Loading...
HomeMy WebLinkAboutSDP201400053 Review Comments Final Site Plan and Comps. 2015-01-22JI K: ^1 COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 Charles A. Kilpatrick, P.E. Commissioner January 22, 2015 Ms. Megan Yaniglos Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Re: SDP - 2014 -053 Chick -fil -a Dear Ms. Yaniglos: We have reviewed the Chick -fil -a final site plan, as submitted by Horton & Dodd, P.C., on December 11. 2014, and offer the following comments: 1. VDOT has no objection to the site plan as submitted. 2. The proposed traffic signal will be handled under a separate permit and the maintenance of traffic plan will be required prior to issuance of the permit. If you need further information concerning this project, please do not hesitate to contact me at (434) 422 -9894. Sincerely, J Shelly A. Plaster Land Development Engineer Culpeper District r� Ot'AL p�r � IRGS?at� County of Albemarle Department of Community Development Memorandum To: Greg Dodd From: Megan Yaniglos- Senior Planner Division: Planning Services Date: September 9, 2014 Subject: SDP - 2014 -053 Chick- Fil -A- Final Site Plan The Planner for the Planning Services Division of the Albemarle County Department Community Development will recommend approve the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] Requirements: 1. The Tree Conservation checklist must be signed by the owner. The owner's signature piece is missing from the sheet. Please contact Megan Yaniglos at the Department of Community Development 296 -5832 ext. 3004 for further information. pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 9724126 Project: Chick -Fil -A Final Site Plan SDP201400053 Plan preparer: Horton & Dodd, P.C. [gdodd @hdpc.net] Owner or rep.: FLYNN, CORVEN D & KATIE H Plan received date: 21 July 2014 Date of comments: 20 August 2014 Reviewer: Max Greene The Final Site Development Plans for Chick -Fil -A submitted 21 July 2014 have received Engineering Review. The plans do not appear to meet Albemarle County minimum checklist items for engineering approval. The following items will be adequately addressed prior to Engineering recommending approval of the site plan. 1. Water Protection plans will be approved prior to final site plan approval. See WP0201400072 for information on Water Protection Plan Approval. 2. VDOT approval is required prior to final site plan approval. 3. ASCA approval is required prior to final site plan approval. 4. The following items are from the initial site plan review that do not appear adequately addressed: a. The travel way grade from Route 250 East bound lane appears to be @ 12.5 % on the profile and up to 16.5% on the plan view. Please coordinate the plan and profile to match for adequate review. b. Could not locate the note for "Low Maintenance Ground Cover on Slopes 3:1 and Greater ". Please clarify location on plan for adequate review. c. Proposed 542 contour line does not appear connected to the existing 542 contour on the Northwest side of the site along the proposed stairs. d. Please remove unused details from plan. The angled parking detail is an example. 5. Please provide a Luxor road section at station 10 +75 or 11 +00 for clarification of proposed road construction. 6. Please state the proposed speed limit for Luxor Road Extension on the plans. Per the Clear Sight Distance Triangles and the proposed slope of the inbound lane from Route 250 it appears to be a 15 mile per hour road. 7. Stormwater Management Agreement is required to be recorded in the Clerk of the Court. Please use the following links for the SWM agreement and procedures: htW: / /www.albemarle.org/upload /images /forms_ center / departments /Community Development/forms/En-ins? eeringtia nd WPO Forms/Plan Review - _Stormwater_Management _BMP_ Facilities_ Maintenance _Agreement_Procedures.pdf htW: / /www.albemarle.org/upload /images /forms_ center / departments /Community Development /forms /Engineering a nd_WPO_ Forms/Plan _Review - Stormwater_Management _BMP_ Facilities_ Maintenance_Agreement.pdf You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on Maintenance Agreements. Due to the requested changes for the review committee, additional comments or requested changes may be forthcoming for final approval of the Site development plan. File: CDDF.I_sdp_MRG_Chick -Fil -A Final.doc Lrf2C;l1�ZA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 11, 2014 J. Gregory Dodd, P.E. Horton & Dodd 300 George Washington Hwy N. Chesapeake, VA. 23323 RE: ARB201400021 — Chick -Fil -A Pantops - Final TAX MAP PARCEL: 078000000055A2 Dear Mr. Dodd: At its meeting on Monday, April 7, 2014, the Albemarle County Architectural Review Board took the following actions: Regarding the Initial Site Plan By a vote of 5:0, forwarded the following recommendations to the Agent for the Site Review Committee: Regarding requirements to satisfy the design guidelines as per § 18- 30.6.4(2), (3) and (5): None. Regarding recommendations on the plan as it relates to the guidelines: None. Regarding recommended conditions of initial plan approval: A Certificate of Appropriateness is required prior to final site plan approval. Regarding conditions to be satisfied prior to issuance of a grading permit: • Coordinate proposed grading and tree protection fencing to ensure the health of the three maple trees to remain in the right -of -way along the EC. • Provide evidence of grading and planting easements. Regarding the final review of the site and architectural design By a vote of 5:0, the Board voted to grant approval of the Certificate of Appropriateness, pending staff administrative approval of the following conditions: 1. Provide VLT and VLR values for the window glass showing that visible light transmittance (VLT) shall not drop below 40% and visible light reflectance (VLR) shall not exceed 30 %. 1. Revise the elevations to correctly identify north, south, east and west. Assume Rt. 250 runs east - west. 2. Indicate the type of glass proposed for the service yard door. 3. Provide the dumpster details on the site plan. 4. Indicate the height of the transformer located northeast of the building. Ensure that visibility of the transformer from the EC will be eliminated. 5. Add the mechanical equipment note to the site plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 6. Revise the photometric plan using a maintenance factor of 1.0 for all fixtures. 7. Revise the photometric plan so that spillover does not exceed .5 fc at the north, east and south property lines. 8. Revise the fixture schedule to specify "down light only" for the OL fixture. 9. Revise the photometric plan to reduce light levels under the canopy to 20 fc maximum. 10. Reduce light pole height to 20' maximum, including bases. 11. Add the standard lighting note to the plan. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 12. Coordinate the quantity of AXGK shown on the plan with the number listed in the schedule. 13. Revise the plan to show the proposed treatment for the area of N. Pantops Drive that is to be demolished. 14. Coordinate green screen locations and plants among all drawings. 15. Provide a detail for the wall- mounted green screens. 16. Clarify /coordinate the proposed planting with the gas line along the EC side of the property and the storm pipe northwest of the building. 17. Increase the size of the shrubs on the south and west sides of the building to 24" high at planting, minimum. 18. Provide evidence of grading and planting easements. 19. Increase the size of the Zelkovas at the interior of the parking lot to 2'/2" caliper minimum at planting. 20. Provide for review a sample of the block proposed for the retaining wall. 21. Add details to the plan to clearly show that the proposed planting can be accomplished with the proposed retaining wall block system. 22. Coordinate proposed grading and tree protection fencing to ensure the health of the three maple trees to remain in the right -of -way along the EC. Regarding condition #14, the ARB also clarified that the renderings show the accurate locations of the green screens. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff's review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: Flynn, Corven D & Katie H P O Box 5849 Charlottesville, VA. 22905 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Margaret Maliszewski DATE: PROJECT NAME: ARB- 2014 -21: Chick -fil -A Submittal Type Requiring Revisions ( ) indicates submittal Cade County Project Number # Copies Erosion & Sediment Control Plan (E &S) # Copies Distribute To: Mitigation Plan (MP) 2 M. Maliszewski Waiver Request WR Stormwater Management Plan (SWMP) Road Plan RP Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA Preliminary Site Plan (PSP) Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat PP Easement Plat (EP) Boundary Adjustment Plat BAP Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB- 2014 -21 2 Other: Please explain: (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 M. Maliszewski � OF AL ,. vIRGINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296.5832 Fax (434) 972 -4126 Project: Chick -Fil -A Final Site Plan SDP201400053 Plan preparer: Horton & Dodd, P.C. [gdodd @hdpc.net] Owner or rep.: FLYNN, CORVEN D & KATIE H Plan received date: 21 July 2014 Date of comments: 20 August 2014 Reviewer: Max Greene The Final Site Development Plans for Chick -Fil -A submitted 21 July 2014 have received Engineering Review. The plans do not appear to meet Albemarle County minimum checklist items for engineering approval. The following items will be adequately addressed prior to Engineering recommending approval of the site plan. 1. Water Protection plans will be approved prior to final site plan approval. See WP0201400072 for information on Water Protection Plan Approval. 2. VDOT approval is required prior to final site plan approval. 3. ASCA approval is required prior to final site plan approval. 4. The following items are from the initial site plan review that do not appear adequately addressed: a. The travel way grade from Route 250 East bound lane appears to be @ 12.5 % on the profile and up to 16.5% on the plan view. Please coordinate the plan and profile to match for adequate review. b. Could not locate the note for "Low Maintenance Ground Cover on Slopes 3:1 and Greater ". Please clarify location on plan for adequate review. c. Proposed 542 contour line does not appear connected to the existing 542 contour on the Northwest side of the site along the proposed stairs. d. Please remove unused details from plan. The angled parking detail is an example. 5. Please provide a Luxor road section at station 10 +75 or 11 +00 for clarification of proposed road construction. 6. Please state the proposed speed limit for Luxor Road Extension on the plans. Per the Clear Sight Distance Triangles and the proposed slope of the inbound lane from Route 250 it appears to be a 15 mile per hour road. 7. Stormwater Management Agreement is required to be recorded in the Clerk of the Court. Please use the following links for the SWM agreement and procedures: http:// www.albemarle.org /upload/images /forms center /departments /Community Development/forms/En i�g a nd WPO Forms/Plan Review - Stormwater Management BMP Facilities Maintenance Agreement Procedures.pdf http:// www.albemarle.org /upload/images /forms center /departments /Community Development/forms/En i�g a nd WPO Forms/Plan Review - Stormwater Management BMP Facilities Maintenance Agreement.pdf You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on Maintenance Agreements. Due to the requested changes for the review committee, additional comments or requested changes may be forthcoming for final approval of the Site development plan. File: CDDE1_sdp_MRG_Chick -Fil -A Final.doc