Loading...
HomeMy WebLinkAboutARB201400130 Review Comments Miscellaneous Submittal 2014-10-31ALg�,�� �'IRGINZ�` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 31, 2014 Laura Armentrout Budget Signs LLC 3148 Williamson Road Roanoke, VA 24012 RE: ARB- 2014 -130: Verizon Sign Dear Ms. Armentrout, I have reviewed the above -noted sign application. The following revisions are requested to make the proposal consistent with the Entrance Corridor Sign Guidelines. 1. Only black and white copies of the sign drawings were provided and the photo- renderings are blurry and hard to read. Provide drawings in color that are clear and readable. 2. The sign location on the building could not be determined with the information provided. Provide a plan view drawing with an arrow pointing to the sign location. 3. Approved Comprehensive Sign Criteria for this building limit all channel letter colors to white faces and black trim caps and returns. Revise the sign drawing by changing the red face and trim cap /return color of the "Z" letter to a white face with black trim caps and returns. 4. The sign drawing incorrectly shows the sign band as including the decorative brick band across the bottom of the sign band. Revise the photo- rendering to show the sign band, dimensioned, without the decorative brick band included. 5. Architectural Review Board (ARB) sign guidelines indicate that wall signs should not overcrowd the sign band and that 6" of wall area showing above and below the sign is considered appropriate. The proposed sign does not meet this guideline, appearing too tall for the sign band. Revise the sign drawing by showing a shorter total sign height allowing 6" of wall area, (dimensioned) to show above and below the sign. 6. Revise the sign drawing to include the following note, required by the ARB, limiting LED intensity: The level of illumination provided by the LED lights will not exceed the illumination produced by a single stroke of 30 milliamp (ma) neon. Please respond by email within 15 days of the date of this letter indicating whether you will or will not proceed with these revisions. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these revisions, staff will be unable to approve your application. Failure to respond to this letter shall be presumed to be a request to proceed to action on the application without further revisions. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent Nelson Planner cc: ARB File