Project:
Old Trail Village, Block 12, Phase 1
Plan preparer:
Roudabush, Gale & Assoc, Inc [914 Monticello Road, Charlottesville, VA
22902, cmulligan @roudabush.com]
Owner or rep.:
March Mountain Properties LLC [1005 Heathercroft Circle, Suite 100]
Dave Brockman, dave@oldtrailvilla ee com
Plan received date:
15 May 2014, block 15
(Rev. 1, bleep 15)
(Vt submittal, block 12)
15 Aug 2014
15 Aug 2014
(Rev. 1, block 12)
20 Nov 2014 (Phase 1); 12 Dec 2014 (Meeting/e- review comment response)
Date of comments:
(Rev. 1, bleek 15)
30 June 2014 (block 15)
29Sep 2014 (b1eek 13, 12)
(Rev. 1, block 12)
15 December 2014 (Phase 1) - Approved
(block 15 road)
15 December 2014 (Phase 1) — Approved (WP0201300021, WP0201400071
Reviewer:
John Anderson
Block 15 and 12 WPO plan comments were combined in prior correspondence. Block 15 comments are removed from this
correspondence, except as they reference block 15 phase 1 road plan. WPO plans are not approved for block 15 phase 2 road
plan. This review approves block 15, phase 1 road plan under elements of WP0201300021 and WP0201400071. Primarily, this
correspondence approves block 12, phase 1 (Lots 1 -7).
SWPPP: Comments have been addressed, including block 15 items #1 -34, 29- Sep -14. Item #35, a. -f will be checked against
future WPO plans. Apart from this, SWPPP comments for blocks 12 and 15 have been addressed. Alteration of block 15
subdivision/road plans, or block 12 (future phases) may yield additional SWPPP comments.
Bonds: Certain block 12, phase 1, ESC measures are bonded under WP0201300021. Likewise, block 15, phase 1 road plan
storm runoff ESC /SWM facilities are bonded under WP0201300021. A few block 15 phase 1 road plan ESC measures are
bonded with (this) WP0201400071, as practical alternative. This review does not approve block 15 phase 2 road plan.
A. Stormwater Pollution Prevention Plan —block 15 (SWPPP) & block 12
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
Ref. County -View for prior comments. Comments removed for simplicity, except item #35, 29- Sep -14 review,
which appears as items a. -g., below-
SWPPP Plan, block 15: [a. -f, RESERVED]
a. Label Court Mont Way.
b. Receiving Waters — revise "runoff from this entire area currently drains into Slabtown
Creek via an existing sediment basin," since not strictly accurate.
c. Receiving Waters — revise "As such, it will provide full containment for the denuded
areas," since not strictly accurate. Limited areas drain east to sediment traps.
d. Stormwater Management — revise "Approved plans (WP0201300021) shall function
as the SWM facility for this development," since WP0201300021 may not provide
full SWM control (see SWM, comment #3, below).
e. Compare Porta john locations: Potential Pollutant Sources, 2 °d paragraph, with
Installation and Maintenance, 7th paragraph — revise for consistency.
f. Include ESC legend. (see SWPPP plan, block 12, Aug -15, 2014)
g. [ For SWPPP plan, block 12, have design engineer sign plan ] (Rev. 1) Comment
addressed.
Engineering Review Comments
Page 2 of 4
B. VSMP: SWPPP: Stormwater Management and Mitigation Plan —block 15 (WPO201400047)
— The stormwater management plan requirements can be found in County Code section 17 -403.
— Ref. County-View for SWMprior comments, items #1 -3, 29- Sep -14 review: (Rev. 1) #1 -3 Addressed-
1 . Re£ prior comments — Addressed.
2. Re£ prior comments — Addressed.
3. Ref. prior comments — Addressed.
New:
4. Ref. prior comment —(Rev. 1) Addressed. RGA response, 20- Nov -14: "The proposed impervious area for
Block 12, Phase 1 = 33,308 s.f., which is less than the 46,286 s.f. of impervious area that was allowed with
WP020130002l ."
5. Ref. prior comment —(Rev. 1) Addressed. RGA response, 20 -Nov: "All of the area for Block 12, Phase 1
is covered under WP0201300021."
6. Ref. prior comment — Comment applies to block 15 [reserved].
7. With revised WPO201400047, please furnish existing conditions with soil types/boundaries. (Rev. 1)
Comment addressed.
8. Furnish pre- /post - development drainage area maps. RGA response: since impervious area proposed with
the Block 12, Phase 1 plans is covered under the WPO201300021 plans, pre- /post - development drainage
area maps unnecessary for WPO plans for Block 12, Phase 1. (Rev. 1) Comment addressed.
9. Propose mitigation for stream buffer impacts (utility work; sheet 3) - §17- 406 — Applies to block 15
[reserved] Note: 326 ft2 stream buffer impact proposed under block 15 phase 1 road plan will be (must be)
mitigated under (future) block 15 phase 2 road plan stream buffer impact Mitigation Plan.
C. VSMP: SWPPP: Erosion Control Plan —block 15 (WPO201400047) — The erosion control plan content
requirements can be found in County Code section 17 -402. [RESERVED]
1. Items 1 -17, and New 8 -19 - /see prior comments.
A. VSMP: SWPPP and Pollution Prevention Plan —block 12 (WP020140007t) — §17-405
(The Virginia stormwater management program, stormwater pollution prevention plan application and
documents
Refer to block 15, above: Comments virtually identical. Oct -2 meeting scheduled for questions.
B. VSMP: SWPPP: Stormwater Management Plan —block 12 (WPO201400071): Refer to block
15, above. WPO201400047 SWM comments (2. -8.) apply to blocks 15 and 12, equally.
C. VSMP: SWPPP: Erosion Control Plan —block 12 (WPO201400071) —The erosion control plan content
requirements can be found in County Code section 17 -402.
1. Provide diversion dike or ditch, west side of modified sediment basin, sheet 3. (Rev. 1) Addressed
2. Revise CE to paved CE with wash rack, sheet 2. (Rev. 1) Addressed.
Engineering Review Comments
Page 3 of 4
3. Revise 668' contour to 666', lower right quadrant, sheet 2, near Future Development Area label. (Rev. 1)
Addressed.
4. Label all drainage easements beyond public RW PRIVATE. Comment applies to blocks 12 and 15 — please
check labels carefully (existing /modified sediment basin, Rowcross St, Court Mont Way, Private alley `A'),
and please accept apology for error. This will be a standard item of review with future VSMP plans.
Easements beyond public RW are Private. (§ 18- 32.7.4.2.a.1.) (Rev. 1) Addressed.
The VSMP permit application and plans are approved for block 12, phase 1, Lots 1 -7. This approval grants VSMP
permit coverage to block 15, phase 1 road plan development, which is a limited portion of Claremont Lane that must
be built to provide safe, convenient access to block 12, lots 1 -7. Disturbed area for block 12, phase 1, Lots 1 -7 and
block 15, phase 1 road plan is included with VAR10043 indexed map dated 9/29/14; therefore, modification of
VAR10043 is not required. There are no additional DEQ or County fees due. Please revise sketch showing VSMP
Permit VAR100043 with future development, including revising boundaries to exclude any areas not covered by an
approved SWM plan. ACCD will notify DEQ of any change in area of coverage under General VPDES Permit
VAR10043.
SKETCH SHOWWG
1' = 500'
VSMP PERMIT VAR100043
VAMOOM
GLOM 67,2%
27,28,29&J5
To U6 Pmd
PROJECT AREA
�.
9LOIX3 13R FIO 17fi
OLD TRAIL VILLAGE
SEPTEMBER 29, 2014
Cld T1
ZMA Lk b
PROJECT AREA IS 86.5 ACRES AND
\
INCLUDES BLOCKS AT OLD TRAIL VILLAGE
CURRENTLY COVERED BY APPROVED WPO
PLANS THAT HAVE BOTH EROSION CONIROL�
AND WATER QUALITY MEASURES. \
e
V Ni 6Pemq
VAMOOM
GLOM 67,2%
27,28,29&J5
To U6 Pmd
rM.•iy
;. R:
�.
9LOIX3 13R FIO 17fi
limits Of
W t
_ `
,
BASIN APFA
W01
o
e
�.
Y e oa s tI AND ri
�
WIN AREA
LAD Of
WMWiRwa is _\
Process:
WPO bond estimate request has been made, estimate prepared. The County's Management Analyst will prepare
bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or
sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and
County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The
County's Management Analyst or other staff will prepare the forms and check for ownership and signature
information. The completed forms will need to be submitted along with court recording fees.
Once bond process is complete, Applicant will need to request a pre - construction conference by completing a form,
and pay the remainder of the application fee (NA). The form identifies the contractor and responsible land disturber,
Engineering Review Comments
Page 4 of 4
and the fee remaining to be paid (NA). This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should everything
proceed satisfactorily, a grading permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
htt-p://www.albemarle.oriz/dentforms.asp?departinent--cdenjZMMo