Loading...
HomeMy WebLinkAboutARB201400094 Review Comments Final Site Plan and Comps. 2014-11-24• ^�- 11�illr IlIIf1.�• COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax(434)972-4126 November 24, 2014 Chris Norvelle Shimp Engineering 201 E. Main St., Ste. M Charlottesville, VA 22901 RE: ARB201400094 Riverside Village Dear Chris: I have reviewed the revisions recently submitted for the above referenced project (including site plan with revision date of 11/14/14, architectural elevation sheet A3 revised 11 -5 -14, and architectural elevations dated September 15, 2014). The revisions included in these drawings satisify the outstanding conditions of ARB approval. You may consider this letter your Certificate of Appropriateness. This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used. The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan, attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will require an amendment to the plan and must be reviewed and approved by the Architectural Review Board. Please note the following: 1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance Corridor. 2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the signing of mylars and the approval of building permits. It is in the applicant's best interest to notify ARB staff of such changes and to initiate the review of amendments to ARB- approved plans to avoid future delays. 3. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years. Applicants requesting an extension of the period of validity must do so in writing. The letter must be received by the Director of Planning prior to the expiration date. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: Riverside Village Properties Inc., 200 Garrett St, Ste. S, Charlottesville VA 22902