Loading...
HomeMy WebLinkAboutZTA200900007 Legacy Document 2009-04-24ZTA2009 -00007 Section 18- 5.1.18 Deletion of 18 -month time limit for temporary construction headquarters and provisions for consistent administrative regulation of temporary construction headquarters and temporary construction yards. Background • Section 5.1.18.1 allows Construction Headquarters to be located on a site until 30 days after completion of project. • Section 5.1.18.2 restricts temporary construction yards to a period not to exceed 18 months. • Both of these uses are currently designated as Mobile Office Trailer (MOTs) and are permitted with a building permit. Discussion • The two uses are similar in purpose and impact and should be administered consistently. • The proposal shifts the review from a building permit to a clearance process. • For larger construction projects, the 18 month time frame is not adequate, requiring requests for modification of Section 5.1.18.2. This is the basis of Mike Mathews' support of this ZTA. Proposed Revisions • Delete the 18 month limit for temporary construction yards. • Limit both the headquarters and the yards to a time period limited to 30 days prior to commencement of the project and a termination date 30 days after completion of the project or end of active construction activity. Replace "temporary permit" with "zoning clearance." • Replace the phrase "within the recorded subdivision" with the term "site." Proposed Revisions, cont'd • Combine Sections 5.1.18.1 and 5.1.18.2 into one section, 5.1.18. • The existing regulations are clarified and reorganized to address duration, location and maintenance for both headquarters and yards. The separate regulations for screening of yards are also retained. • The proposed amendment does not include separate definitions. Recommendations • Staff recommends approval of the Resolution of Intent and asks the Commission to advise if it recommends further revisions to the proposed ZTA and to set this matter for public hearing.