HomeMy WebLinkAboutSUB201400185 Review Comments Bond Estimate 2015-02-27Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB2O140O185
Item
Road Name: Trailside Drive
station 10 +00 to 18 +05
aggregate base
blotted or prime &double seal
asphalt base
asphalt surface
curb CG -2
curb CG -6
sidewalk, concrete (6)
ramp CG -12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length
805.0 ft
8.0 in d
805.0 ft L
25.0 ft W
939.2 ton
$25.00
$23,479.17
0%
$23,479.17
805.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
3.5 in d
805.0 ft L
25.0 ft W
431.4 tons
$84.58
$36,490.32
0%
$36,490.32
1.5 in d
805.0 ft L
25.0 ft W
184.9 tons
$91.34
$16,888.62
0%
$16,888.62
0.0 ft
$13.00
$0.00
0%
$0.00
1600.0 ft
$15.00
$24,000.00
0%
$24,000.00
1380.0 ft
$17.00
$23,460.00
0%
$23,460.00
10 ft
$350.00
$3,500.00
0%
$3,500.00
1 each
$200.00
$200.00
0%
$200.00
10 each
$200.00
$2,000.00
0%
$2,000.00
0 Each
23 each
$150.00
$3,450.00
0%
$3,450.00
0 ES @
3000
0.0 ft
$17.00
$0.00
0%
$0.00
8 each
$3,500.00
$28,000.00
0%
$28,000.00
1 each
$500.00
$500.00
0%
$500.00
107 ft
$450.00
$48,150.00
0%
$48,150.00
15.0 in d
1 ES -1,2
1 EC-1
384.0 ft
$35.00
$14,440.00
0%
$14,440.00
18.0 in d
0 ES -1,2
0 EC-1
524.0 ft
$40.00
$20,960.00
0%
$20,960.00
24.0 in d
0 ES -1,2
0 EC-1
143.0 ft
$50.00
$7,150.00
0%
$7,150.00
18.0 in d
0 ES -1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0.0 ft d
0.0 ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
805.0 ft L
0.15246 mi.
2 Isum
$2,000.00
$5,000.00
0%
$5,000.00
805.0 ft L
0.15246 mi.
2 Isum
$2,000.00
$5,000.00
0%
$5,000.00
0Isum
$500.00
$0.00
0%
$0.00
805.0 ft L
1.61 inc of 500'
3 each
$200.00
$540.00
0%
$540.00
805.0 ft L
1.61 inc of 500'
3 each
$200.00
$540.00
0%
$540.00
805.0 ft L
1.61 inc of 500'
3 each
$200.00
$540.00
0%
$540.00
805.0 ft L
1.61 inc of 500'
3 each
$200.00
$540.00
0%
$540.00
805.0 ft L
1.61 inc of 500'
3 each
$200.00
$540.00
0%
$540.00
0 ft
$2.00
$0.00
0%
$0.00
805.0 ft L
0.15246 mi.
2 Lanes
$2,000.00
$6,098.48
0%
$6,098.48
805.0 ft L
0.15246 mi.
2 Lanes
$150.00
$457.39
0%
$457.39
805.0 ft L
0.15246 mi.
2 Lanes
$100.00
$554.92
0%
$554.92
$272,478.91
$272,478.91
cost sum
proj mgmt
$13,623.95
$13,623.95
contingency
$13,623.95
$13,623.95
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: Trailside Drive
No. Unit Unit Cost Cost
installed % compete cost remaining
Total $299,730 $299,730
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: Trailside Court
station 10 +00 to 13 +28
aggregate base
blotted or prime &double seal
asphalt base
asphalt surface
curb CG -2
curb CG -6
sidewalk, concrete (6)
ramp CG -12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length
328.0 ft
6.0 in d
328.0 ft L
22.0 ft W
252.6 ton
$25.00
$6,314.00
0%
$6,314.00
328.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
2.5 in d
328.0 ft L
22.0 ft W
110.5 tons
$84.58
$9,345.67
0%
$9,345.67
1.5 in d
328.0 ft L
22.0 ft W
66.3 tons
$91.34
$6,055.57
0%
$6,055.57
0.0 ft
$13.00
$0.00
0%
$0.00
656.0 ft
$15.00
$9,840.00
0%
$9,840.00
675.0 ft
$17.00
$11,475.00
0%
$11,475.00
8 ft
$350.00
$2,800.00
0%
$2,800.00
1 each
$200.00
$200.00
0%
$200.00
5 each
$200.00
$1,000.00
0%
$1,000.00
0 Each
14 each
$150.00
$2,100.00
0%
$2,100.00
0 ES @
3000
0.0 ft
$17.00
$0.00
0%
$0.00
2 each
$3,500.00
$7,000.00
0%
$7,000.00
1 each
$500.00
$500.00
0%
$500.00
8 ft
$450.00
$3,600.00
0%
$3,600.00
15.0 in d
0 ES -1,2
0 EC-1
49.0 ft
$35.00
$1,715.00
0%
$1,715.00
18.0 in d
0 ES -1,2
0 EC-1
161.0 ft
$40.00
$6,440.00
0%
$6,440.00
24.0 in d
0 ES -1,2
0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0.0 ft d
0.0 ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
328.0 ft L
0.06212 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
328.0 ft L
0.06212 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
0Isum
$500.00
$0.00
0%
$0.00
328.0 ft L
0.656 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
328.0 ft L
0.656 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
328.0 ft L
0.656 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
328.0 ft L
0.656 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
328.0 ft L
0.656 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
0 ft
$2.00
$0.00
0%
$0.00
328.0 ft L
0.06212 mi.
2 Lanes
$2,000.00
$2,484.85
0%
$2,484.85
328.0 ft L
0.06212 mi.
2 Lanes
$150.00
$186.36
0%
$186.36
328.0 ft L
0.06212 mi.
2 Lanes
$100.00
$374.24
0%
$374.24
$79,130.69
$79,130.69
cost sum
proj mgmt
$3,956.53
$3,956.53
contingency
$3,956.53
$3,956.53
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: Trailside Court
No. Unit Unit Cost Cost
installed % compete cost remaining
Total $87,050 $87,050
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: Riverwalk X -ing
station 10 +00 to 13 +75
aggregate base
blotted or prime &double seal
Sand Base Concrete Paver
Sand Base Permeable Paver
Concrete Pavers
Permeable Pavers
sidewalk, concrete (6)
Bollards
street name sign
traffic control sign
Street Landscape
guardrail
Nyloplast drop inlet or grate
Trench Drain
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length 375.0 ft
4.0 in d
375.0 ft L 20.0 ft W
175.0 ton
$25.00
$4,375.00
0%
$4,375.00
375.0 ft L 0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
1.5 in d
375.0 ft L 12.0 ft W
41.3 tons
$20.00
$826.88
0%
$826.88
0.8 in d
375.0 ft L 8.0 ft W
13.8 tons
$20.00
$275.63
0%
$275.63
375 ft L 12 ft W
4500.0 sq.ft
$18.00
$81,000.00
0%
$81,000.00
375 ft L 8 ft W
3000.0 sq.ft
$12.00
$36,000.00
0%
$36,000.00
0.0 ft
$17.00
$0.00
0%
$0.00
8 ft
$350.00
$2,800.00
0%
$2,800.00
1 each
$500.00
$500.00
0%
$500.00
0 each
$200.00
$0.00
0%
$0.00
0 Each
16 each
$150.00
$2,400.00
0%
$2,400.00
0 ES @ 3000
0.0 ft
$17.00
$0.00
0%
$0.00
6 each
$2,500.00
$15,000.00
0%
$15,000.00
1
$1,000.00
$1,000.00
0%
$1,000.00
0 each
$500.00
$0.00
0%
$0.00
0 ft
$450.00
$0.00
0%
$0.00
15.0 in d
0 ES -1,2 0 EC -1
315.0 ft
$35.00
$11,025.00
0%
$11,025.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
24.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0.0 ft d
0.0 ft L 0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
375.0 ft L 0.07102 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
375.0 ft L 0.07102 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
0Isum
$500.00
$0.00
0%
$0.00
375.0 ft L 0.75 inc of 500'
2 each
$200.00
$360.00
0%
$360.00
375.0 ft L 0.75 inc of 500'
2 each
$200.00
$360.00
0%
$360.00
375.0 ft L 0.75 inc of 500'
2 each
$200.00
$360.00
0%
$360.00
375.0 ft L 0.75 inc of 500'
2 each
$200.00
$360.00
0%
$360.00
375.0 ft L 0.75 inc of 500'
2 each
$200.00
$360.00
0%
$360.00
0 ft
$2.00
$0.00
0%
$0.00
375.0 ft L 0.07102 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
375.0 ft L 0.07102 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
375.0 ft L 0.07102 mi.
0 Lanes
$100.00
$250.00
0%
$250.00
$163,252.50
$163,252.50
cost sum
proj mgmt
$8,162.63
$8,162.63
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: Riverwalk X -ing
No. Unit Unit Cost Cost
installed % compete cost remaining
contingency $8,162.63 $8,162.63
Total $179,580 $179,580
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB2O140O185
Item
Road Name: North Alley
station 10 +00 to 14 +55
aggregate base
blotted or prime &double seal
asphalt base
asphalt surface
curb CG -2
curb CG -6
sidewalk, concrete (6)
ramp CG -12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length 455.0 ft
6.0 in d
455.0 ft L 12.0 ft W
191.1 ton
$25.00
$4,777.50
0%
$4,777.50
455.0 ft L 0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
0.0 in d
455.0 ft L 0.0 ft W
0.0 tons
$84.58
$0.00
0%
$0.00
2.0 in d
455.0 ft L 12.0 ft W
66.9 tons
$91.34
$6,109.28
0%
$6,109.28
0.0 ft
$13.00
$0.00
0%
$0.00
0.0 ft
$15.00
$0.00
0%
$0.00
0.0 ft
$17.00
$0.00
0%
$0.00
0 ft
$350.00
$0.00
0%
$0.00
0 each
$200.00
$0.00
0%
$0.00
1 each
$200.00
$200.00
0%
$200.00
0 Each
0 each
$150.00
$0.00
0%
$0.00
0 ES @ 3000
0.0 ft
$17.00
$0.00
0%
$0.00
0 each
$3,500.00
$0.00
0%
$0.00
0 each
$500.00
$0.00
0%
$0.00
0 ft
$450.00
$0.00
0%
$0.00
15.0 in d
0 ES -1,2 0 EC -1
0.0 ft
$35.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
24.0 in d
0 ES -1,2 0 EC -1
0.0 ft
$50.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0.0 ft d
0.0 ft L 0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
455.0 ft L 0.08617 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
455.0 ft L 0.08617 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
0Isum
$500.00
$0.00
0%
$0.00
455.0 ft L 0.91 inc of 500'
2 each
$200.00
$400.00
0%
$400.00
455.0 ft L 0.91 inc of 500'
2 each
$200.00
$400.00
0%
$400.00
455.0 ft L 0.91 inc of 500'
2 each
$200.00
$400.00
0%
$400.00
455.0 ft L 0.91 inc of 500'
2 each
$200.00
$400.00
0%
$400.00
455.0 ft L 0.91 inc of 500'
2 each
$200.00
$400.00
0%
$400.00
0 ft
$2.00
$0.00
0%
$0.00
455.0 ft L 0.08617 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
455.0 ft L 0.08617 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
455.0 ft L 0.08617 mi.
0 Lanes
$100.00
$250.00
0%
$250.00
$19,336.78
$19,336.78
cost sum
proj mgmt
$966.84
$966.84
contingency
$966.84
$966.84
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: North Alley
No. Unit Unit Cost Cost
installed % compete cost remaining
Total $21,280 $21,280
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB2O140O185
Item
Road Name: South Alley
station 10 +00 to 12 +75
aggregate base
blotted or prime &double seal
asphalt base
asphalt surface
curb CG -2
curb CG -6
sidewalk, concrete (6)
ramp CG -12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length 275.0 ft
6.0 in d
275.0 ft L 20.0 ft W
192.5 ton
$25.00
$4,812.50
0%
$4,812.50
275.0 ft L 0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
0.0 in d
275.0 ft L 0.0 ft W
0.0 tons
$84.58
$0.00
0%
$0.00
2.0 in d
275.0 ft L 20.0 ft W
67.4 tons
$91.34
$6,154.03
0%
$6,154.03
0.0 ft
$13.00
$0.00
0%
$0.00
0.0 ft
$15.00
$0.00
0%
$0.00
0.0 ft
$17.00
$0.00
0%
$0.00
0 ft
$350.00
$0.00
0%
$0.00
0 each
$200.00
$0.00
0%
$0.00
2 each
$200.00
$400.00
0%
$400.00
0 Each
0 each
$150.00
$0.00
0%
$0.00
0 ES @ 3000
0.0 ft
$17.00
$0.00
0%
$0.00
0 each
$3,500.00
$0.00
0%
$0.00
0 each
$500.00
$0.00
0%
$0.00
0 ft
$450.00
$0.00
0%
$0.00
15.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$35.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
24.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$50.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0.0 ft d
0.0 ft L 0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
275.0 ft L 0.05208 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
275.0 ft L 0.05208 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
0Isum
$500.00
$0.00
0%
$0.00
275.0 ft L 0.55 inc of 500'
2 each
$200.00
$320.00
0%
$320.00
275.0 ft L 0.55 inc of 500'
2 each
$200.00
$320.00
0%
$320.00
275.0 ft L 0.55 inc of 500'
2 each
$200.00
$320.00
0%
$320.00
275.0 ft L 0.55 inc of 500'
2 each
$200.00
$320.00
0%
$320.00
275.0 ft L 0.55 inc of 500'
2 each
$200.00
$320.00
0%
$320.00
0 ft
$2.00
$0.00
0%
$0.00
275.0 ft L 0.05208 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
275.0 ft L 0.05208 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
275.0 ft L 0.05208 mi.
0 Lanes
$100.00
$250.00
0%
$250.00
$19,216.53
$19,216.53
cost sum
proj mgmt
$960.83
$960.83
contingency
$960.83
$960.83
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: South Alley
No. Unit Unit Cost Cost
installed % compete cost remaining
Total $21,140 $21,140
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: East Alley
station 10 +00 to 13 +35
aggregate base
blotted or prime &double seal
asphalt base
asphalt surface
curb CG -2
curb CG -6
sidewalk, concrete (6)
ramp CG -12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
pipe, rcp, cm (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length 335.0 ft
6.0 in d
335.0 ft L 24.0 ft W
281.4 ton
$25.00
$7,035.00
0%
$7,035.00
335.0 ft L 0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
0.0 in d
335.0 ft L 0.0 ft W
0.0 tons
$84.58
$0.00
0%
$0.00
2.0 in d
335.0 ft L 24.0 ft W
98.5 tons
$91.34
$8,996.08
0%
$8,996.08
0.0 ft
$13.00
$0.00
0%
$0.00
0.0 ft
$15.00
$0.00
0%
$0.00
0.0 ft
$17.00
$0.00
0%
$0.00
0 ft
$350.00
$0.00
0%
$0.00
0 each
$200.00
$0.00
0%
$0.00
0 each
$200.00
$0.00
0%
$0.00
0 Each
0 each
$150.00
$0.00
0%
$0.00
0 ES @ 3000
0.0 ft
$17.00
$0.00
0%
$0.00
0 each
$3,500.00
$0.00
0%
$0.00
0 each
$500.00
$0.00
0%
$0.00
0 ft
$450.00
$0.00
0%
$0.00
15.0 in d
0 ES -1,2 0 EC -1
0.0 ft
$35.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
24.0 in d
0 ES -1,2 0 EC -1
0.0 ft
$50.00
$0.00
0%
$0.00
18.0 in d
0 ES -1,2 0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
0.0 ft d
0.0 ft L 0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0 ft L 0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
335.0 ft L 0.06345 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
335.0 ft L 0.06345 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
0Isum
$500.00
$0.00
0%
$0.00
335.0 ft L 0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
335.0 ft L 0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
335.0 ft L 0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
335.0 ft L 0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
335.0 ft L 0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
0 ft
$2.00
$0.00
0%
$0.00
335.0 ft L 0.06345 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
335.0 ft L 0.06345 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
335.0 ft L 0.06345 mi.
0 Lanes
$100.00
$250.00
0%
$250.00
$23,981.08
$23,981.08
cost sum
proj mgmt
$1,199.05
$1,199.05
contingency
$1,199.05
$1,199.05
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: East Alley
No. Unit Unit Cost Cost
installed % compete cost remaining
Total $26,380 $26,380
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
Road Name: South Parking @ Affordable Housing
station 10 +00 to 12 +00
road length
335.0 ft
aggregate base
6.0 in d
335.0 ft L
20.0 ft W
234.5 ton
$25.00
$5,862.50
0%
$5,862.50
blotted or prime &double seal
335.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
0.0 in d
335.0 ft L
0.0 ft W
0.0 tons
$84.58
$0.00
0%
$0.00
asphalt surface
2.0 in d
335.0 ft L
20.0 ft W
82.1 tons
$91.34
$7,496.73
0%
$7,496.73
curb CG -2
0.0 ft
$13.00
$0.00
0%
$0.00
curb CG -6
0.0 ft
$15.00
$0.00
0%
$0.00
sidewalk, concrete (6)
0.0 ft
$17.00
$0.00
0%
$0.00
ramp CG -12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
0 each
$200.00
$0.00
0%
$0.00
traffic control sign
0 each
$200.00
$0.00
0%
$0.00
Street Landscape
0 Each
0 each
$150.00
$0.00
0%
$0.00
guardrail
0 ES @
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
0 each
$3,500.00
$0.00
0%
$0.00
standard manhole frame top (not inlet)
0 each
$500.00
$0.00
0%
$0.00
manhole structure (per ft. rise)
0 ft
$450.00
$0.00
0%
$0.00
pipe, rcp, cm (15 to 48 ")
15.0 in d
0 ES -1,2
0 EC -1
0.0 ft
$35.00
$0.00
0%
$0.00
pipe, rcp, cm (15 to 48 ")
18.0 in d
0 ES -1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
pipe, rcp, cm (15 to 48 ")
24.0 in d
0 ES -1,2
0 EC -1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cm (15 to 48 ")
18.0 in d
0 ES -1,2
0 EC-1
0.0 ft
$40.00
$0.00
0%
$0.00
rip -rap, placed
0.0 ft d
0.0 ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC -2 or 3
0.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0.0 ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
0.0 cy
$4.00
$0.00
0%
$0.00
fill grading
0.0 cy
$9.00
$0.00
0%
$0.00
as -built drawings (1k + price per 0.1 mi.)
335.0 ft L
0.06345 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
survey and layout (price per 0.1 mi.)
335.0 ft L
0.06345 mi.
1 Isum
$2,000.00
$3,000.00
0%
$3,000.00
mobilization
0Isum
$500.00
$0.00
0%
$0.00
materials testing
335.0 ft L
0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
compaction testing
335.0 ft L
0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
CBR tests (1 every 0.1 mi. per road)
335.0 ft L
0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
stone depth inspections
335.0 ft L
0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
pavement inspections
335.0 ft L
0.67 inc of 500'
2 each
$200.00
$340.00
0%
$340.00
pipe and drainage video inspections
0 ft
$2.00
$0.00
0%
$0.00
VDOT surety (1 lane)
335.0 ft L
0.06345 mi.
0 Lanes
$2,000.00
$0.00
0%
$0.00
VDOT maintenance fee (1 In rd, 1 yr)
335.0 ft L
0.06345 mi.
0 Lanes
$150.00
$0.00
0%
$0.00
VDOT admin. Cost recovery fee(1 lane)
335.0 ft L
0.06345 mi.
0 Lanes
$100.00
$250.00
0%
$250.00
cost sum
$21,309.23
$21,309.23
proj mgmt
$1,065.46
$1,065.46
contingency
$1,065.46
$1,065.46
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village\ RP_bond_est_27February2015.xlsx 3/3/2015
Subdivision Name: Riverside Village
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400185
Item
Road Name: South Parking @ Affordable Housing
No. Unit Unit Cost Cost
installed % compete cost remaining
Total $23,450 $23,450
C: \Users \mgreene \Contacts \Review Comment letters \Riverside Village \RP_bond_est_27February2015.xlsx 3/3/2015