Loading...
HomeMy WebLinkAboutWPO201400070 Review Comments WPO VSMP 2014-10-31John Anderson From: John Anderson Sent: Friday, October 31, 2014 9:38 AM To: 'Brian P. Smith' Cc: Glenn Brooks Subject: W P0201400070 Attachments: W P0201400070 -FCCI- 100714 -revl . pdf Brian, Thanks for speaking with me yesterday. I realize you are traveling. I am available 12 -5pm today should you have questions. As discussed, after comparing revised plans (13 -Oct) against review comments (Attached), we are close. Please provide revisions below to speed SWM -ESC plan approval: 1. Furnish notes, C8.0, C8.2, beneath `C' line storm profile, `B' line storm profile that read: "Detention system profile pipe length includes end sections. Hydrologic modeling (C12.0) does not include end sections." Words to that effect. Ref. 7 -Oct Engineering plan review comments: B.3.f.(i), and B.3.g.(i) — Attached. 2. Revise these sheets to show 3 -line (as opposed to 4 -line) rear detention system: L5.2, C11.1, C10.2, C13.0, C14.0, C16.0. 3. Ensure that C10.2 includes SWM underground detention system L x DIA dimensions for both 3 -line detention systems (front /rear). 4. Delete extraneous line drawn across plan view of SWM Control MH -C3 (sheet C8.0). 5. Sheets C10.6 and C16.0 — revise limits of disturbance (LOD), drain field, C16.0, so LOD is consistent between sheets. 6. Furnish whatever additional SWPPP documents you may have. I will ask Dr. Frye the same, via separate email. Note: With (future) Amended WPO Application: sheet C10.6 — revise 0.3799 Ac. pavement to read 0.2041, Short Version BMP Computations, C10.6, to reflect credit for paved area runoff treated by Filterra units. Revision not required at this time. It is unusual to send comments by email, but 29 -Oct, Dr. Frye, Pastor of FCCI, wrote to explain there is urgency. I appreciate all you have done. With revised plans -2 complete sets (All sheets), and 2 additional sets of sheets listed above -the SWMP and ESCP for FCCI will be approved the day I receive them. This is normally 1 -2 days after ACCD receives plans downstairs. No fee with requested revisions, but please provide application form for tracking. No owner signature on application form, as revisions are clarifications, or corrections of a minor nature. Please be sure that every plan sheet is sealed. Feel free to speak with Dr. Frye, so that he is aware of review status. Please feel free to call if you have questions —1 am available after 12. Thanks for your patience —safe travels. John E. Anderson, PE I Civil Engineer II Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069