Loading...
HomeMy WebLinkAboutWPO201400076 Review Comments Bond Estimate 2015-01-06Project Name: ACME Stove and Fireplace Center WPO file number: wpo201400076 Stormwater Management Plan Bond Estimate for 2 bioretention basins Item Item Number permanent diversion or ditch standard manhole frame top (not inlet) drop inlet or grate manhole structure (per ft. nee) pipe, rcp. crop (15 to 48 ") aggregate base or drainage stone sanhwork for trap/basin structures for basin 0.0 in d 15.0 in d height of dam at toe height of 611 at face length of dam top width (area above transition) (total width of tlam) (height below transition (area below transition) (total fill volume) length of spillway width of spillway near height riser diameter barrel length barrel diameter tress shrubs seedlings underdmin(LF) bloflter soil mix (Cy) trash rack) and vortex devices maintenance access road (LF) ril placed depth width survey and layout (price per 0.1 mi.) acres mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 0 ft length 0.0 ft 0.0 (tons) 0 1 basins 2 No. Unit Unit Cost Cost (installed) 0 ft $13.00 $0.00 0 ea $500.00 $0.00 0 as $3,500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 133.0 ton $35.00 $4,655.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 19 as 0 ES-1,2 0 EC -1 $50.00 $3,250.00 80.0 ftL 19.0 ftw 0 ft cut at high side 0 ft 0 ft cut at face 0 ft 0 ft length of cut 0 ft 0 ft width of cut 0 ft 0 at (area below transition) 0 at 0 ft (total witlth of cut) 0 ft 0 ft (depth below transition 0 ft 0 sf (area above transition) 0 at 0.0 cy (total 611 volume) 00 cY 0 ft GOAL CV estimate) 0 cy 0 ft (spillway stone tons) 0 tons 0 Oft 0 in (riser unit price) $000 0 ft base plate or ran 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft 0 ft length 0.0 ft 0.0 (tons) 0 1 basins 2 No. Unit Unit Cost Cost (installed) 0 ft $13.00 $0.00 0 ea $500.00 $0.00 0 as $3,500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 133.0 ton $35.00 $4,655.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 19 as $150.00 $2,850.00 65 as $50.00 $3,250.00 10 as $5.00 $50.00 165 ft $5.00 $825.00 169 cY $38.00 $6,422.00 2 ft $1,500.00 $3,000.00 0 ft $50.00 $0.00 $60.00 $0.00 $1,500.00 $500.00 1 as $2,000.00 $2,000.00 1 as $2,000.00 $2,000.00 1 as $5,000.00 $5,000.00 $0.00 cost sum $32,052.00 pmt mi $4,807.80 contingency $3,685.98 Total $40,550 1/6/2015