Loading...
HomeMy WebLinkAboutSUB200800212 Legacy Document 2009-04-27ALx? G1 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4012 October 31, 2008 Bent Tree Design 1201 Stony Ridge Rd., Suite I Charlottesville, VA 22903 RE: SUB200800211 Jefferson Ridge Phase A — Preliminary — Tax Map 124, Parcel 5 SUB200800212 Jefferson Ridge Phase B — Preliminary — Tax Map 124, Parcel 6 SUB2008-00213 Jefferson Ridge Phase C — Preliminary —Tax Map 124, Parcel 2 To Whom It May Concern: The Albemarle County Planning Commission, at its meeting on October 21, 2008 approved the above- noted petition, by a vote of 6:0, with the following conditions: 1 . The plat shall be subject to the requirements of Section 14-303 (Contents of final plat), as identified on the "Final Subdivision Checklist" which is available from the Department of Planning and Community Development; 2. All State and Federal permits are required prior to final approval including but not limited to, Army Corps of Engineers approval for impounding State Waters. 3. Mitigation plans will be required for the stream buffer disturbances prior to final approval. 4. VDOT approval for proposed State maintenance is required. 5. Prior to final plat submittal, address all minimum requirements from the Design Standards Manual and Water Protection Ordinance. 6. Road name approval by E-91 1 review for all proposed roads. 7. VDOT approval for all public roads and entrances. Submittal of Road and drainage plans including drainage calculations. Improvements to the intersections / connections to Route 618. Subdivision plans need to be designed in accordance with VDOT's current Subdivision Street Requirements and the Road Design Manual. All commercial entrances and street connections must meet the minimum requirements as described in the Minimum Standards of Entrances to State Highways. 8. Submission of a final Tier III Groundwater Assessment prior to final subdivision plat approval for phase A. 9. Health Department approval for drain fields. 10. Public Recreational Facilities Authority acceptance of easement for preservation lot. 11. Ensure bridges and stream crossings are designed to carry the load of fire apparatus (Virginia Statewide Fire Prevention Code 503.2.6). 12. Stream buffers must be shown correctly before final subdivision plat approval can be granted. 13. Provide confirmation that coordination has taken place with VEPCO and AEPC for grading, construction, and improvements proposed within their easements. The approval of the preliminary plat(s) is valid for one (1) year in accordance with Subdivision Ordinance Section 14-221.A. Therefore, the preliminary approval shall expire on October 21, 2009. If the preliminary plat approval expires, a new application must be filed and processed. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me at (434) 296-5832. Sincerely, . oa�& Gerald Gatobu Senior Planner Zoning and Current Development Cc: Southern Pines Investment, LLC 140 S. Pantops Dr. Charlottesville, VA 22911