Project title: Henley Middle School Auxiliary Gym Addition
Project file number: WPO- 2014 -00104
Plan preparer:
Timmons Group
Owner or rep.:
Albemarle County Public Schools
Plan received date:
21 November 2014
(Rev. 1)
13 January 2014
(Rev. 2)
3 February 2015
Date of comments:
19 December 2014
(Rev. 1)
21 January 2014
(Rev. 2)
9 February 2015
Reviewer:
Justin Deel
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any
VSMP permit by issuing a project approval or denial. This project is approved. You may contact Ana
Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information
on bonding procedures and maintenance agreements.
A. Stormwater Pollution Prevention Plan ( SWPPP)
1. Please use the standard template from the County website.
(Rev. 1) Comment addressed.
2. Provide SWPPP documents as a stand -alone package. Do not include them as part of the site plan
package. Please adjust plan title(s) accordingly.
(Rev. 1) Comment addressed.
B. Pollution Prevention Plan (PPP)
1. Please provide a project specific PPP addressing all items in section 17 -404 of the County Code.
(Rev. 1) Comment addressed.
C. Stormwater Management Plan (SWMP)
1. Please provide a detailed plan drawing for the biofilter.
(Rev. 1) Comment partially addressed. The intent of this comment was not just to have a larger
scale replication the overall plan view of the biofilter, but to provide more detail of the biofilter.
Please provide a planting schedule and minimum floor dimensions; all the information the
contractor will need to construct the biofilter as planned.
(Rev. 2) Comment addressed.
2. Provide a scaled biofilter cross - section showing both existing and proposed grades.
(Rev. 1) Comment addressed.
3. Provide biofilter sizing calculations.
(Rev. 1) Comment addressed.
4. The area sizes shown in the water quality calculations table on Sheet C5.1 do not match sizes
provided in your calculation book, please correct.
(Rev. 1) Comment addressed.
Engineering Review Comments
Page 2 of 2
Note: An infiltration system placed beneath the proposed new play area location could eliminate the need
for the proposed biofilter and the inherent tripping /falling hazards associated with its proximity to the
school.
New Comment:
Please include all items pertinent to VSMP that have been omitted with the removal of Sheet C 1.0
(E &SC notes, stormwater management notes, cleanout detail, site data, play area drain section,
etc.).
(Rev. 2) Comment addressed.
D. Erosion and Sediment Control Plan (ESCP)
1. All apparent E &SC issues associated with this project appear to be adequately addressed.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforins.asp?department--cdengMTo
File: Approval Letter WP0201400104.doc
�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
VSMP Permit Plan Review
Project title: Henley Middle School Auxiliary Gym Addition
Project file number: WPO- 2014 -00104
Plan preparer:
Timmons Group
Owner or rep.:
Albemarle County Public Schools
Plan received date:
21 November 2014
(Rev. 1)
13 January 2014
Date of comments:
19 December 2014
(Rev. 1)
21 January 2014
Reviewer:
Justin Deel
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17 -401.
A. Stormwater Pollution Prevention Plan ( SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
Please use the standard template from the County website.
(Rev. 1) Comment addressed.
2. Provide SWPPP documents as a stand -alone package. Do not include them as part of the site plan
package. Please adjust plan title(s) accordingly.
(Rev. 1) Comment addressed.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
1. Please provide a project specific PPP addressing all items in section 17 -404 of the County Code.
(Rev. 1) Comment addressed.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17 -403.
Please provide a detailed plan drawing for the biofilter.
(Rev. 1) Comment partially addressed. The intent of this comment was not just to have a larger
scale replication the overall plan view of the biofilter, but to provide more detail of the biofilter.
Engineering Review Comments
Page 2 of 3
Please provide a planting schedule and minimum floor dimensions; all the information the
contractor will need to construct the biofilter as planned.
2. Provide a scaled biofilter cross - section showing both existing and proposed grades.
(Rev. 1) Comment addressed.
3. Provide biofilter sizing calculations.
(Rev. 1) Comment addressed.
4. The area sizes shown in the water quality calculations table on Sheet C5.1 do not match sizes
provided in your calculation book, please correct.
(Rev. 1) Comment addressed.
Note: An infiltration system placed beneath the proposed new play area location could eliminate the need
for the proposed biofilter and the inherent tripping /falling hazards associated with its proximity to the
school.
New Comment:
Please include all items pertinent to VSMP that have been omitted with the removal of Sheet C1.0
(E &SC notes, stormwater management notes, cleanout detail, site data, play area drain section,
etc.).
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reason is provided below. The erosion control plan content
requirements can be found in County Code section 17 -402.
1. All apparent E &SC issues associated with this project appear to be adequately addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
Engineering Review Comments
Page 3 of 3
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http: / /www.albemarle.or. /g_deptfonns .asp ?department= cdenaMTo
File: Henley Middle School Gym Add. WPO201400104 Rl.doc
�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewer:
VSMP Permit Plan Review
Henley Middle School Auxiliary Gym Addition
WPO- 2014 -00104
Timmons Group
Albemarle County Public Schools
21 November 2014
19 December 2014
Justin Deel
County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is denied. The
rationale is given in the comments below. The application may be resubmitted for approval if all
of the items below are satisfactorily addressed. The VSMP application content requirements can
be found in County Code section 17 -401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. Please use the standard template from the County website.
2. Provide SWPPP documents as a stand -alone package. Do not include them as part of the site plan
package. Please adjust plan title(s) accordingly.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17 -404.
1. Please provide a project specific PPP addressing all items in section 17 -404 of the County Code.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is disapproved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17 -403.
1. Please provide a detailed plan drawing for the biofilter.
2. Provide a scaled biofilter cross - section showing both existing and proposed grades.
3. Provide biofilter sizing calculations.
4. The area sizes shown in the water quality calculations table on Sheet C5.1 do not match sizes
provided in your calculation book, please correct.
Note: An infiltration system placed beneath the proposed new play area location could eliminate the need
for the proposed biofilter and the inherent tripping/falling hazards associated with its proximity to the
school.
Engineering Review Comments
Page 2 of 2
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reason is provided below. The erosion control plan content
requirements can be found in County Code section 17 -402.
1. All apparent E &SC issues associated with this project appear to be adequately addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments have
been satisfactorily addressed. For re- submittals please provide 2 copies of the complete permit package
with a completed application form.
Engineering plan review staff are available from 2 -4 PM on Thursdays, should you require a meeting to
discuss this review.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2 -4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre - construction conference.
Applicants will need to complete the request for a pre - construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre - construction
conference will be scheduled with the County inspector. At the pre - construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.org/deptforins.asp?department--cdengno
File: Henley Middle School Gym Add. WP0201400104.doc