Loading...
HomeMy WebLinkAboutSDP201400063 Review Comments Major Amendment, Preliminary Plan 2015-01-07Ellie Ray From: Alex Morrison [ amorrison @serviceauthority.org] Sent: Wednesday, January 07, 2015 1:50 PM To: 'Kelly Strickland'; Ellie Ray Cc: justin @shimp - engineering.com Subject: RE: Bojangles final plans Ellie, I have reviewed the revisions provided by the applicant and have no further comments. I hereby recommend approval of SDP201400063. The applicant should be advised that prior to the ACSA signing the final site plan, a full copy of the most recent version of the plan should be submitted to my attention at the ACSA. The plan copy is required for our files, prior to signing the final site plan. Thank you. Alexander J. Morrison, EIT Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434 - 977 -4511 Ext. 116 (F) 434 - 979 -0698 Like the ACSA on Facebook at www.facebook.com /acsaconnect From: Kelly Strickland [mailto:kelly @shimp- engineering.com] Sent: Wednesday, January 07, 2015 10:50 AM To: Ellie Ray Cc: justin @shimp- engineering.com; amorrison @serviceauthority.org Subject: RE: Bojangles final plans Okay, thanks. I've copied Alex to see if he has any more concerns but his requested changes were minor so we're hoping to get this finalized today. -Kelly From: Ellie Ray [mailto:erayCabalbemarle.org] Sent: Wednesday, January 07, 2015 10:46 AM To: Kelly Strickland Cc: justin (ash imp - engineering.com Subject: RE: Bojangles final plans I haven't received any word from ACSA that they've given their tentative approval. So, if you're planning to submit for signature, I will need that first. Four signature sets are always required. Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Kelly Strickland [mailto:kelly shimp - engineering.com] Sent: Wednesday, January 07, 2015 10:15 AM To: Ellie Ray Cc: justin @shimp - engineering.com Subject: Bojangles final plans Good Morning Ellie, Justin has signed a final plan for Bojangles that addresses ACSA comments. How many copies would you like us to deliver? Thanks, Kelly Strickland Shimp Engineering, PC 434.981.6029 From: Alex Morrison [ mailto: amorrisonCi)serviceauthority .org] Sent: Wednesday, January 07, 2015 8:08 AM To: 'Kelly Strickland' Subject: RE: Bojangles fixture counts Kelly, I did receive the document. Thank you. Alexander J. Morrison, EIT Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434 - 977 -4511 Ext. 116 (F) 434 - 979 -0698 Like the ACSA on Facebook at www.facebook.com /acsaconnect From: Kelly Strickland [ mailto :kelly(ashimp- engineering.com] Sent: Tuesday, January 06, 2015 3:55 PM To: Alex Morrison Cc: Will Gordon; eray @albemarle.org; justin(ashimp- engineering.com Subject: RE: Bojangles fixture counts Alex, This e -mail was too large and bounced back, so I am resending it with just the two sheets that are changed. Let me know if you receive it. -Kelly From: Kelly Strickland [ma i Ito: kelly @shimp- engineering.com] Sent: Tuesday, January 06, 2015 3:49 PM To: 'Alex Morrison' Cc: 'Will Gordon'; eray @albemarle.org; justinCcishimp -en_ ineering.com Subject: RE: Bojangles fixture counts Alex, Per your request below, I am attaching a copy of the revised plan for Bojangles with the following changes: Sheet C4: Corporate Stop note and Water Meter note have been changed to specify a 1.5" meter /vault requirement Sheet C5: The 1" water meter detail has been replaced with a 1.5" meter and vault detail These changes have been highlighted with a revision clouds. Ellie, This should be the final requested changes for the site plan and we will sign and deliver copies for final approval. Thanks, Kelly Strickland Shimp Engineering, PC 434.981.6029 From: Alex Morrison [ mai Ito: amorrison (aserviceauthority.org] Sent: Tuesday, December 30, 2014 10:26 AM To: 'Kelly Strickland' Cc: 'Will Gordon' Subject: RE: Bojangles fixture counts Kelly, I have ran the numbers and you fall in the range of a 1.5" water meter. This is mainly caused by the flush valve toilets and urinals. Please update the plan to call out a 1.5" water meter and include the 1.5" water meter vault detail. If you send me a PDF copy of both updated pages I will recommend approval through the county. Alexander J. Morrison, EIT Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434 - 977 -4511 Ext. 116 (F) 434 - 979 -0698 Like the ACSA on Facebook at www.facebook.com /acsaconnect From: Kelly Strickland [ mailto :kelly(&shimp- engineering.com] Sent: Tuesday, December 30, 2014 9:29 AM To: amorrison Ca)serviceauthority.org Cc: Will Gordon Subject: RE: Bojangles fixture counts Alex was going to finish this last Tuesday when I sent the e -mail below. He is in today and I just left him a voice mail to make sure he has everything and is able to sign off for us. -Kelly From: Kelly Strickland [mailto:kelly shimp- engineering.com] Sent: Tuesday, December 23, 2014 10:15 AM To: 'amorrisonna serviceauthority.org' Cc: iustin @ shimp -en_ ineering.com Subject: Bojangles fixture counts Hello Alex, Here are some architectural and plumbing sheets for the Bojangles site. Sheets P01 and PO4 have fixture schedules. Let us know if you need anything else to complete your review. Thanks, Kelly Strickland Shimp Engineering, PC 434.981.6029