Loading...
HomeMy WebLinkAboutSP201400015 Review Comments Special Use Permit 2014-12-05COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4176 December 5, 2014 Ms. Carolyn Schuyler 2521 Summit Ridge Trail Charlottesville VA 22911 RE: SP201400015 Heartrock Day Camp Dear Ms. Schuyler -- Thank you for the recent application for this special use permit. Please find review comments included in this letter. Please see the attached re- submittal schedule for a list of dates on which you can submit your revisions and responses to review comments (below and attached), as well as for possible Planning Commission dates. (Please note that the listed dates are the earliest possible, but actual dates need to be selected to suit the revision schedule for each project.) Review Comments Planning (Scott Clark) Please note that, as with any special use permit, this request will be evaluated based on its appropriateness under the County's land -use goals in the Comprehensive Plan and on its impacts (safety, traffic, noise, etc.) for the surrounding area. While we appreciate the educational and philanthropic intent behind the use, it must be held to the same standards that we apply to commercial and institutional land uses. Questions on details of proposed uses: o Will the site be staffed whenever it is open, or only for programs and classes? Will someone be on site, for example, when people visit to use the trails? Staffing would seem necessary in order to enforce parking limits, close access to the facility when full, and deal with arriving people who must be turned away. o Do you plan to have, or would be you be able /willing to commit to, any given level of first -aid training for staff on site? Given the distance from the site to emergency services, this might be a concern. o Please explain how you will avoid overlaps of separate uses (for example, playscape use and a visiting group, or morning playscape use and a still - present camping group, which might overload parking). o Thank you for looking into the fence - safety issue. Unfortunately, we do not have access to the ASTM standards documents. Please supply the section of the standards that you intend to follow. o Please explain how water and sanitary facilities would be supplied for the proposed camping use. Note that Health Department review of these facilities (as well as of the adequacy of water supply and sanitary facilities at the barn) will be necessary. o Will there be any outdoor PA system for announcements or music? Outdoor amplified sound During our discussions, use of the site for events has come up. Also, the conceptual plan shows "Overflow /Bus Parking" and "Event Overflow Parking." This appears to conflict with the description of the use as a day camp, and with the assumption that limited parking would limit the scale of the use. We would recommend that this issue be clarified, potentially by removing "Event Overflow Parking" from the conceptual plan. (Please also see the attached Engineering comments regarding parking.) In general, the application and the conceptual plans should reflect the limited scale and character of this use. Note that weddings, meetings, etc., would require a separate special use permit for "special events," and that the site could have significant problems accommodating larger events of that type. Note that, in order to address Engineering concern about stream crossings, it would be useful to specifically mark those paths on the conceptual plan as pedestrian paths with no vehicular access. The "stream access" shown on the conceptual plan raises the issue of potential expansion of the use onto the adjacent public park. Would use of this access be supervised by staff to prevent facility users from impacting the park across the stream? Zoning (Rebecca Ragsdale) Please see attached memo. Engineering (John Anderson) Please see attached memo. Note that "Site Plan Advance Comments" and "VSMP/WPO Advance Comments" in that memo refer to future applications that will be needed if the special use permit is approved. The first seven comments that apply to the special use permit application are the ones that need to be addressed in your resubmission. Fire/Rescue (Robbie Gilmer) All trails will need to be maintained so Rescue will be able to gain access with off road vehicles in case of emergency. Virginia Department of Transportation (Shelly Plaster) Please see attached memo. If we have not received a response from you within 30 days, we will contact you again. At that time, you will be given 10 days to do one of the following: a) request withdrawal of your application, b) request deferral of your application to a specific Planning Commission date as mutually agreed to with staff, or c) request indefinite deferral and state your justification for requesting the deferral. If none of these actions is taken, staff will schedule your application for a public hearing based on the information provided with your original submittal. Please be advised that, once a public hearing has been advertised, only one deferral prior to the Planning Commission's public hearing will be allowed during the life of the application. The only exception to this rule will be extraordinary circumstances, such as a major change in the project proposal by the applicant or more issues identified by staff that have not previously been brought to the applicant's attention. As always, an applicant may request deferral at the Planning Commission meeting. Please feel free to contact me if you wish to meet or need additional information. I would be happy to meet with you to discuss the issues raised by this application. Sincerely, Scott Clark Senior Planner, Planning Division