Loading...
HomeMy WebLinkAboutWPO201500017 Review Comments WPO VSMP 2015-03-27� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Existing SWPPP plan will be updated with this information. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. Existing PPP plan will be updated with this information. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1. No changes to the existing SWM plan is proposed with this modification D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. The modification can be approved with the addition of the Storm Drain Inlet Protection, Std. & Spec. 3.07 to the inlet of the new M -1 manhole structure. The inlet protection will be installed with each lifting of the manhole structure top section. A stone filter ring may be required by the VSMP inspector if excessive sediment is documented leaving the outlet pipe. A detail of the inlet protection has been added to the approved plans sets. County forms can be found on the county website forms center under engineering; h!Ltp://www.albemarle.ora/deptfonns.asp?department=cdengzMo File: CDDEI_vsmp_review_5th Street Station modification of basin #3_wpo201500017.doc VSMP Permit plan review Project title: 5t' Street Station Modification of basin #3 outlet system Project file number: WP0201500017 Plan preparer: Bohler Engineering [dhines @bohlereng.com] Owner or rep.: AVON HOLDINGS LLC [steve @sjcollinsent.com] Plan received date: 25 March 2015 Date of comments: 27 March 2015 Reviewers: Max Greene County Code section 17 -410 and Virginia Code §62.1- 44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17 -401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17 -405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Existing SWPPP plan will be updated with this information. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17 -404. 1. Existing PPP plan will be updated with this information. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25- 870 -108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17 -403. 1. No changes to the existing SWM plan is proposed with this modification D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1- 44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17 -402. The modification can be approved with the addition of the Storm Drain Inlet Protection, Std. & Spec. 3.07 to the inlet of the new M -1 manhole structure. The inlet protection will be installed with each lifting of the manhole structure top section. A stone filter ring may be required by the VSMP inspector if excessive sediment is documented leaving the outlet pipe. A detail of the inlet protection has been added to the approved plans sets. County forms can be found on the county website forms center under engineering; h!Ltp://www.albemarle.ora/deptfonns.asp?department=cdengzMo File: CDDEI_vsmp_review_5th Street Station modification of basin #3_wpo201500017.doc