Loading...
HomeMy WebLinkAboutWPO201500007 Review Comments WPO VSMP 2015-03-18�pF A vt�r�1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewers: VSMP Permit plan review Avemore Phase IV Townhomes — VSMP review WP0201500007 Dominion Engineering & Design, LLC Avemore Phase IV at Charlottesville, LLC 23 Feb 2015 18 Mar 2015 Michelle Roberge County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved with a condition to address the following: 1) 2) Once you obtain the coverage letter from DEQ, place a copy with SWPP onsite. Revise the registration statement to 1.3 acres for total land area and total area to be disturbed. I have delineated the area below. Please submit revise registration statement to the County. This will be entered into the DEQ website by County staff. From there, DEQ will contact applicant. �V 3) Update Site Inspection Log to current conditions. For example diversion dikes have been removed behind constructed townhomes. 4) Update Record of Land Disturbance. The site is stabilized. 5) Project is located in the impaired water. Please list Rivanna River. Engineering Review Comments Page 2 of 2 James River Basin Initial TMDL Cause Group Code Water Name Cause Estuary Reservoir River List Dev. Impaired Use Cause Category (Sq. Miles) (Acres) (Miles) Date Date H31R -04 -BEN X�trib to Rivanna River Aquatic Life Benthic - Macroinvertebrate Bioassessments 5A 0.98 2010 2022 20 - Pen Park Meadovrtreek L�Nrk � -- G51f Course ipe Park _- M ra rk Wi ra rk Golf � _ t7•.'.` F'. a•. z3d �� - hlamrial $:l s Charlottesville _ - r 0, s` 6) List all qualified inspector personnel. From the logs, Mike Myers and Allen Cross completed inspections. Please provide a sheet with the list of qualified inspector personnel. 7) There is no pollution prevention plan within the SWPP. Provide an 11 "x17" so that contractors can later mark porta johns, concrete washouts, fueling stations, solid waste disposals, etc. 8) The total fee paid is $2700. I have broken down fees and typical due dates. Since this application is for compliance of VSMP regulations, $1944 is total fee to the County. We will refund the $756. application fee (50% of VSMP fee) -state fee (pay directly to DEQ — We will refund) Remainder of fee (typically paid prior to pre - con) 100% of VSMP fee $1,350 $756 $594 $2,700 9) Please note the annual permit and inspections fees are up to date and have been paid. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county.