HomeMy WebLinkAboutWPO201400076 Review Comments Bond Estimate 2015-01-06Project Name: ACME Stove and Fireplace Center
WPO file number: wpo201400076
Stormwater Management Plan Bond Estimate for 2 bioretention basins
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not inlet)
drop inlet or grate
manhole structure (per ft. nee)
pipe, rcp. crop (15 to 48 ")
aggregate base or drainage stone
sanhwork for trap/basin
structures for basin
0.0 in d
15.0 in d
height of dam at toe
height of 611 at face
length of dam
top width
(area above transition)
(total width of tlam)
(height below transition
(area below transition)
(total fill volume)
length of spillway
width of spillway
near height
riser diameter
barrel length
barrel diameter
tress
shrubs
seedlings
underdmin(LF)
bloflter soil mix (Cy)
trash rack) and vortex devices
maintenance access road (LF)
ril placed depth
width
survey and layout (price per 0.1 mi.) acres
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
0 ft length 0.0 ft
0.0 (tons) 0
1 basins 2
No. Unit Unit Cost Cost
(installed)
0 ft $13.00 $0.00
0 ea $500.00 $0.00
0 as $3,500.00 $0.00
0 ft $450.00 $0.00
0.0 ft $0.00 $0.00
133.0 ton $35.00 $4,655.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
19 as
0 ES-1,2
0 EC -1
$50.00 $3,250.00
80.0 ftL
19.0 ftw
0 ft
cut at high side
0 ft
0 ft
cut at face
0 ft
0 ft
length of cut
0 ft
0 ft
width of cut
0 ft
0 at
(area below transition)
0 at
0 ft
(total witlth of cut)
0 ft
0 ft
(depth below transition
0 ft
0 sf
(area above transition)
0 at
0.0 cy
(total 611 volume)
00 cY
0 ft
GOAL CV estimate)
0 cy
0 ft
(spillway stone tons)
0 tons
0
Oft
0 in
(riser unit price)
$000
0 ft
base plate or ran
0
0 in
(barrel unit price)
$0.00
barrel collars
0
baffle length
0 ft
0 ft length 0.0 ft
0.0 (tons) 0
1 basins 2
No. Unit Unit Cost Cost
(installed)
0 ft $13.00 $0.00
0 ea $500.00 $0.00
0 as $3,500.00 $0.00
0 ft $450.00 $0.00
0.0 ft $0.00 $0.00
133.0 ton $35.00 $4,655.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
19 as
$150.00 $2,850.00
65 as
$50.00 $3,250.00
10 as
$5.00 $50.00
165 ft
$5.00 $825.00
169 cY
$38.00 $6,422.00
2 ft
$1,500.00 $3,000.00
0 ft
$50.00 $0.00
$60.00 $0.00
$1,500.00
$500.00
1 as
$2,000.00 $2,000.00
1 as
$2,000.00 $2,000.00
1 as
$5,000.00 $5,000.00
$0.00
cost sum
$32,052.00
pmt mi
$4,807.80
contingency
$3,685.98
Total
$40,550
1/6/2015