of the bio- filters. 23. Please revise Note 2 on the cross section of Bio- Filter #1 to say "The distance between clean-outs will not exceed 50 feet." 24. The riser crest and invert elevations shown on the outlet structure detail for Bio- Filter #1 on Sheet 36 are incorrect, please revise. 25. The downstream slope of Bio- Filter #2 should be 3:1 or flatter, and labeled as such. 26. Please move Bio -Swale #1 as far outside of the lots as possible. 27. These comments do not encompass a full WPO application review. A more thorough review of the Stormwater Management Plan will be done on the WPO submittal of this project. File: El_fsp_ADP_SDP08- 86_Willow Glen Final Albemarle County Service Authority Serving ♦ Conserving — TO: Francis MacCall FROM: Gary Whelan, Civil Engineer DATE: June 16, 2008 RE: Site Plan Technical Review for: Willow Glen -Final SDP200800086 TM 32 -49F, 49G, 491, 49K The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located approximately 50' distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. X 4. An 8 inch sewer line is located approximately 50' distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. X 7. Water and sewer plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. X 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: RWSA capacity certification is required. The developer is required to upgrade portions fo the offsite sewer and enter into an agreement with ACSA. The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434977 -4511 • Fax (434)979 -0698 www.serviceauthoriy.org