HomeMy WebLinkAboutWPO201400072 Review Comments Bond Estimate 2015-02-18Project Name: Chick -Fil -A Pantops
WPO file number: WP0201400072
Erosion and Sediment Control Bond Estimate
Item Item
Number
stablization (PS, TS)
all fence (SF)
safety fence(SAF)
diversion (DD, FD, RW D)
temporary slope drain (TSD)
1 earthwork for trap /basin
2 earthwork for trap /basin
sift fence inlet protection (IP)
stone inlet protection (IP)
Culvert inlet protection
pipe length
height of dam at toe
height of fill at face
length of dam
lap width
(area above transition)
(total width of dam)
(height below transit-)
(area below transition)
(total fill volume)
length of spillway
width of spillway
height of dam at ice
height of fill at face
length of dam
lap width
(area above transition)
(total width of dam)
(height below transttion)
(area below transition)
(total fill volume)
length of spillway
width of spillway
ser height
er diameter
barrel length
barrel diameter
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
cut at face
wash rack
40 it
paved construction entrance
30 ft
rip-rap, placed
depth
30 ft
width
urvey and layout (price par 0.1 mi.) acres
mobilization
stream crossing (computed independently)
0 ft
pipe diameter
0 in
2.5 ft
cut at high all
6 ft
1 ft
cut at face
1 ft
40 it
length of cut
30 ft
2.5 ft
width of cut
30 ft
45 sf
(area below transttion)
32 sf
5 ft
(total width of cut)
44 ft
1.5 ft
(depth below lransilior
5 ft
1.5 sf
(area above transition)
85 sf
8.9 cy
(total fill volume)
130.0 cy
8 ft
(TOAL CV estimate)
133 cy
10 ft
(spillway stone tons)
4.6 tons
9 ft
cut at high side
5 ft
0 ft
cut at face
5 ft
70 ft
length of cut
50 ft
2.5 ft
width of cut
20 ft
0 at
(area below transition)
150 sf
18 ft
(total width of cut)
40 ft
9 ft
(depth below lransilior
0 ft
0 sf
(area above transition)
0 sf
0.0 cy
(total fill volume)
277.8 cy
8 ft
(TOAL CV estimate)
278 cy
10 ft
(spillway stone tons)
4.6 tons
Oft
$55,310
0 in
(,[,,r unit price)
$0.00
0 ft
base plate or fdn
0
0 in
(barrel unit price)
$0.00
barrel collars
0
battle length
0 ft
40 it
width
10 ft
0 it
width
0 ft
2 it
channel width
10 ft
0 it
length
0.0 ft
0.0
(tons)
0 tons
1.8
traps and basins
2
No. Unit
Unit Cost
cost
(installed)
$230.00
1.8 acres
$5,000.00
$9,200.00
600.0 ft
$5.00
$3,000.00
0.0 ft
$5.00
$0.00
840 ft
$13.00
$10,920.00
$0.00
$0.00
$13.00 $1,729.00
$50.00 $230.00
2/18/2015
$13.00
$3,614.00
$50.00
$230.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
1
$100.00
$100.00
12
$200.00
$2,400.00
2
$400.00
$800.00
1
$1,800.00
$1,800.00
$0.00
4
$450.00
$1,800.00
0
$2,000.00
$0.00
1
$2,000.00
$2,000.00
1
$3,500.00
$3,500.00
$60.00
$0.00
$1,900.00
$500.00
$0.00
cost sum
$43,723.00
proj mgmt
$6,558.45
contingency
$5,028.15
Total
$55,310
2/18/2015