Loading...
HomeMy WebLinkAboutWPO201400075 Review Comments WPO VSMP 2014-11-24pF A vtl�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer Owner or rep.: Plan received date: (Rev. 1) (Rev. 2) Date of comments: (Rev. 1) (Rev. 2) Reviewer: Rocky Hollow - WP0201400075 Morgan Bell [ Morgan(a1shimp- engineering com ]; Justin Shimp, Shimp Engineering morgan [201 E Main St., Suite M, Charlottesville, VA 22902- 5273 - justinAshimp -en incering com ] Adriana K. Tuerk, Trustee of the Adriana K. Tuerk Living Trust [P.O. Box 85, Isla, FL 33036] 29 August 2014 23 October 2014 10 November 2014; 21- Nov -14 — Approved 1 October 2014 4 November 2014 24 November 2014 (+ 17.Nov.14 e- comments /ref County-View) John Anderson A. Stormwater Pollution Prevention Plan Approval pending The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Furnish SWPPP /PPP —focus on land disturbance. Please use 8 -p. SINGLE- FAMILY STORMWATER POLLUTION PREVENTION PLAN TEMPLATE found at VDEQ Construction General Permit website: hrik - http: / /www.deq.vir ig nia.gov/ Portals /0 /DEQ/ Water /StormwaterManagement /CPoD SWPPP SFR 201407.docx.E (Rev. 1) Comment partially addressed. As follow -up, please ensure that Construction Activity Operator matches Construction Activity Operator on General VPDES Permit Registration statement. Ensure all pages requiring signature are signed by Operator. (Rev. 2) Comment addressed. [SWPPP submittal pending jeal 1/24/14, per tel.con M. Bell, 24- Nov -14] 2. Submit a General VPDES Permit Registration Statement — please ensure that statement is signed. Please ensure that Item 9, Estimated Area to be Disturbed is consistent with ESC plan (1.91 ac.). (Rev. 2) Comment addressed. B. VSMP: SWPPP: Stormwater Management Plan VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, comments satisfactorily addressed. The stormwater management plan content requirements can be found in County Code section 17 -403. Submit VSMP Application/SWM plan. Application form may be found on County website, Engineering Applications and Forms (last .pdf) —fee based upon total area of disturbance (1.91 Ac.) Note: project is subject to SWM requirements since disturbance >1.0 Ac. [§ 17- 303.C.] Although code makes provision for Agreement in lieu of a stormwater management plan (§ 17- 403.B.), definition of Agreement in lieu of a stormwater management plan (§ 17 -205) implies compliance with requirements of the VSMP. Relief or exceptions from the requirements of the VSMP (§ 17 -408) appear so limited as to be of negligible benefit. (Rev. 1) Comment addressed. SWM and Mitigation plans combined: sheet dated 10/21/14. As follow - up, if 30' wooded buffer =2.94 Ac. is to be used for SWM compliance, ensure permanent conservation easement preserves this 30' buffer. Also, please reconcile wooded area =2.94 Ac. with 7.41 Ac. (post- Engineering Review Comments Page 2 of 4 developed) forest area, Drainage Area `A'(.xls submitted 10/22; ref. #2, below), if preservation is an element of SWM runoff reduction water quality (phosphorus) compliance. (Rev. 2) Comment addressed. 2. This is new development: please use VaRRM New Development spreadsheet — link: http: / /www.deq.vir ig nia.gov/ Portals /0 /DEO /Water/ StonnwaterManagementNRRM /VRRM_Spreadsheets_ v2.8 2013.zip (Rev. 1) Comment addressed. As follow -up to VaRRM .xls sent as email attachment (Wed 10/22/2014 4:45 PM), please provide permanent conservation easement protection for 7.41 Ac. of forest (elsewhere on property). Alternatively, adjust BMP practices such that compliance does not rely on permanent forest conservation easement. (Rev. 2) Comment addressed; ref County -View .xls sent as e- attachment, 17- Nov -14. 3. Furnish SWM Narrative. (Rev. 1) Comment addressed. Note: May elect to control runoff at any point or location on developed property, including near residence. Also —VSMP Registration Statement is not required. [ §17 -40 LC] (Rev. 1) Note is in error: VSMP Registration statement is required. Please complete Registration Statement. —Also, SWPPP, A.2., above. (Rev. 2) Comment addressed (21- Nov -14 submittal). C. VSMP: SWPPP: Erosion Control Plan Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, comments satisfactorily addressed. The erosion control plan content requirements can be found in County Code section 17- 402. L C2 — Expand project description to include: drive length; critical slope disturbance (sf); stream buffer disturbance (14,756 sf); and any alternative driveway alignments considered. - §17- 402.C.5. (Rev. 1) Comment addressed. 2. C2 — Sequence: describe provisions for stream bypass, or work in live stream. Note: Obtain state - federal permits to work in live stream. — Sequence, Stage 1, item #3 — requires detailed narrative. (Rev. 1) Comment addressed. 3. C3 — Clarify /specify grading improvements to existing logging road, slope 13.5 %. (Rev. 1) Comment addressed. 4. C3 —Show spoils and stockpile locations, if any. (Rev. 1) Comment addressed. 5. C3 —Show staging area; equipment maintenance /refueling location. (Rev. 1) Comment addressed. 6. C3 Identify /show stream buffer mitigation area: possibility exists west of driveway along stream where GIS photometric data shows reach with minimal buffer. (On sheet C3, area near soil label 79B that is adjacent to soil area 89B is one possible location.) (Rev. 1) Comment partially addressed. As follow -up, identify additional areas (within stream buffer elsewhere on property) suitable for mitigation plantings. —Also, #23 -24, below. (Rev. 2) Comment addressed. 7. C4 — Show /shade critical slope areas. Areas shown on C3, but please transfer to F =10' view, C4. (Rev. 1) Comment partially addressed — printing caused light hatch to fade. Light hatch is not visible. Ensure critical slopes are visible on C4. (Rev. 2) Comment addressed. 8. C4 —Label outlet protection L x W x D dimensions (OP). (Rev. 1) Comment addressed. 9. C4 — Furnish driveway culvert near box culvert to divert ditch flow from stream to SWM BMP. (Rev. 1) Comment addressed. 10. C4 — Furnish SF on graded slopes at box culvert outfall to limit sediment deposition in stream. (Rev. 1) Comment addressed. 11. C4 —Show 100' stream buffer. (Rev. 1) Comment partially addressed. As follow -up, recommend heavier line weight, sheet C4 /ESCP. Show stream buffer on SWM Plan, C1. (Rev. 2) Comment addressed. 12. C4 —Show wood /forest line. (Rev. 1) Apparent printing error, please show or note wood line. (Rev. 2) Comment addressed. 13. C4 —Show or define angle of each wing wall relative to box culvert. (Rev. 1) Comment addressed. 14. C4 — Recommend aprons, box culvert, given site /stream conditions. [VDOT Drainage Manual, Engineering Review Comments Page 3 of 4 8.3.3.4.6] Troy Austin, VDOT, may be able to provide guidance /assistance: 434.422 -9373. (Rev. 1) Comment addressed. Design response noted: "based on channel conditions and the Drainage Manual, we believe that an apron is not necessary." (SE response letter, 21- Oct -14) 15. C4 — Identify ESC feature south of driveway -brick symbol = riprap ditch? (Rev. 1) Comment addressed. 16. C4 — Provide /specify ground cover hardier than grass for slopes steeper than 3:1. [ACDSM 8.A.2.] (Rev. 1) Comment addressed. 17. C4 — Furnish EC -1 stabilization matting for slopes at wing walls at outlet end of box culvert. (Rev. 1) Comment addressed — review error: mixed terms. As discussed 3 -Nov with Justin, SE decision to use EC -1 (stone) offers slope stabilization superior to EC -2 matting. 18. C5 — Furnish box culvert wall, floor, ceiling dimensions. Provide steel reinforcement schedule, or specify pre -cast system. (Rev. 1) Comment partially addressed, perhaps misinterpreted. Please furnish box culvert wall, floor, and ceiling thickness. Furnish steel reinforcement for structure: walls, floor, and ceiling. Details integral to design of box culvert should be shown [§ 17- 102.A.]. (Rev. 2) Comment addressed. 19. C5 — Driveway section: identify surface material; identify base material. Show dimensions /depth. (Rev. 1) Comment addressed. 20. C5 — Furnish cross - section of stream bed at box inlet: stream bed elevation affects countersinking, which affects free height. [§ 17- 402.C.5; Drainage Manual, 8.3.7.2.2]. Estimate /show OHW at box culvert inlet, and stream width. (Rev. 1) Comment partially addressed — please check location/elevation of 10 -year storm line, sheet C5, culvert profile. (Rev. 2) Comment addressed. 21. C5 — Confirm box culvert design per VDOT Drainage Manual 8.3.7.2.3 — "determine the required hydraulic opening (size) based on no countersinking; then specify the next larger size structure." And, Drainage Manual, Ch. 15, DDM 1 -6: Summary of General Design Criteria. (Rev. 1) Comment addressed. 22. Furnish Foundation Investigation: "Foundation data will be requested for all culvert installations with a diameter or span of 36 inches or greater." [VDOT Drainage Manual, Ch. 15, DDM 1 -13] (Rev. 1) Comment addressed. Design response noted: "Foundation notes have been added to sheet C5. Based on standard assumptions for native soil in the area, it [streambed] should be able to withstand the weights of the box culvert and driveway." (SE response letter, 21- Oct -14) New: a. Space constraints limit length of construction entrance; CE should not extend beyond stream. Revise length. (Rev. 2) Comment addressed. D. VSMP: Mitigation Plan - Approved — The mitigation plan requirements can be found in County Code section 17 -406. 23. Furnish mitigation plan. Identify potential candidate stream buffer mitigation areas on property, ideally, within 100' of stream. (Rev. 1) Comment partially addressed. As follow -up, ensure stream buffer impact is reported consistently (14,756 sf, C4, v. 15,660 sf— Mitigation Plan). Also, please note 2: 1 mitigation -to- replanting requirement (ref. email -Mon 11/3/2014 3:10 PM). (Rev. 2) Comment addressed. 24. Furnish mitigation planting schedule- options, below: (Rev. 1) Comment partially addressed — As follow -up, see #23, above. (Rev. 2) Comment addressed. Engineering Review Comments Page 4 of 4 1. Option l — Mitigate through new plantings and permanent protection as given below. New plantings must be in the stream buffer area. Applicant has choice of planting one of the following: a. For every 400 square foot unit or fraction thereof, plant one (1) canopy tree measuring 1 'la"— 2" caliper or a large evergreen 6 feet in height, one (1) understory tree measuring N" — 1 Vz" caliper or one evergreen 4 feet in height, and one (1) small shrub 15" — 18" in height. b. For every acre or fraction thereof, plant 1,210 hardwood and/or pine seedlings on approximately 6'XO' center% without tree tubes and mats. c. For every acre or fraction thereof, plant 600 hardwood and/orpine seedlings on approximately 8'X8' centers with tree tubes and mats. 2. Option 2 — Mitigate by preserving existing buffer where currently not required by ordinance; Lo. preserve stream buffers on intermittent streams in the development areas. Mitigation must be accomplished by permanent protections as given below. Permanent Protection for each of these options will be inclusion in the Thomas Jefferson Soil and Water Conservation District (TJSWCD) Easement Program, or recordation of a permanent maintenance agreement and escrow to run with the land. The VSMP permit application and all plans are approved. Please provide two (2) additional copies of ESCP, SWM, and Mitigation plans; two copies of SWPPP (1 with original signature). These submittals are necessary to continue process described below. Plan reviewer is available at 434 - 296 -5832 -0069 should you have any questions. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to request a pre - construction conference by completing a form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htlp://www.albemarle.oriz/deptforms.asp?departtnent=cdenaMMo WP0201400075 -rocky hollow escp -pvt residence - 112414 -rev12