Loading...
HomeMy WebLinkAboutWPO201400090 Review Comments Erosion Control Plan 2015-01-05pg ALp,, t. kri 17 kGINlP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 VSMP Permit Plan Review Project title: Key West Water Main Replacement Project file number: WPO- 2014 -00090 Plan preparer: Michael Baker, Jr., Inc. Owner or rep.: Albemarle County Service Authority Plan received date: 19 December 2014 Date of comments: 5 January 2015 Reviewer: Justin Deel County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and maintenance agreements. A. Stormwater Pollution Prevention Plan (SWPPP) 1) [Comment] Please use the standard template from the county website. [Revision 1] Comment addressed. SWPPP now follows County template. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. [Comment] Please provide. [Revision 1] Comment addressed. PPP now Section 6 of SWPPP. C. Stormwater Management Plan (SWMP) 1. [Comment] Please provide. [Revision 1] Comment addressed. D. Erosion and Sediment Control Plan (ESOP) 1. [Comment} Silt fencing on outside of channel from about STA 9 +00 to about STA 13 +00 will likely provide little sediment control. Use check dams here or show silt fencing between channel and disturbance. [Revision 1] Addressed. Silt fencing in question replaced with check dams. 2. [Comment] Please provide date and source of topographic information. [Revision 1] Addressed. 3. [Comment] Provide explanation of and for darkly hatched areas seen throughout plans. [Revision 1] Addressed. 4. [Comment] Show staging /stockpile area(s) on plans. [Revision 1] Addressed. Engineering Review Comments Page 2 of 2 Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference. Applicants will need to complete the request for a pre - construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.oriz/deptfonns.asp?department=cdengwpo Sincerely, Justin Deel