Loading...
HomeMy WebLinkAboutWPO201400076 Review Comments Bond Estimate 2015-01-06 (3)Project Name: ACME Stove and Fireplace Center WPO file number: WP0201400076 Erosion and Sediment Control Bond Estimate Item Item Number stal lization (PS, TS) all fence (SF) safety fence(SAF) diversion (DD, FD, RW D) temporary slope drain (TSD) earthwork for trap /basin earthwork for trap /basin ,'14111 . .}jar. sift fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) channel (SCC, matted) check dam construction entrance (CE) wash rack paved construction entrance pipe length height of dam at toe height of fill at face length of dam lap width (area above transition) (total width of dam) (height below transition) (area below tranalllon) (total fill volume) length of spillway width of spillway height of dam at ice height of fill at face length of dam lap width (area above transition) (total width of dam) (height below transition) (area below transition) (total fill volume) length of spillway width of spillway ser height er diameter barrel length barrel diameter M rip-rap, placed depth width survey and layout (price par 0.1 mi.) acres mobilization stream crossing (computed independently) 0 ft pipe diameter 0 in 0 ft cut at high side 4 ft 0 ft cut at face 4 ft 20 it length of cut 70 ft 4 ft width of cut 25 ft 0 sf (araa below transition) 132 sf 0 ft (total width of cut) 41 ft 0 ft (depth below lransilior 0 ft 0 sf (area above transition) 0 sf 0.0 cy (total fill volume) 342.2 cy 4.2 ft (TOAL CY estimate) 342 cy 10 ft (spillway stone tons) 24 tons 0 it cut at high side 3 ft 0 it cut at face 3 ft 120 it length of cut 100 ft 4 ft width of cut 20 ft 0 at (area below transition) 78 sf 0 ft (total width of cut) 32 ft 0 ft (depth below lransilior 0 ft 0 sf (area above transition) 0 sf 0.0 cy (total fill volume) 288.9 cy 3.3 ft (TOAL CV estimate) 289 cy 10 ft (spillway stone tons) 1.9 tons Oft 0 in rlaar unit price) $0.00 0 ft base plate or Win 0 0 in (barrel unit price) WOO barrel collars 0 baffle length 0 ft 5 ft wid h 5 ft 100 ft width 4 ft 0 ft channel width 0 ft 0 ft length 1.0 ft 0.0 o tons 1 traps and basins 2 No. Unit Unit Cost cost (installed) 0.8 acres $5,000.00 $4,050.00 380.0 ft $5.00 $1,900.00 0.0 ft $5.00 $0.00 0 ft $13.00 $0.00 $0.09 $0.00 $13.00 $4,446.00 $50.00 $120.00 $13.00 $3,757.00 $50.00 $95.00 $60.00 $0.00 $1,500.00 $500.00 $0.00 cost sum $23,300.50 proj mgmt $3,495.08 contingency $2,679.56 Total $29,480 12/4/2014 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 $100.00 $0.00 4 $200.00 $800.00 1 $112.50 $112.50 $520.00 1 $0.00 $0.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $0.00 $1,500.00 $500.00 $0.00 cost sum $23,300.50 proj mgmt $3,495.08 contingency $2,679.56 Total $29,480 12/4/2014