HomeMy WebLinkAboutWPO201400007 Bond Estimates 2015-02-25Project Name: Scottsville Water Treatment Plant - GAC
WPO file number: WP0201400007
Erosion and Sediment Control Bond Estimate
Item Item
Number
stall (PS, TS)
all fence (SF)
safety farce (SAF)
diversion (DD, FD, RW D)
temporary slope drain (TSD)
pipe length
earthwork for trap/basin
length
check dam
height of dam at toe
construction entrance (CE)
height of fill at face
wash rack
length of dam
paved construction entrance
lap width
rip -rap, placed
(area above transition)
0 ft
(total width of dam)
survey and layout (price par 0.1 mi.)
(height below transition)
mobilization
(area below transition)
stream crossing (computed independently)
(total fill volume)
(depth below lransilior
length of spillway
0 at
width of spillway
structures for basin
0.0 cy
(total fill volume)
ser height
0 ft
riser diameter
0 cy
barrel length
(spillway stone tons)
barrel diameter
all fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
cut at face
wash rack
0 ft
paved construction entrance
0 ft
rip -rap, placed
depth
0 ft
width
survey and layout (price par 0.1 mi.)
acres
mobilization
(total width of cut)
stream crossing (computed independently)
0 ft
pipe diameter
0 in
0 ft
cut at high side
0 ft
0 ft
cut at face
0 ft
0 ft
length of cut
0 ft
0 it
width of cut
0 ft
0 sf
(area below transHion)
0 sf
0 ft
(total width of cut)
0 ft
O ft
(depth below lransilior
0 ft
0 at
(area above transition)
0 sf
0.0 cy
(total fill volume)
0.0 cy
0 ft
(TOAL CV estimate)
0 cy
0 ft
(spillway stone tons)
0 tons
Oft
0 in
(ris unit price)
$0.00
0 ft
base plate or fdo
0
0 in
(barrel unit price)
50-00
barrel collars
0
baffle length
0 ft
0 it
width
0 ft
0 it
width
0 ft
3 it
channel width
10 ft
0 it
length
0 ft
0
(tons)
0 toi.s
0.6
traps and basins
0
No. Unit
Unit Cost
cost
(installed)
0.6 acres
$5,000.00
$3,000.00
580 ft
$5.00
$2,900.00
0 ft
$5.00
$0.00
0 ft
$13.00
$0.00
$0.00
$0.09
0
1
0
10
0
1
1
cost sum
prcj mgmt
contingency
Total
$13.00 $0.00
$50.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
$100.00 $0.00
$200.00 $200.00
$0.00 $0.00
$0.00
$675.00 $6,750.00
$2,000.00 $0.00
$2,000.00 $2,000.00
$3,500.00 $3,500.00
$60.00 $0.00
$300.00
$500.00
$0.00
$19,150.00
$2,872.50
$2,202.25
$24,230
2/25/2015
Project Name: Scottsville Water Treatment Plant - GAC
WPO file number: wpo201400007
Stormwater Management Plan Bond Estimate
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not inle
drop inlet or grate
manhole structure (per ft. nes)
pipe, rcp. cmp (15 to 48")
aggregate base or drainage stone
DC Sand Filler
eatheork for baplbasin
structures for basin
No. Unit Unit Cost Cost
(installed)
0 ft
$13.00
$0.00
0 ea
$500.00
$0.00
0 as
$3,500.00
$0.00
0 ft
$450.00
$0.00
0.0 in d 0 ES -1,2 0 EC -1 100.0 ft
$0.00
$0.00
0.0 in d 0.0 ft 0.0 ftw 0.0 ton
$35.00
$0.00
0 ft
(depth below transition
$0.00
1.0 as
$30,000.00
$30,000.00
height of dam at toe
height of fill at face
length of dam
top width
(area above vansition)
(total witlth of dam)
(height below transition
(area below transition)
(total FlII volume)
length of spillway
width of spillway
ser height
near diameter
barrel length
barrel diameter
tress
shrubs
seedlings
underdmin (LF)
bloflter soil mix (CV)
trash bi and vortex devices
maintenance access road (LF)
rip-mp, placed depth
width
rvey and layout (price per 0.1 mi.) acres
mobilization
as -built drawings(per facility)
materials testing (par facility)
compaction testing (per dam)
manufactured facilities (attach manufacturers m contractor's pace as a base
0 ft
cut at high side
0 ft
0 ft
culalface
0 ft
0 ft
length of cul
0 ft
0 ft
width of cul
0 ft
0 sf
(area below transition)
0 at
0 ft
(total witlth of cut)
0 ft
0 ft
(depth below transition
0 ft
0 sf
(area above transition)
0 sf
0.0 Cy
(total FlII volume)
0.0 by
0 ft
GOAL CV estimate)
0 by
0 ft
(spillway stone tons)
0 tons
Oft
$2,000.00
$0.00
0 in
(riser unit price)
$000
0 ft
base plate or ran
0
0 in
(barrel unit price)
$0.00
banal collars
0
baffle length
0 ft
0 ft length 0.0 ft
0.0 (tons) 0
1 Detention 1
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
0 as
$150.00
$0.00
0 ea
$50.00
$0.00
0 ea
$5.00
$0.00
0 ft
$5.00
$0.00
0 by
$38.00
$0.00
0 ft
$1,500.00
$0.00
0 ft
$50.00
$0.00
$60.00
$0.00
$1,000.00
$500.00
1 ea
$2,000.00
$2,000.00
0 ea
$2,000.00
$0.00
0 as
$5,000.00
$0.00
cost sum $33,500.00
prol mgmt $5,025.00
contingency $3,852.50
Total $42,380
2/25/2015
Internal Use Only j�
DattRuelved; j Fee Paid:
Ruilved by:
Intake; Forward to Management Analyst
APPROVED PLAN #
PROJECT NAME
REQUEST TO ESTABLISH A BOND
1A, 0 - 10M - 00007
Yc, /1t: G
(As listed on the approved plan)
All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a
separate sheet if more dwners are required. Owner and tax map information must be correct, and plans must be
approved prior to bond estimates being prepared.
TAX MAPs / PARCELs: 13 -Z-74 OWNER'S
SIGNATURE:
TAX MAPs / PARCELs: / 3, ` Z7 B OWNER'S
SIGNATURE: 't
TAX MAPs / PARCELs: OWNER'S
SIGNATURE:
TAX MAPs / PARCELs:
TAX MAPs / PARCELs:
OWNER'S NAME:
SIGNATURE:
OWNER'S NAME:
SIGNATURE:
0 It
date: z�13� ✓t'
lbCi�'hv jt (,04N / `7 ti.}GN GC /'�a,�ho•'; �y
date: 2' ✓1 3 157
date:
date:
date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the County must be submitted certifying that
the person sighing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207; $0 fee
VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208; $250 fee required
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435;
& Water & Sewer per Subdivision Ordinance section 14-435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: N ScrvILLUH�haY, it�VNu (��v�tj YIVtikhy ory
V/
OR REGULAR MAIL ADDRESS:
Revised 6/20/2014
410 j
Interna[ Use Onl /
(� 1
Date Received: � � ee Paid:
Received by:tv
jam_ j r
Intake: Forward to Nbfiagclent Analyst
IIRc.1Nt�` xe
REQUEST TO ESTABLISH A BOND
APPROVED PLAN # WP0201400007
PROJECT NAME: Scottsville GAC Updates
(As listed on the approved plan)
All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be
approved prior to bond estimates being prepared.
TAX MAPS / PARCELS:
136-27B OWNER'S NAME: Rivanna Water and Sewer Authority
SIGNATURE: s date:
TAX MAPS / PARCELS:
136-27A OWNER'S NAME: Rivanna Water and Sewer Authority
SIGNATURE: . �'1� date:
TAX MAPS / PARCELS:
OWNER'S NAME:
SIGNATURE: date:
TAX MAPS / PARCELS:
OWNER'S NAME:
SIGNATURE: date:
TAX MAPS / PARCELS:
OWNER'S NAME:
SIGNATURE: date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
❑ VESCP Erosion & Sediment Control per Water Protection Ordinance section 17-207; $0 fee
M VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water
Protection Ordinance section 17-208; $250 fee required
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435;
& Water & Sewer per Subdivision Ordinance section 14-435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL: dmarch@rivanna.org
OR REGULAR MAIL ADDRESS: 695 Moores Creek Lane
Charlottesville, VA 22902
Revised 6/20/2014