HomeMy WebLinkAboutWPO201400064 Review Comments Mitigation Plan 2015-03-13RI R
FRANKLIN
CASCADIA
2 M1O
Ary9
—CROFT
p�
Lai,
MITIGATION
a� AREA
?$
SITE
Mitigation should include reasonable measures to
ensure that residents will not disturb additional stream buffer.
va %
0
LJ
Legend
® Stream Buffer Impact Area
Stream Buffer Mitigation Plan Summary
WPO # 2012 -00099
Mitigation Measures:
1. Provide ditch and diversion dike behind lots 63 -93, directing water from
lots to the stormwater management pond.
2. Provide permanent 15' private drainage easement as shown.
MITIGATION MEASURES ARE AS AG PON AT MEETING WITH
ALBEMARLE COUNTY ENGIN G ON 11/24/14
What I recall agreeing to was that up to 50 could be disturbed, and a diversion and
ditch could be used at the 50' point. This was understood to be in place
already. This is not the mitigation. It only establishes the limit of what could
be disturbed. Mitigation needs to be provided, and disturbances beyond 50'
need to be pulled back.
0 -3 1 ,
I � _
1 -
81
SOT 57 _
k l�
i� ��
♦... I A S•'
.iN�1t•l4dr i
- � ♦N ♦ ♦.A .PINT
INt ♦ ♦1♦ PN4 ..
cRx!l
1V
E_
0
O
AdLa
�WO.-F
NlalnaF.Nxers '2�
uo NOLma
mom
O4;ai O
1 1 i
♦ .����TP
_
RONNIE
Lai,
WINw
®
« ����� ♦.:�:. -� _,gam
a+