Loading...
HomeMy WebLinkAboutWPO201400072 Review Comments Bond Estimate 2015-02-18 (3)Project Name: Chick -fil -A Store #03187 WPO file number: wpo201400072 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not role drop inlet or grate manhole structure (per ft. nee) pipe, rap, crop (15 to 48 ") 48.0 in d pipe, mp.cmp(15to48 ") 18.0 in d aggregate base or drainage stone 0.0 in d earthwork for beptbasin 0.0 ftL 0.0 ftW height of dam at toe cut at high side height of 611 at face 0 ft length of dam 0 ft top width length of cut (area above transition) 0 ft (total width of dam) 0 ft (height below transition (area below transition) (area below transition) 0 ft (total Fill volume) 0 ft length of spillway (depth below transition width of spillway structures for basin (area above transition) 0 of riser height (total fill volume) riser diameter 0 ft barrel length 0 ay barrel diameter trees shrubs seedlings underdrain (LF) bloflter soil mix (CV) trash rack/ and vortex devices maintenance access road (LF) rip-rap, placed depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 1.8 basins mobiliretion as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractors price as a base) 0.0 ft 0 0 No. Unit Unit Cost Cost (installed) 0 ft 0 ES -1,2 0 EC -1 6 ea 3 ES -1,3 3 EC -2 9 as 0.0 ftL 0.0 ftW 0 ft cut at high side 0 ft 0 ft cut at face 0 ft 0 ft length of cut 0 ft 0 ft width of cut 0 ft 0 of (area below transition) 0 of 0 ft (total width of cut) 0 ft 0 ft (depth below transition 0 ft 0 of (area above transition) 0 of 0.0 cy (total fill volume) 00 cY 0 ft GOAL CV estimate) 0 ay 0 ft (spillway stone tons) 0 tons Oft 0 in (riser unit price) $0.00 0 ft base plate or ran 0 0 in (barrel unit price) $000 banal collars 0 baffle length 0 ft trees shrubs seedlings underdrain (LF) bloflter soil mix (CV) trash rack/ and vortex devices maintenance access road (LF) rip-rap, placed depth 0 ft length width 0.0 (tons) survey and layout (price per 0.1 mi.) acres 1.8 basins mobiliretion as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractors price as a base) 0.0 ft 0 0 No. Unit Unit Cost Cost (installed) 0 ft $13.00 $0.00 6 ea $500.00 $3,000.00 9 as $3,500.00 $31,500.00 103 ft $450.00 $46,350.00 434.0 ft $150.00 $65,100.00 307.0 ft $40.00 $15,280.00 0.0 ton $35.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 as $150.00 $0.00 0 as $50.00 $0.00 0 as $5.00 $0.00 0 ft $5.00 $0.00 0 cY $38.00 $0.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 $60.00 $0.00 $900.00 $500.00 1 as $2,000.00 $2,000.00 1 as $2,000.00 $2,000.00 1 as $5,000.00 $5,000.00 S, cost sum $171,630.00 pmt mgmt $25,744.50 contingency $19,737.45 Total ;217,120 2/18/2015