Loading...
HomeMy WebLinkAboutWPO201400039 Review Comments Bond Estimate 2014-12-07Project Name: Erosion and Sediment Control Plan -Van Dine Plaza WPO file number: WP0201400039 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Number 1 stablization (PS, TS) 2 silt fence (SF) $10,950.00 3 safety fence (SAF) $5.00 $2,500.00 4 diversion (DD, FD, RWD) 250.0 ft $5.00 5 temporary slope drain (TSD) pipe length 0 ft 6 earthwork for traR /basin pipe diameter 15 in 7 $35.00 height of dam at toe 9 ft 8 height of fill at face 8 ft 9 2 ft length of dam 140 ft 10 length of cut top width 8 ft 11 (area above transition) 192 sf 12 (total width of dam) 18 ft 13 (height below transition) 1 ft 14 21 ft (area below transition) 8 sf 15 (depth below transitioi (total fill volume) 1037.0 cy 16 length of spillway 18 ft 17 width of spillway 11 ft 18 structures for basin 19 1051 cy riser height 0 ft 20 (spillway stone tons) riser diameter 0 in 21 $570.00 barrel length 0 ft 22 barrel diameter 0 in 23 $200.00 $0 24 $0.00 25 barrel collars 0 26 tree protection baffle length 0 ct. 27 silt fence inlet protection (IP) $0 -50 -If material / tree 28 stone inlet protection (IP) $5.00 $600.00 29 outlet protection (OP), existing 3 -line length 22 ft 30 outlet protection (OP), 24" DIA pipe length 11.5 ft 31 channel (SCC, matted) length 0 ft 32 check dam depth in channel 0 ft 33 construction entrance (CE) $504.56 $504.56 34 wash rack 35 paved construction entrance 10 ft 0 36 rip -rap, placed depth 0 ft 37 $2,000.00 width 0.0 38 survey and layout (price per 0.1 mi.) acres 2.2 39 mobilization 1 $3,500.00 40 stream crossing (computed independently) 0.0 ft 11/07/14, JEA 11/7/2014 No. Unit Unit Cost Cost installed 2.2 acres $5,000.00 $10,950.00 500.0 ft $5.00 $2,500.00 250.0 ft $5.00 $1,250.00 460 ft $13.00 $5,980.00 pipe diameter 15 in $35.00 $0.00 cut at high side 0 ft cut at face 2 ft length of cut 65 ft width of cut 17 ft (area below transition; 42 sf (total width of cut) 21 ft (depth below transitioi -2 ft (area above transition -25 sf (total fill volume) 40.9 cy (TOAL CY estimate) 1051 cy $13.00 $13,663.00 (spillway stone tons) 11.4 tons $50.00 $570.00 (riser unit price) $0.00 $0.00 base plate or fdn 0 $200.00 $0 (barrel unit price) $0.00 $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 -50 -If material / tree 120 ft $5.00 $600.00 0 $100.00 $0.00 0 $200.00 $0.00 width 21.5 ft 1 $2,128.50 $2,128.50 width 9.75 ft 1 $504.56 $504.56 width 10 ft $0.00 channel width 10 ft 0 $0.00 $0.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 length 0.0 ft (tons) 0 tons $60.00 $0.00 traps and basins 1 $1,595.00 $500.00 $0.00 cost sum $45,741.06 proj mgmt $6,861.16 contingency $5,260.22 Total $57,870 11/7/2014 11/7/2014