HomeMy WebLinkAboutSP200700058 Approval County - Special Use Permit 2008-05-30COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4012
May 30, 2008
Chris Schooley
2421 Ivy Road
Charlottesville, VA 22903
RE: SP2007-00054 SOCA-All Weather Synthetic Field -Belvedere
SP2007-00058 SOCA-Belvedere/Flood Plain Field
Dear Mr. Schooley:
On May 14, 2008, the Albemarle County Board of Supervisors took action on SP #2007-00054
& SP #2007-00058.
Regarding SP2007-00054
To allow soccer field, associated parking and spectator seating adjacent to Belvedere and an
accessory building near soccer fields in the floodplain on a portion of Tax Map Parcel 62A3-1
and Tax Map Parcel 62-2A in the Rivanna District. This special use permit was approved based
on the following conditions:
1. The location of the synthetic field shall be in general accord with the conceptual plan
entitled, "Belvedere — SOCA Special User Permit: All Weather Synthetic Turf Field", and
dated March 28, 2008;
2. Public streets which provide access to the synthetic field and to the parking area shall be
constructed prior to use of the field;
3. Public streets which provide on -street parking to accommodate parking requirements for
the synthetic field shall be a minimum of thirty-two (32) feet in width or other width as
may be required by the County Engineer and approved as a variation by the Director of
Planning;
4. Pedestrian access shall be provided from the end of Belvedere Boulevard to the
synthetic field in accordance with the Albemarle County Design Manual standards for
permanent paths;
5. In conjunction with it review and approval of a site plan or subdivision plat that pertains
to or includes TMP 062A3-00-00-00100, the County may require that Belvedere .
Boulevard be extended to provide public street access to TMP 06200-00-00-002A0;
6. The applicant shall demonstrate as a condition of final site plan approval that the on-site
parking provided for the use, including on-site on -street parking, is adequate for the
proposed use;
7. The hours of use for organized activities and events are limited to the time between 8:00
a.m. and 9:30 p.m.;
8. The applicant shall pay five (5) percent of the cost of a signal at Belvedere Blvd and Rio
Road/Meadow Creek Parkway upon demand of the County or VDOT;
9. The proposed route of the Meadow Creek Parkway or its other manifestation to be
designated on the site plan consistent with the alignment that is shown on the
conceptual plan entitled, "Belvedere — SOCA Special User Permit: All Weather Synthetic
Turf Field", and dated March 28, 2008; and
10. If the use or structure is not commenced by May 14, 2013, this special use permit shall
be deemed abandoned and the authority granted by this permit shall be terminated.
Regarding SP2008-00058
To allow floodplain disturbance for 5 soccer fields on portions of Tax Map Parcels 62-2C, 62A3-
1, and 62-213 in the Rivanna District. This special use permit was approved based on the
following conditions:
1. The fill in the floodplain shall be as shown generally on the plan entitled, "Belvedere
SOCA Special Use Permit: Flood Plain Fields" prepared by McKee Carson and last
dated March 25, 2008;
2. If required by the Federal Emergency Management Agency (FEMA), the applicant shall
obtain a map revision, letter of revision, or letter of amendment. The County Engineer
shall be copied on all correspondence related to changes to the floodplain;
3. Army Corp of Engineers, Virginia Department of Environmental Quality, and other
necessary state and federal agency approvals must be obtained prior to issuance of
grading permits;
4. Natural Resources Manager approval of a stream buffer mitigation plan prior to the
issuance of a grading permit prior to placement of any fill in the floodplain, and County
approval an erosion and sediment control plan prior to the issuance of a grading permit
for placement of any fill in the floodplain;
5. The seven hundred (700) feet -long section of dry-stone wall bounding the inner edge of
the floodplain west and northwest of the proposed flood plain fields as identified in the
Phase I Archaeological Survey and Geoarchaeological Investigation in Two Portions of
the Belvedere Development Property, Albemarle County, Virginia dated February 6,
2008, shall be retained and preserved. The wall shall be clearly identified and labeled on
the plan of development. The fifty (50) feet at the northern end of the wall may be
disturbed for the proposed road construction as currently illustrated on the plan. The
stone that is disturbed by the road construction shall be used to repair remaining
portions of the wall or to extend the wall at its south end. A plan detailing the proposed
re -use of .the stone shall be submitted for review and is subject to the approval of the
Director of Planning prior to the commencement of road construction. Methods for
protecting the remaining wall during construction and for preserving the remaining wall
following construction shall be submitted for review and are subject to the approval of
the Director of Planning prior to the commencement of road construction;
6. Additional archaeological testing, as recommended in the Phase /Archaeological Survey
and Geoarchaeological Investigation in Two Portions of the Belvedere Development
Property, Albemarle County, Virginia dated February 6, 2008, shall be conducted to
more fully assess the extent of cultural resources in Area B of the Belvedere project
area. Based on the findings of this additional testing, additional archaeological studies
and/or treatments may be required. The additional testing shall be conducted by a
qualified archaeologist who meets the qualifications set forth in the Secretary of the
Interior's Professional Qualification Standards. Additional studies required as a result of
the findings of the testing shall be completed prior to disturbance of the site. Treatments
required as a result of the findings of the testing shall be outlined in a treatment plan that
is subject to approval of the Director of Planning; and
7. Construction of the fields and parking lot shall commence on or before May 14, 2016, or
this special use permit shall be deemed abandoned and the authority granted hereunder
shall thereupon terminate.
Please be advised that although the Albemarle County Board of Supervisors took action
on the project noted above, no uses on the property as approved above may lawfully
begin until all applicable approvals have been received and conditions have been met.
This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which an approved special use permit is issued
is not commenced within the time established in the conditions approved by the Board it shall be
deemed abandoned and the permit terminated. The term "commenced" means "construction of
any structure necessary to the use of the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to
contact Sherri Proctor at 296-5832.
Sincerely,
4
Vayn
Cilimberg..
tL
Director of Planning
Cc: Belvedere Station Land Trust; Robert M Hauser & Stan C Manoogian Trs
2421 Ivy Road
Charlottesville, VA 22903
Email Copy: Tex Weaver; Chuck Proctor; Sherri Proctor; Stewart Wright
File