HomeMy WebLinkAboutSUB201400197 Review Comments Bond Estimate 2015-03-24Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 2 & 4)
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400197
Item
Road Name: Hyland Creek Drive
station 10 +00 to 23 +04
aggregate base
blotted or prime &double seal
asphalt base
asphalt surface
curb CG -2
curb CG -6
sidewalk, concrete (6)
ramp CG -12
street name sign
traffic control sign
Street Landscape
guardrail
drop inlet or grate
standard manhole frame top (not inlet)
manhole structure (per ft. rise)
pipe, rcp, cmp (15 to 48 ")
pipe, rcp, cmp (15 to 48 ")
pipe, rcp, cmp (15 to 48 ")
pipe, rcp, cmp (15 to 48 ")
pipe, rcp, cmp (15 to 48 ")
rip -rap, placed
matting, EC -2 or 3
clear and grub (for wooded sites)
cut grading
fill grading
as -built drawings (1k + price per 0.1 mi.)
survey and layout (price per 0.1 mi.)
mobilization
materials testing
compaction testing
CBR tests (1 every 0.1 mi. per road)
stone depth inspections
pavement inspections
pipe and drainage video inspections
VDOT surety (1 lane)
VDOT maintenance fee (1 In rd, 1 yr)
VDOT admin. Cost recovery fee(1 lane)
C:\ Users \mgreene \Documents \A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_ bond _est_23March2015.xlsx 3/24/2015
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
road length
1304.0
ft
6.0 in
d 1304.0
ft L
28.0
ft W
1277.9 ton
$25.00
$31,948.00
0%
$31,948.00
1304.0
ft L
0.0
ft W
0.0 sy
$10.00
$0.00
0%
$0.00
3.0 in
d 1304.0
ft L
28.0
ft W
670.9 tons
$84.58
$56,745.40
0%
$56,745.40
1.5 in
d 1304.0
ft L
28.0
ft W
335.5 tons
$91.34
$30,640.37
0%
$30,640.37
0.0 ft
$13.00
$0.00
0%
$0.00
2608.0 ft
$15.00
$39,120.00
0%
$39,120.00
2608.0 ft
$17.00
$44,336.00
0%
$44,336.00
0 ft
$350.00
$0.00
0%
$0.00
1 each
$200.00
$200.00
0%
$200.00
2 each
$200.00
$400.00
0%
$400.00
0 Each
0 each
$150.00
$0.00
0%
$0.00
0 ES @
3000
0.0 ft
$17.00
$0.00
0%
$0.00
24 each
$3,500.00
$84,000.00
0%
$84,000.00
2 each
$500.00
$1,000.00
0%
$1,000.00
193 ft
$450.00
$86,850.00
0%
$86,850.00
15.0 in
d
0 ES -1,2
0
EC -1
977.0 ft
$35.00
$34,195.00
0%
$34,195.00
18.0 in
d
0 ES -1,2
0
EC -1
130.0 ft
$40.00
$5,200.00
0%
$5,200.00
24.0 in
d
0 ES -1,2
0
EC-1
650.0 ft
$50.00
$32,500.00
0%
$32,500.00
30.0 in
d
0 ES -1,2
0
EC-1
132.0 ft
$65.00
$8,580.00
0%
$8,580.00
36.0 in
d
1 ES -1,2
1
EC-1
75.0 ft
$70.00
$6,250.00
0%
$6,250.00
0.0 ft
d 0.0
ft L
0.0
ft W
0.0 ton
$60.00
$0.00
0%
$0.00
0.0
ft L
0.0
ft W
0.0 sy
$2.00
$0.00
0%
$0.00
0.0
ft L
0.0
ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
0.0 cy
$4.00
$0.00
0%
$0.00
0.0 cy
$9.00
$0.00
0%
$0.00
1304.0
ft L
0.24697
mi.
3 Isum
$2,000.00
$7,000.00
0%
$7,000.00
1304.0
ft L
0.24697
mi.
3 Isum
$2,000.00
$7,000.00
0%
$7,000.00
1 Isum
$500.00
$500.00
0%
$500.00
1304.0
ft L
2.608
inc of 500'
4 each
$200.00
$740.00
0%
$740.00
1304.0
ft L
2.608
inc of 500'
4 each
$200.00
$740.00
0%
$740.00
1304.0
ft L
2.608
inc of 500'
4 each
$200.00
$740.00
0%
$740.00
1304.0
ft L
2.608
inc of 500'
4 each
$200.00
$740.00
0%
$740.00
1304.0
ft L
2.608
inc of 500'
4 each
$200.00
$740.00
0%
$740.00
0 ft
$2.00
$0.00
0%
$0.00
1304.0
ft L
0.24697
mi.
2 Lanes
$2,000.00
$9,878.79
0%
$9,878.79
1304.0
ft L
0.24697
mi.
2 Lanes
$150.00
$740.91
0%
$740.91
1304.0
ft L
0.24697
mi.
2 Lanes
$100.00
$743.94
0%
$743.94
$491,528.40
$491,528.40
cost sum
proj mgmt
$24,576.42
$24,576.42
C:\ Users \mgreene \Documents \A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_ bond _est_23March2015.xlsx 3/24/2015
Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 2 & 4)
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400197
Item No. Unit Unit Cost Cost
installed % compete cost remaining
Road Name: Hyland Creek Drive
contingency $24,576.42 $24,576.42
Total $540,690 $540,690
C:\ Users \mgreene \Documents\A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_bond_est_23March2015.xlsx 3/24/2015
Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 2 & 4)
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400197
Item
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
Road Name: Hyland Ridge Drive
station 10 +00 to 38 +35
road length 2835.0 ft
aggregate base
6.0 in d
2835.0 ft L
28.0 ft W
2778.3 ton
$25.00
$69,457.50
0%
$69,457.50
blotted or prime &double seal
2835.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
3.0 in d
2835.0 ft L
28.0 ft W
1458.6 tons
$84.58
$123,369.02
0%
$123,369.02
asphalt surface
1.5 in d
2835.0 ft L
28.0 ft W
729.3 tons
$91.34
$66,614.60
0%
$66,614.60
curb CG -2
0.0 ft
$13.00
$0.00
0%
$0.00
curb CG -6
5670.0 ft
$15.00
$85,050.00
0%
$85,050.00
sidewalk, concrete (6)
5670.0 ft
$17.00
$96,390.00
0%
$96,390.00
ramp CG -12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
1 each
$200.00
$200.00
0%
$200.00
traffic control sign
3 each
$200.00
$600.00
0%
$600.00
Street Landscape
0 Each
0 each
$150.00
$0.00
0%
$0.00
guardrail
0 ES C
3000
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
31 each
$3,500.00
$108,500.00
0%
$108,500.00
standard manhole frame top (not inlet)
5 each
$500.00
$2,500.00
0%
$2,500.00
manhole structure (per ft. rise)
570 ft
$450.00
$256,500.00
0%
$256,500.00
pipe, rcp, cmp (15 to 48 ")
15.0 in d
0 ES -1,2
0 EC -1
871.0 ft
$35.00
$30,485.00
0%
$30,485.00
pipe, rcp, cmp (15 to 48 ")
18.0 in d
0 ES -1,2
0 EC -1
231.0 ft
$40.00
$9,240.00
0%
$9,240.00
pipe, rcp, cmp (15 to 48 ")
24.0 in d
0 ES -1,2
0 EC -1
129.0 ft
$50.00
$6,450.00
0%
$6,450.00
pipe, rcp, cmp (15 to 48 ")
36.0 in d
1 ES -1,2
1 EC -1
1486.0 ft
$70.00
$105,020.00
0%
$105,020.00
rip -rap, placed
0.0 ft d
0.0 ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC -2 or 3
0.0 ft L
0.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0.0 ft L
0.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
0.0 cy
$4.00
$0.00
0%
$0.00
fill grading
0.0 cy
$9.00
$0.00
0%
$0.00
as -built drawings (1k + price per 0.1 mi.)
2835.0 ft L
0.53693 mi.
6 Isum
$2,000.00
$13,000.00
0%
$13,000.00
survey and layout (price per 0.1 mi.)
2835.0 ft L
0.53693 mi.
6 Isum
$2,000.00
$13,000.00
0%
$13,000.00
mobilization
0Isum
$500.00
$0.00
0%
$0.00
materials testing
2835.0 ft L
5.67 inc of 500'
7 each
$200.00
$1,340.00
0%
$1,340.00
compaction testing
2835.0 ft L
5.67 inc of 500'
7 each
$200.00
$1,340.00
0%
$1,340.00
CBR tests (1 every 0.1 mi. per road)
2835.0 ft L
5.67 inc of 500'
7 each
$200.00
$1,340.00
0%
$1,340.00
stone depth inspections
2835.0 ft L
5.67 inc of 500'
7 each
$200.00
$1,340.00
0%
$1,340.00
pavement inspections
2835.0 ft L
5.67 inc of 500'
7 each
$200.00
$1,340.00
0%
$1,340.00
pipe and drainage video inspections
0 ft
$2.00
$0.00
0%
$0.00
VDOT surety (1lane)
2835.0 ft L
0.53693 mi.
2 Lanes
$2,000.00
$21,477.27
0%
$21,477.27
VDOT maintenance fee (1 In rd, 1 yr)
2835.0 ft L
0.53693 mi.
2 Lanes
$150.00
$1,610.80
0%
$1,610.80
VDOT admin. Cost recovery fee(1 lane)
2835.0 ft L
0.53693 mi.
2 Lanes
$100.00
$1,323.86
0%
$1,323.86
cost sum
$1,017,488.06
$1,017,488.06
proj mgmt
$50,874.40
$50,874.40
contingency
$50,874.40
$50,874.40
Total
$1,119,240
$1,119,240
C:\ Users \mgreene \DocumentsVW_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_ bond _est_23March2015.xlsx 3/24/2015
Subdivision Name: Road Plan Amendment for Hyland Ridge Subdivision (Phase 2 & 4)
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201400197
Item
Road Name: Hyland Ridge Drive
No. Unit Unit Cost Cost
(installed) % compete cost remaining
C:\ Users \mgreene \Documents \A_Review Comment letters \Hyland Ridge Phase 2 & 4 - Road Plan \RP_bond_est_23March2015.xlsx 3/24/2015