Ramey Kemp & Associates of Richmond (RKAR) has conducted an analysis of the trip generation for the
proposed Central Virginia Recycling Center. The purpose of this analysis is to estimate the total trips
that are to enter/exit the site during an average weekday because there is little empirical data provided
by ITE for such a facility.
ASSUMPTIONS
Based on discussions with the operator of the proposed facility, the following assumptions were made
for specific operation parameters of the site:
Customers per day - 5 (assumed based on site characteristics)
Truck utilization (dump truck capacity) —80% (based on discussion with client)
Truck utilization (tractor trailer capacity) — 95% (based on discussion with client)
OPERATION OF FACILITY
To determine the number of trips to/from the site based on production, the following was provided
through discussion with the client:
Maximum number of employees — 10 per shift
Number of shifts - 1 per day
- Hours of operation 7AM — 5PM Mon -Fri
7AM — IPM Sat
Grinder operation 51%
Capacity of production 2500 — 2750 CY/wk
Tractor trailer capacity 70-80 CY/load
Dump truck capacity 12-15 CY/load
Maximum dump trucks served 50 trucks/day (limitation of production due to site constraint)
Also note that this analysis is under the assumption that the inflow (dump truck trips only) and outflow
(tractor trailer trips only) of the site are approximately equal under typical daily operations.
RAN. KEMP & ASSOCIATES OF RICHMOND,,Nc.
RAMEY KEMP
4343 Cox Road
Glen Allen, VA 23060
ASRO
Phone - 804-217-8560 Fax - 804-217-8563
TACNATES
ENGINEERS
www.rameykemp.com
November 17, 2008
Mr. Bobby Vess
Central Virginia Recycling Inc.
2330 Commonwealth Drive
Suite 400
Charlottesville, 22901
Reference: Central Virginia Recycling Center
Albemarle County, VA
Subject: Trip generation assessment
Dear Mr. Vess:
Ramey Kemp & Associates of Richmond (RKAR) has conducted an analysis of the trip generation for the
proposed Central Virginia Recycling Center. The purpose of this analysis is to estimate the total trips
that are to enter/exit the site during an average weekday because there is little empirical data provided
by ITE for such a facility.
ASSUMPTIONS
Based on discussions with the operator of the proposed facility, the following assumptions were made
for specific operation parameters of the site:
Customers per day - 5 (assumed based on site characteristics)
Truck utilization (dump truck capacity) —80% (based on discussion with client)
Truck utilization (tractor trailer capacity) — 95% (based on discussion with client)
OPERATION OF FACILITY
To determine the number of trips to/from the site based on production, the following was provided
through discussion with the client:
Maximum number of employees — 10 per shift
Number of shifts - 1 per day
- Hours of operation 7AM — 5PM Mon -Fri
7AM — IPM Sat
Grinder operation 51%
Capacity of production 2500 — 2750 CY/wk
Tractor trailer capacity 70-80 CY/load
Dump truck capacity 12-15 CY/load
Maximum dump trucks served 50 trucks/day (limitation of production due to site constraint)
Also note that this analysis is under the assumption that the inflow (dump truck trips only) and outflow
(tractor trailer trips only) of the site are approximately equal under typical daily operations.