HomeMy WebLinkAboutSUB201400080 Review Comments Road Plan and Comps. 2014-12-11John Anderson
From: John Anderson
Sent: Thursday, December 11, 2014 4:49 PM
To: 'Raleigh Davis'
Cc: Plaster, Shelly (VDOT); Troy Austin; Johnathan Newberry; Bill Ledbetter;
dave @oldtrailvillage.com
Subject: RE: Old Trail Village Block 15 Road Plans
Raleigh,
I viewed the .pdf and see Phase 1 waterline work is proposed along the length of Court Mont Way, down Fielding Run,
and across Rowcross, proposed to extend to areas that have no block 12 WPO (ESCP) coverage. I didn't expect this. You
may want to discuss with Bill —we must streamline: limit review to block 12 /Lot 1 -7 final site plan, block 12 WPO plan,
limited section of Claremont Lane (block 15 road/phase 1, per AM meeting plans), and SWM /ESC control for runoff
(future bioretention) or land disturbance (ESCP) associated with Claremont (via block 12 WPO). Make sense? If not for
WPO shortfall, this may have worked, but I cannot approve. Is it possible to show hatching as discussed earlier today?
The labels are perfect. Thank you, Raleigh -
From: Raleigh Davis [ma i Ito: RDavis @rouda bush. com]
Sent: Thursday, December 11, 2014 3:30 PM
To: John Anderson
Cc: Plaster, Shelly (VDOT); Troy Austin; Johnathan Newberry; Robbie Gilmer; jlynn @serviceauthority.org; Bill Ledbetter;
Chris Mulligan; dave @oldtrailvillage.com
Subject: RE: Old Trail Village Block 15 Road Plans
John,
I have made the revisions to the Phase Lines in the Block 15 Road & Utility Plans per our earlier phone
conversation. Hopefully all of the previous confusion with the phase lines will be cleared up now. Here is a
Dropbox link to the updated version of the Block 15 Road & Utility Plans:
https://www.dropbox.com /s /l9ajjOtfbozflg2 /BLK %2015 %20ROAD %20PLANS %2012 -11-
14% 20PER %20JOHNS %2000MMENTS.pdf?dl =0
After reading the email that was addressed to Shelly below, I don't feel that VDOT needs to review the Final Site
Plans for Block 12. The inlet and storm pipe that is located in the corner of Lot 7 (STR #13 to STR #41) is actually
included in the Block 15 Road & Utility Plans (I don't think I made that very clear when we spoke on the phone
earlier). The other storm sewer system that is located on the western end of Court Mont Way (STR #11 to
STR #7 /temp. outfall) is private and does not need to be reviewed by VDOT.
I hope this makes sense, but if you have any questions feel free to contact me.
Thank you,
Raleigh Davis
Roudabush, Gale, and Associates
914 Monticello Rd.
Charlottesville, VA 22902
434 - 977 -0205 [office]
From: Bill Ledbetter
Sent: Thursday, December 11, 2014 2:03 PM
To: Raleigh Davis
Subject: FW: Old Trail Village Block 15 Road Plans
Bill Ledbetter
Roudabush, Gate and Associates
914 Monticello Road
Charlottesville, Virginia 22902
434 - 977 -0205 office
540 - 649 -0190 cell
434 - 296 -5220 fax
From: John Anderson [ mailto :janderson2aalbemarle.org]
Sent: Thursday, December 11, 2014 1:44 PM
To: Plaster, Shelly (VDOT); Robbie Gilmer; Jeremy Lynn; Margaret Maliszewski
Cc: Bill Ledbetter; Troy Austin; Chris Mulligan; Johnathan Newberry; Dave Brockman
Subject: RE: Old Trail Village Block 15 Road Plans
Shelly,
Thanks so much for your time earlier today. You, Troy, and JT spoke with me at length, which was very helpful.
I spoke with Raleigh (RGA) a while ago. She will add labels to clarify block 15 road plan phase lines we did not
understand earlier. The lines relate to Phase 1 /ACSA 12" waterline installation. There will be no block 12 road plan
(Phase 1 or future) since block 12 as proposed includes no public RW. Please review block 12 site plan as you would any
site plan, comment as appropriate. Inlet, pipe, pavement design must meet VDOT standards on Court Mont Way.
Engineering will compare design with prior block 12 road plan comments. Nothing should slip past us, and past review
comments remain relevant. Once Shelly makes slight revisions to phase lines on block 15 road plans, portion of
Claremont required to develop block 12 Lots 1 -7 should be more clear. Raleigh gently reminded me there is no need for
road plans for block 12 since there is no public RW. There will be public drainage easement, Lot 7, private drainage
easement, Lot 1 (block 12 Phase 1 final site plan / final plat).
All design features required for agency /departmental reviews are present (or available, RGA). I have spoken with
Johnathan, who understands.
As Chris notes, phasing is less than ideal, yet it works, and has been discussed with County Engineer. I just wish I had
been more helpful to you earlier today.
Jeremy, Robbie,
please provide block 12 site plan review comments to Johnathan Newberry, and block 15 road plan comments to
Applicant and me as soon as possible, especially need approvals —1 know you will. thank you!
All:
Once block 15 (both phases) road plan is approved by all parties, ACCD will prepare block 15 Phase 1 subdivision/road
plan bond estimate, which will be bonded. ACCD will prepare block 15 Phase 2 subdivision/road plan bond estimate,
which cannot be bonded until there is an approved WPO plan for treatment and detention of storm runoff from Phase 2
roads, block 15 development. ACCD is close to approving WPO plan for block 15 Phase 1 road plan, and block 12 site
plan development. Shelly, please comment on block 12 site plan as you would any site plan. Thank you!
Bill,
Please coordinate block 12 site plan submission with Margaret Maliszewski, ACCD /ARB.
Chris, Raleigh, Bill,
I realize you are waiting for ACCD /Engineering block 15 road plan comments. I cannot send immediately, meetings 2 -4,
but will send by 9am, tomorrow. That's the best I can do.
Chris, I appreciate your note, below-
Thank you!
From: Chris Mulligan [ mailto:CMulligan @roudabush.com]
Sent: Thursday, December 11, 2014 1:07 PM
To: Plaster, Shelly (VDOT)
Cc: Bill Ledbetter; Troy Austin; John Anderson
Subject: RE: Old Trail Village Block 15 Road Plans
Shelly,
As has been the case lately, the client is hard - pressed to get the 7 lots underway as quickly as possible. I believe that all
of the reviewers are onboard with 'making it happen', and I wanted to remind you all of our goal. Currently, the plans
have been revised to accommodate the VDOT and Engineering comments, as well as those of ACSA. This morning we
met with John Anderson to bring him up to speed with the current revisions and timeline. Hopefully, we will be able to
finalize these to his satisfaction, addressing all of the pertinent concerns by weeks end.
With that said, referencing our recent meeting with Troy, we will be resubmitting the plans including all of the changes,
and hope that VDOT will be able to assist us in expediting approval of the Block 15 Road Plans.
Since we had a road plan in process, Block 15, we phased this construction to allow for the construction of 7 lots on
Block 12. (portion of Claremont)
At this point, we are clarifying the construction phasing between plans sets, but do not anticipate any additional design
changes necessary for approvals. We recognize that the plan phasing /orientation is less than ideal, but in discussions
with Glenn, the above process allows for the quickest possible approval timeframe, while providing the proper bonding
mechanism needed by the county to obtain surety.
As before, we will submit plans directly to you at the same time they are delivered to the county, so as to assist with
your process review. Should you want to go over any of the changes to assist in expediting approval of these plans,
please let me know, and I will make arrangements to do so.
We greatly appreciate your relevant comments and assistance,
('4iwis /ffa / / #air
914 Monticello Road
Charlottesville, Virginia 22902
(804) 437 -2788 (cell)
From: Plaster, Shelly (VDOT) [mailto:Shelly .Plaster @vdot.virginia.gov]
Sent: Tuesday, December 02, 2014 4:39 PM
To: Chris Mulligan
Cc: Bill Ledbetter; Austin, Nathran. (VDOT); John Anderson
Subject: Old Trail Village Block 15 Road Plans
Good afternoon,
Please see attached comment letter regarding Old Trail Village Block 15.
Kind regards,
Land Development Engineer
Charlottesville Residency
701 VDOT Way
Charlottesville, VA 22911
Phone: (434) 422 -9894
Fax: (434) 984 -1521