HomeMy WebLinkAboutWPO201400076 Review Comments Bond Estimate 2015-01-06 (3)Project Name: ACME Stove and Fireplace Center
WPO file number: WP0201400076
Erosion and Sediment Control Bond Estimate
Item Item
Number
stal lization (PS, TS)
all fence (SF)
safety fence(SAF)
diversion (DD, FD, RW D)
temporary slope drain (TSD)
earthwork for trap /basin
earthwork for trap /basin
,'14111 . .}jar.
sift fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
channel (SCC, matted)
check dam
construction entrance (CE)
wash rack
paved construction entrance
pipe length
height of dam at toe
height of fill at face
length of dam
lap width
(area above transition)
(total width of dam)
(height below transition)
(area below tranalllon)
(total fill volume)
length of spillway
width of spillway
height of dam at ice
height of fill at face
length of dam
lap width
(area above transition)
(total width of dam)
(height below transition)
(area below transition)
(total fill volume)
length of spillway
width of spillway
ser height
er diameter
barrel length
barrel diameter
M
rip-rap, placed depth
width
survey and layout (price par 0.1 mi.) acres
mobilization
stream crossing (computed independently)
0 ft
pipe diameter
0 in
0 ft
cut at high side
4 ft
0 ft
cut at face
4 ft
20 it
length of cut
70 ft
4 ft
width of cut
25 ft
0 sf
(araa below transition)
132 sf
0 ft
(total width of cut)
41 ft
0 ft
(depth below lransilior
0 ft
0 sf
(area above transition)
0 sf
0.0 cy
(total fill volume)
342.2 cy
4.2 ft
(TOAL CY estimate)
342 cy
10 ft
(spillway stone tons)
24 tons
0 it
cut at high side
3 ft
0 it
cut at face
3 ft
120 it
length of cut
100 ft
4 ft
width of cut
20 ft
0 at
(area below transition)
78 sf
0 ft
(total width of cut)
32 ft
0 ft
(depth below lransilior
0 ft
0 sf
(area above transition)
0 sf
0.0 cy
(total fill volume)
288.9 cy
3.3 ft
(TOAL CV estimate)
289 cy
10 ft
(spillway stone tons)
1.9 tons
Oft
0 in
rlaar unit price)
$0.00
0 ft
base plate or Win
0
0 in
(barrel unit price)
WOO
barrel collars
0
baffle length
0 ft
5 ft
wid h
5 ft
100 ft
width
4 ft
0 ft
channel width
0 ft
0 ft
length
1.0 ft
0.0
o tons
1
traps and basins
2
No. Unit Unit Cost cost
(installed)
0.8 acres $5,000.00 $4,050.00
380.0 ft $5.00 $1,900.00
0.0 ft $5.00 $0.00
0 ft $13.00 $0.00
$0.09 $0.00
$13.00 $4,446.00
$50.00 $120.00
$13.00 $3,757.00
$50.00 $95.00
$60.00 $0.00
$1,500.00
$500.00
$0.00
cost sum $23,300.50
proj mgmt $3,495.08
contingency $2,679.56
Total $29,480
12/4/2014
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
0 $100.00
$0.00
4 $200.00
$800.00
1 $112.50
$112.50
$520.00
1 $0.00
$0.00
0 $2,000.00
$0.00
1 $2,000.00
$2,000.00
1 $3,500.00
$3,500.00
$60.00 $0.00
$1,500.00
$500.00
$0.00
cost sum $23,300.50
proj mgmt $3,495.08
contingency $2,679.56
Total $29,480
12/4/2014