HomeMy WebLinkAboutSDP201400063 Review Comments Major Amendment, Preliminary Plan 2015-01-07Ellie Ray
From: Alex Morrison [ amorrison @serviceauthority.org]
Sent: Wednesday, January 07, 2015 1:50 PM
To: 'Kelly Strickland'; Ellie Ray
Cc: justin @shimp - engineering.com
Subject: RE: Bojangles final plans
Ellie,
I have reviewed the revisions provided by the applicant and have no further comments. I hereby recommend approval
of SDP201400063.
The applicant should be advised that prior to the ACSA signing the final site plan, a full copy of the most recent version
of the plan should be submitted to my attention at the ACSA. The plan copy is required for our files, prior to signing the
final site plan. Thank you.
Alexander J. Morrison, EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434 - 977 -4511 Ext. 116
(F) 434 - 979 -0698
Like the ACSA on Facebook at www.facebook.com /acsaconnect
From: Kelly Strickland [mailto:kelly @shimp- engineering.com]
Sent: Wednesday, January 07, 2015 10:50 AM
To: Ellie Ray
Cc: justin @shimp- engineering.com; amorrison @serviceauthority.org
Subject: RE: Bojangles final plans
Okay, thanks.
I've copied Alex to see if he has any more concerns but his requested changes were minor so we're hoping to get this
finalized today.
-Kelly
From: Ellie Ray [mailto:erayCabalbemarle.org]
Sent: Wednesday, January 07, 2015 10:46 AM
To: Kelly Strickland
Cc: justin (ash imp - engineering.com
Subject: RE: Bojangles final plans
I haven't received any word from ACSA that they've given their tentative approval. So, if you're planning to submit for
signature, I will need that first. Four signature sets are always required.
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Kelly Strickland [mailto:kelly shimp - engineering.com]
Sent: Wednesday, January 07, 2015 10:15 AM
To: Ellie Ray
Cc: justin @shimp - engineering.com
Subject: Bojangles final plans
Good Morning Ellie,
Justin has signed a final plan for Bojangles that addresses ACSA comments.
How many copies would you like us to deliver?
Thanks,
Kelly Strickland
Shimp Engineering, PC
434.981.6029
From: Alex Morrison [ mailto: amorrisonCi)serviceauthority .org]
Sent: Wednesday, January 07, 2015 8:08 AM
To: 'Kelly Strickland'
Subject: RE: Bojangles fixture counts
Kelly,
I did receive the document. Thank you.
Alexander J. Morrison, EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434 - 977 -4511 Ext. 116
(F) 434 - 979 -0698
Like the ACSA on Facebook at www.facebook.com /acsaconnect
From: Kelly Strickland [ mailto :kelly(ashimp- engineering.com]
Sent: Tuesday, January 06, 2015 3:55 PM
To: Alex Morrison
Cc: Will Gordon; eray @albemarle.org; justin(ashimp- engineering.com
Subject: RE: Bojangles fixture counts
Alex,
This e -mail was too large and bounced back, so I am resending it with just the two sheets that are changed.
Let me know if you receive it.
-Kelly
From: Kelly Strickland [ma i Ito: kelly @shimp- engineering.com]
Sent: Tuesday, January 06, 2015 3:49 PM
To: 'Alex Morrison'
Cc: 'Will Gordon'; eray @albemarle.org; justinCcishimp -en_ ineering.com
Subject: RE: Bojangles fixture counts
Alex,
Per your request below, I am attaching a copy of the revised plan for Bojangles with the following changes:
Sheet C4: Corporate Stop note and Water Meter note have been changed to specify a 1.5" meter /vault
requirement
Sheet C5: The 1" water meter detail has been replaced with a 1.5" meter and vault detail
These changes have been highlighted with a revision clouds.
Ellie,
This should be the final requested changes for the site plan and we will sign and deliver copies for final approval.
Thanks,
Kelly Strickland
Shimp Engineering, PC
434.981.6029
From: Alex Morrison [ mai Ito: amorrison (aserviceauthority.org]
Sent: Tuesday, December 30, 2014 10:26 AM
To: 'Kelly Strickland'
Cc: 'Will Gordon'
Subject: RE: Bojangles fixture counts
Kelly,
I have ran the numbers and you fall in the range of a 1.5" water meter. This is mainly caused by the flush valve toilets
and urinals. Please update the plan to call out a 1.5" water meter and include the 1.5" water meter vault detail. If you
send me a PDF copy of both updated pages I will recommend approval through the county.
Alexander J. Morrison, EIT
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(0) 434 - 977 -4511 Ext. 116
(F) 434 - 979 -0698
Like the ACSA on Facebook at www.facebook.com /acsaconnect
From: Kelly Strickland [ mailto :kelly(&shimp- engineering.com]
Sent: Tuesday, December 30, 2014 9:29 AM
To: amorrison Ca)serviceauthority.org
Cc: Will Gordon
Subject: RE: Bojangles fixture counts
Alex was going to finish this last Tuesday when I sent the e -mail below.
He is in today and I just left him a voice mail to make sure he has everything and is able to sign off for us.
-Kelly
From: Kelly Strickland [mailto:kelly shimp- engineering.com]
Sent: Tuesday, December 23, 2014 10:15 AM
To: 'amorrisonna serviceauthority.org'
Cc: iustin @ shimp -en_ ineering.com
Subject: Bojangles fixture counts
Hello Alex,
Here are some architectural and plumbing sheets for the Bojangles site. Sheets P01 and PO4 have fixture schedules.
Let us know if you need anything else to complete your review.
Thanks,
Kelly Strickland
Shimp Engineering, PC
434.981.6029