Loading...
HomeMy WebLinkAboutARB201400090 Review Comments Final Site Plan and Comps. 2014-11-07OF A vIRGIl`�Q` COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 November 7, 2014 Scott Collins c/o Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: ARB201400090 Acme Stove and Fireplace Center Dear Scott: Fax (434) 972 -4126 I have reviewed the plans with the revision date of November 4, 2014 submitted for the above referenced project. I have the following comments. 1. Your memo indicated that architectural plans were revised to indicate that the oak used to wrap the steel columns will be stained or otherwise treated to ensure sustainability of the material. The architectural plans were not submitted for review, so the completion of this item cannot be confirmed. Please submit the architectural plans with a revised trellis detail indicating that the oak used to wrap the steel columns will be stained or otherwise treated to ensure sustainability of the material. 2. The following revisions to the lighting plan are required: a. Indicate on the plan the lamp type for fixture 2. b. Include on the plan a diagram of fixture 2 showing that it is a full cutoff fixture. c. Indicate on the plan that a maintenance factor of 1.0 has been used to calculate the photometrics for fixture 2. d. Indicate on the plan the proposed color of each fixture type. e. If the spot lights (fixture 1) are intended to illuminate a sign on the EC facing wall (not the tower), include a note on the plan indicating that these fixtures will be aimed so as not to project their output beyond an approved wall sign. (Note that approval of the lights does not imply approval of any particular wall sign and illumination of the wall without a sign is not approved. A separate sign permit application is required.) f. Replace the contour line photometric plan with a point -by -point calculation grid so maximum light levels can be more easily and accurately determined. g. Light levels are excessive at each location of fixture 3. EC guidelines state: "Light levels exceeding 30 footcandles are not appropriate for display lots in the ECs. Lower light levels will apply to most other uses in the ECs." Maximum levels not exceeding 20 footcandles is typical in the ECs. Please revise the plan accordingly. h. Indicate on the plan the light levels directly under each location of fixture 2. i. Please indicate the purpose of fixture 4 (is it specifically to illuminate signs on the tower ?) and explain why the spread of light from that fixture, which appears to be pointed back towards the tower, is significantly broader than that of any other proposed fixture. Please forward me one set of revised drawings — site and architectural - together with the attached resubmittal form and a memo summarizing the revisions you've made. If changes other than those requested have been made, identify those changes in the memo. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2014 -90 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB201400090 Acme Stove Submittal Type Requiring Revisions () indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 1 M. Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB2014 -90 1 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 M. Maliszewski