Executive Summary
Developed by citizens within the Village, the vision for the Village of Rivanna is
for a distinct small community surrounded by rural Albemarle. Medium and
low density residential neighborhoods will have easy access to the Village
Center through multiple modes of travel. The community will preserve
historic features, provide open spaces for recreation, and focus
commercial activity within the Village Center.
The Village of Rivanna Master Plan is intended to provide guidance on where
and how new residential and nonresidential uses should develop in the Village of
Rivanna development area. It is further intended to make recommendations on
the future of Route 250 East across the northern boundary of the development
area. Finally, its purpose is to guide the timing of new development in the
Village.
The key recommendations of this Master Plan are:
Residential Uses and Housing Types
• Residential uses will be the predominant use in this Development Area.
• A mix of housing types will be provided with the greatest variety of types
being in the Village Center.
• Density will radiate from the Village Center with the lowest densities at the
edges of the Development Area.
• Existing neighborhoods of Glenmore, Running Deer, and the Magruder
subdivision are expected to retain their low-density character.
• The Glenmore development is expected to remain unchanged, except for
orderly future expansion of approved additions.
• Developed land on the east side of Carroll Creek is not expected to
change in character, as it provides for a transition to the Rural Areas.
• Future residential development between the Village Center and Carroll
Creek will transition from the highest density near the Center to no more
than 3 units per acre near Carroll Creek. Density near the Village Center
adjacent to the proposed park can be higher if it is compensated for with
lower density elsewhere in this area. Development of this area should
include centralized amenities such as a pocket park or neighborhood
green.
• Future residential development should only be approved if and when
adequate infrastructure is in place to support that development.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 1
Mixed -Use Center
• The only commercial uses allowed in the Village are in the Village Center.
Inclusive of the Fire Station, this area should not have more than 125,000
square feet of non-residential uses.
Parks and Green Systems
• A naturalistic landscape buffer of approximately 50 feet in depth should
remain or be provided across the frontage of Route 250 to screen
development in the Village from Route 250.
• A Rivanna greenway trail will be provided along the Rivanna River.
• A community park will be developed within the Village Center to serve the
development area and the eastern part of the County.
• Pocket parks are expected with new development.
Streets and Roads
• Regional improvements include widening Route 250 to 4 -lanes 250/64
Shadwell interchange to Glenmore Way, improving the intersection of
Black Cat Road with Route 250, replacing or improving the railroad bridge
at Route 22 and Route 250, and improving the intersection of Rt. 250 and
Rt. 729.
• Only two additional points of access from Route 250 into the Village
should be provided. They would be at Hacktown Road across Route 250
and near or in the same location as Breezy Hill Lane.
• A signal or roundabout at Hacktown Road should be provided when
warrants are met.
• Except for the area near Ashton Road, no additional development should
be added to Glenmore without a 2nd gate
• Consideration should be given to replacing the proffered signal at
Glenmore Way with a roundabout
Paths
• A pedestrian crossing should be provided over Carroll Creek to link the
residential area of Running Deer Drive to the Village Center.
Development in this area should not preclude a future vehicular crossing,
if viewed as desirable in the future.
• Pedestrian connections from the Village Center should be made to
Glenmore and other nearby residential developments
• An asphalt pedestrian path should be provided across the frontage of the
Development Area which abuts Route 250 which will connect Glenmore
Village of Rivanna Master Plan DRAFT 5-25-09 Page 2
Way with Running Deer and all intervening streets.
Transit
• Transit should be provided to the Village of Rivanna where and when
feasible.
Timing of Development
Approval of future development proposals should be timed with provision
of adequate infrastructure.
Approval of future development should be monitored in conjunction with
available sewer capacity so that approvals do not exceed capacity.
Historic and Environmental Resources
• Historic resources should be preserved within the Village.
• Development inside the Village should respect historic resources outside
of the Village.
• Floodplain, wetlands, stream valleys, and slopes should be preserved and
enhanced as important features of the Village.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 3
Chapter 1 Introduction
Area Included in this Master Plan
The Village of Rivanna is located east of the City of Charlottesville and south of
Route 250 East. The development area is formed by the Rivanna River to the
southwest, Route 250 to the north, an unnamed stream east of Camp Branch
forms the western boundary, and the drainage area for Carroll Creek/Route 808
(Running Deer Drive) forms the eastern boundary.
As part of the development of the
plan a larger area was studied, which
included additional territory to the
east, to the north and to the west as
shown on the map to the left. The
larger area was studied to see if any
conditions had changed since
adoption of the prior land use plan for
the area. It was also studied to
assess the impacts of the
Development Area on the adjacent
Rural Area fringe. If conditions had
changed, boundary area expansions
would be considered. As no
significant conditions had changed,
no boundary expansions were
recommended with the adoption of
the master plan.
Purpose of the Plan
The plan is intended to provide guidance on where and how new residential and
nonresidential uses should develop. It is further intended to make
recommendations on the future of Route 250 East across the northern boundary
of the development area. Finally, its purpose is to guide the timing of new
development in the Village.
Planning in Albemarle County's Development Areas
Albemarle County has a long-standing goal of directing development into
designated Development Areas. With the continuance of County growth
management goals, the current development area concept remains a critical
Village of Rivanna Master Plan DRAFT 5-25-09 Page 4
planning component. The Land Use Plan of the Comprehensive Plan, including
the Neighborhood Model, presents mechanisms that will provide the best
opportunity for the County to achieve the goals of having compact livable
development in designated Development Areas and keeping the Rural Areas
rural.
The Comprehensive Plan establishes three types of Development Areas: Urban
Areas (Neighborhoods 1 — 7), Communities (Crozet, Hollymead, and Piney
Mountain) and Villages (the Village of Rivanna). Villages provide for a specialized
opportunity to accommodate growth. Villages are places that combine the
feeling of "country living" with the amenities of a Development Area.
Villages consist of a variety of housing types including single-family, two-family
and townhouse units, with a gross density not to exceed 6 dwellings per acre.
They are to be served by a village center of mixed service and residential uses.
They are to be served by public water and sewer and provide public facilities that
support the Village and the immediate surrounding Rural Area.
Villages should reflect the principles of The Neighborhood Model. The
Neighborhood Model is a County policy and a component of the Comprehensive
Plan. The purpose of the Neighborhood Model is to create places, following
twelve principles:
1. Pedestrian orientation
2. Neighborhood friendly streets and paths
3. Interconnected streets and transportation networks
4. Parks and open space
5. Neighborhood centers
6. Building and spaces of human scale
7. Relegated parking
8. Mixture of uses
9. Mixture of housing types and affordability
10. Redevelopment
11. Site planning that respects terrain
12. Clear boundaries with Rural Areas
Development proposals to introduce mixed use development and add density to
the Village in keeping with the Comprehensive Plan goals raised concerns of the
community. As a result, the master plan process was applied to the Village to
guide future development.
The Village of Rivanna as a Development Area
The County's designated Development Areas originally were established in 1971.
Since that time most of the boundaries of those areas have been modified.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 5
Some Development Areas were eliminated and one was created, which was the
Village of Rivanna.
The Village was approved as a development area on Dec. 13, 1989 after
application was made by a private developer and study by the Planning
Commission and Board of Supervisors. The area designated for the Village is
exactly the same as in this master plan. Expected density was one unit per 1.3
acres. In 1996, the County's Land Use Plan changed the density to match the
desired minimum residential density for all Development Areas which was 3 — 6
units per acre. The 1996 Land Use Plan showed the development area for this
area to be at 3 — 6 units per acre for neighborhood density residential uses.
In May of 2002, after application by a private developer and study by the
Planning Commission and Board of Supervisors, the Land Use Plan for the
Village changed to allow for a mixed use center. Residential density for the
Village did not change; however, the plan added a provision for non-residential
uses, mostly in small commercial, office, retail and restaurant/inn uses.
Planning Process and Public Involvement
In 2005, citizens of the Village requested that the County's next master plan be
developed for the Village of Rivanna. The Board of Supervisors approved this
request and the master planning process for the Village began in July 2007. As
with all master plans, the process began with a Citizens Planning Academy. The
objective of the Academy was to create a foundation of planning context for
Albemarle citizens.
On July 30, 2007 the first community workshop on the Village of Rivanna Master
Plan was held. The purpose of this workshop was to begin to develop a vision
for the Village of Rivanna Master Plan and to identify its important elements.
Around 100 participants attended the public workshop. All participants were
asked to identify three key issues they felt were important to the Village of
Rivanna Master Plan Vision. The comments in their entirety are appended to this
document. Through small group exercises, citizens were given the opportunity to
express themselves and learn from what others had to say. The following points
represent the main ideas expressed at the meeting.
• Preserve historic structures and rural character of area
• Improve ability of residents to access Rt. 250 and surrounding corridors
and destinations
• Increase walkability of development area
• Develop new ways to get around and enhance existing ones
• Maintain public safety
• Install necessary water, sewer, and transportation infrastructure before
constructing additional development in the growth area
Village of Rivanna Master Plan DRAFT 5-25-09 Page 6
• Protect environmental resources
• Maintain rural character of Rt. 250
• Develop Rivanna Village at a neighborhood scale with a sense of
character
• Manage the location and style of commercial development
• Create a "soft boundary" in edge neighborhoods, including Running Deer
Following the first public workshop a Stakeholders Work Group was formed, at
the direction of the Albemarle County Planning Commission. The Stakeholder
Work Group met for several months to advise County staff and the consultant on
how best to improve community engagement. The Stakeholders Work Group
provided guidance between November 2007 and June 2008.
Public workshops were held on January 30, 2008, February 11, 2008, and March
3, 2008 to focus on the vision for the area, land use, and transportation. At the
fourth public workshop, held on November 19, 2008, work -to -date was reviewed,
including the vision and guiding principles, and participants reviewed and chose
the preferred future land use arrangement. The Future Land Use Framework,
including the Future Land Use Map. in this master plan is a refinement of the
preferred future land use arrangement that was recommended by the public.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 7
Chapter 2 — Vision Statement & Guiding Principles
Introduction
The visioning process was the first step to know the desires and expectations for
the Village of Rivanna. The vision has set the direction of the Village of Rivanna
Master Plan. It builds on existing planning work and County policy, such as the
Neighborhood Model. Residents and property owners developed the vision as
well as the seven guiding principles, which capture what is most important for a
high quality of life in the Village.
Vision
The Village of Rivanna will be a distinct small community surrounded
by rural Albemarle. Medium and low density residential
neighborhoods will have easy access to the Village Center through
multiple modes of travel. The community will preserve historic
features, provide open spaces for recreation, and focus commercial
activity within the Village Center.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 8
Village of Rivanna Master Plan Guiding Principles
1. The density, design, and character of existing residential neighborhoods will be
protected as the Village of Rivanna further develops.
2. The size and scale of new development will be compatible with existing
neighborhoods within the Village of Rivanna.
3. The Village of Rivanna will integrate the natural landscape and incorporate
designs that complement the area's rural ambiance. Development along the
boundaries of the Village of Rivanna will be sensitive to adjacent rural areas.
4. The Village of Rivanna will concentrate commercial uses into a pedestrian -
friendly Village Center where commercial and public services are at an
appropriate scale for meeting the community's common needs.
5. Street connections to and pedestrian paths between residential areas and the
Village Center, and between the Village of Rivanna and larger community, will
be sensitive to existing development. Options for different types of travel will be
provided, including driving, walking, cycling, and public transit. Street designs
will promote good driver behavior and be appropriately sized for the volume
and speed of traffic.
6. Historic sites in the Village of Rivanna and surrounding area, including
Glenmore Manor, the Hacktown community, Clifton Inn, and Stump Island, will
be respected.
7. Water, sewer and streets will keep pace with changes and growth that occur
within the Village of Rivanna.
8. Public and private common space, parks, and sports fields will be provided and
located to foster a vibrant community
Village of Rivanna Master Plan DRAFT 5-25-09 Page 9
Chapter 3 Existing Conditions and Future Trends
Introduction
This chapter of the Master Plan provides a
snapshot of the natural and built environmental in
the Development Area and nearby study area. It
examines the existing demographics and the
demographic trends. Existing land uses, the
transportation network and current and planned
infrastructure are discussed as well.
Natural, Scenic and Historic Assets
The Village of Rivanna lies within the Rivanna
River watershed. The Rivanna River is the
largest tributary of the James River, flowing into
the James at the Town of Columbia in Fluvanna County. It has important
historical, recreational and natural significance and is a key resource for water
and wastewater management. The River offers recreational opportunities such
as boating and fishing, and there are County plans for a greenway trail along the
Rivanna River. The Rivanna River and its tributaries, particularly Carroll Creek,
are home to a variety of wildlife. In 1975, the Rivanna River was designated a
state scenic river from Woolen Mills south of Pantops to its confluence with the
James River. Virginia's scenic rivers program is set up to identify, designate and
help protect rivers and streams that have outstanding scenic, recreational and
natural characteristics of statewide significance. In 2009, the Virginia Scenic
River designation was extended upstream to the South Fork Rivanna River
Reservoir dam.
Within the Development Area, the Rivanna River is the most prominent
environmental feature. It has a significant floodplain and associated wetlands.
Carroll Creek, as well as another tributary to the Rivanna River near Milton
Heights, flow into the Rivanna River. There are many smaller streams that also
feed into the Rivanna River within the Development Area. These streams have
steep and shallow valleys and some also have associated floodplains and
wetlands.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 10
The Rivanna River has also played an important role in the history of the area.
Used for navigation, it allowed for economic growth of the communities of
Shadwell and Milton. Thomas Jefferson had grist mill on the Rivanna and he
helped to develop sluices, locks, and dams to help with navigation to his mill in
Village of Rivanna Master Plan DRAFT 8-25-09 Page 11
the late 18th and early 19th centuries. Ruins of a series of canals, dams, and
locks exist along the Rivanna in and near the Village. A full description of the
series of locks and dams is provided in the 1995 report, "From the Monacans to
Monticello and Beyond: Prehistoric and Historic Contexts for Albemarle County,
Virginia", provided by Garrow and Associates, Inc.
The most significant historical resource of Albemarle County is Thomas
Jefferson's home, Monticello. Monticello was constructed between 1770 and
1809 and is located on Route 53 to the southwest of the Village of Rivanna.
Jefferson owned 5000 acres of land that included Monticello and portions of that
land are to the south and west of the Village. Protecting Monticello is an
important theme throughout the Comprehensive Plan and is referenced in the
Historic Preservation Plan, the Mountain Protection Plan and the Open Space
Plan. It is a National Historic Landmark and the only home in America on the
World Heritage List. Monticello's elevated location gives it broad vistas and the
Thomas Jefferson Foundation, and the County, seek to protect these viewsheds
although there are no formal County requirements to address this issue. County
staff coordinates with Monticello staff in an informal manner to encourage
viewshed protection.
Y Shadwell._ `
[ � Union-Run•Baptist Ch rch ravey.ard
Jackso_ n Camp, 862, C. No-3
Jefferson's Mill
C^liftn Inn
* I nGlenmore Man r an veyar q
CanoeyandinjMj
The Milt' C nal,
i
Aft
�Hende . on'. Fj Is sl ices'
i � J
agr . der' Mill
St mp Island Lock an m
Historical Resources
Village of Rivanna Master Plan DRAFT 8-25-09 Page 12
There are other significant historical sites within or in close proximity to the
Village of Rivanna. The Glenmore House, which lies within the Glenmore
subdivision, was built beginning circa 1750 with extensive additions added
thereafter. The pre-Revolutionary Glenmore was one room and a basement
heart, built of stone with mud mortar. Historically, much of the agrarian activity in
the area centered on Glenmore plantation. Like other Piedmont plantations,
Glenmore goes back to a grant of George II in 1732.
The Clifton estate, located east of the Development Area, was part of a 3,000
acre grant belonging to Peter Jefferson. Approximately 350 acres of the land
was passed on to Thomas Jefferson's daughter and her husband Thomas Mann
Randolph. Today Clifton is a five -room county inn with three historic
dependencies, used today as additional gust accommodations.
Other nearby significant areas include the Southwest Mountains Rural Historic
District and a property to the east of Running Deer Drive which has a
conservation easement. The Southwest Mountains Rural Historic District is listed
on the state and national registers. It is a 31,000 acre historic district designated
by the National Park Service for cultural, architectural and landscape features of
the state and nation. The conservation easement to the east of the Village
covers 466 acres and is held by the Virginia Outdoors Foundation.
Demographics
Over the past decade, growth in the Village of Rivanna has been steady with
almost all new permits being issued for the Glenmore development. The
Glenmore development has potential for 966 units and, as of March 2009, had
693 dwellings. These 683 units represent almost 90% of the existing homes in
the Village.
Based on March 2009 estimates, there were 761 dwellings in the Village of
Rivanna with an estimated population of 1617 residents. For the area around the
Village which was part of the overall study area, there were approximately 1902
residents.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 13
Existing Land Use
Within the Development Area, there are two businesses; however, in the nearby
area, there are a total of sixteen institutional and commercial uses. Institutional
uses include Stone Robinson Elementary School, churches, the Moose Lodge,
the Glenmore Country Club/Golf Course and a day care center. Commercial
uses include the Clifton Inn, and small country stores. The Village of Rivanna is
located approximately four miles from a major shopping center and other
commercial areas on Pantops Mountain.
r
Uhion.Run
- — -- — East Rivanna
' Baptist ['hurch� �
Volunteer Fire
Stone=Rubinson CompanvL,--"\�y
Elementary.School
r Moose L'adge
250
Colonial
B► )tistt
Church
Glenmore
Country Club
Institutional Uses -
The map on the following page provides a snapshot of existing land use. The
Development Area is approximately 2.7 square miles. As the map shows, the
largest part of the Development Area is the Glenmore development. Low density
residential development is the primary land use in the Village.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 14
Vi•Ilage of Rivanna
Lxis- ing\L\and Use
`f��__—__ 250_ y•~� �.
l •• �, =� •fes-•' ��
'1.. La ora.w aw. _ •.
•l. C.rnm...ao-..n� n Awe
EMWI,s Lu d Uu
� cam.....
uw.�w a ons sw�• -`
rrerxm�r–rwt.nm •��.
c 25 5 a .-5
i'
• M I -s
Community Facilities
Schools
The area is served by the Stone Robinson Elementary School, which is located
nearby. Students then transfer to Burley Middle School and Monticello High
School. There are no public schools located within the Village.
Parks
The Glenmore development has private recreational facilities which serve most
of the residents of the Village. These facilities include a golf course, swimming
pool, tennis courts, practice soccer field, and equestrian center.
A new public park has been planned for the Village Center. It will be an 18 acre
park with amenities such as tennis courts, play areas, restrooms, trails, and
shelters. The existing quarry is recommended to be incorporated into the park as
a feature.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 15
Outside of the Village, there is a public boat access to the Rivanna River at the
Route 729 bridge. A public greenway is planned along the Rivanna River in the
Village.
Police and Fire Rescue
Police service is provided by the County from the Albemarle County Office
Building on 5t" Street south of Charlottesville. A room at the East Rivanna
Volunteer Fire station provides an on-site office for police use when needed.
Police officers work on a sector/beat system and the Village of Rivanna is
included as part of the rural area's patrol program. Response times meet
standards for the Rural Areas which are to respond on first priority items within
ten minutes of the call.
The East Rivanna Volunteer Fire Department operates a joint County/Volunteer
fire station near the entrance of Glenmore. The facility serves the fire and
rescue needs of not only the Village of Rivanna but the areas east of the Village.
The facility is also used by the community for civic events and fund-raising
activities.
Library
Public library service is provided through the Jefferson -Madison Regional Library
system. The Downtown Charlottesville branch of the library is located
approximately five miles from the Village of Rivanna. As a general guideline,
libraries are not usually located within six miles of other libraries. A future library
is planned for the urban neighborhoods south of Charlottesville to be built within
the next ten years. This library will also be accessible to residents of the Village.
Water and Sewer
Water treatment comes from the South Rivanna and Observatory Water
Treatment Plants. A waterline along Route 250 from Pantops is sized
adequately to serve the entire Village.
Wastewater treatment is provided at the Glenmore sewage treatment plant on
Carroll Creek. Capacity of the facility, including an upgrade to be provided by a
private developer is 381,000 gallons per day. At present, average daily usage is
120,000 gallons per day. The sewage treatment plant with the upgrade has
capacity to serve the Village Center as well as undeveloped properties approved
for the Glenmore planned development. It also has capacity for development of
the remainder of the Village if the Village is developed at 3 dwelling units per
acre or less, based on current per household usage.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 16
Existing Transportation Network
Roads
The Village of Rivanna is served through a network of private and public roads.
The Glenmore subdivision is served by an extensive internal private road system.
5
J -
si
��3Go
iso
G ..n
" Leye�rd°m
Roads
y :y Railroad
,TAUNT Route
River/Stream
Q VOR Development Area
Q Master Plan Study Area
2001 AADT
*OV 9300 Vehicles/Day
12000 VehicleslDay
22000 Vehicles/Day
Running Deer Drive forms most of the eastern boundary of the Development
Area. It is a public road accessed directly off of Route 250. There are also
private accessways which serve rural style development within the Development
Areas. When developed, Rivanna Village at Glenmore will have a network of
internal roads connecting to development within the Village and to Route 250.
Route 250 serves the Village of Rivanna for trips outside the village.
Destinations include Pantops, the City of Charlottesville and Zion Crossroads.
As the following table shows, Route 250 traffic is at its greatest from the eastern
City line to Route 20. Traffic volume decreases on Route 250 east of Shadwell
with approximately 5,500 vehicles from Route 22 to the Fluvanna County line as
an annual average daily traffic count.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 17
Annual Average Daily Traffic Volume Estimates, 2007
Source: Virginia Department of Transportation
Pedestrian and Bicycle Networks
Pedestrian and bicycle accommodations are
primarily within the Glenmore subdivision.
There is a network of internal sidewalks and
trails serving the residents of Glenmore.
There are no external connections linking
the Glenmore network to destinations
outside Glenmore. Rivanna Village at
Glenmore will have an internal network for
pedestrians and bicyclists.
Transit
� T
There is no transit service in the Village of Rivanna except for JAUNT
complementary accessible service.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 18
AADT
Route
Length
From
To
(Volume)
Route 250
East City Line
SR 20 Stony Point
Richmond Rd.
0.20
Charlottesville
Rd
52,000
Route 250
SR 20 Stony Point
1-64 East of
Richmond Rd
1.64
Rd
Charlottesville
37,000
Route 250
1-64 East of
Richmond Rd
2.16
Charlottesville
SR 22 Louisa Rd
23,000
Route 250
Fluvanna County
Richmond Rd
4.40
SR 22 Louisa Rd
Line
5,500
Source: Virginia Department of Transportation
Pedestrian and Bicycle Networks
Pedestrian and bicycle accommodations are
primarily within the Glenmore subdivision.
There is a network of internal sidewalks and
trails serving the residents of Glenmore.
There are no external connections linking
the Glenmore network to destinations
outside Glenmore. Rivanna Village at
Glenmore will have an internal network for
pedestrians and bicyclists.
Transit
� T
There is no transit service in the Village of Rivanna except for JAUNT
complementary accessible service.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 18
Future Trends and Conditions
Population
As mentioned earlier in the report, the Village was designated for development in
late 1989 growth in that development area has taken place since that time. The
table below shows growth in the Village of Rivanna over almost twenty years.
Residential Units and Population Growth 1990 - 2009
Year
Units
Population
1990
75
211
2000
502
1,355
2009
761
1,617
Sources: U.S. Census; Albemarle County Department of Community
Development
Although the rate of growth has been great over the last almost twenty years, this
Development Area currently is restricted in growth by existing zoning. Except for
the Village Center and Glenmore, the zoning on the properties in the Village is
currently Rural Area (RA) which has a density of 1 unit per 21 acres, where
development rights have been already used. Capacity in the sewer system
exists for the low end of the density range for the remainder of the Village (3
dwelling units per acre). Capacity for the middle and higher end of the County's
neighborhood density range (4.5 — 6 dwelling units per acre) will likely involve
significantly more investment in the sewage treatment facility. Current density
recommendations of this Master Plan are based on the existing sewer capacity.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 19
Chapter 4 Future Land Use and Transportation
Framework
Village of Rivanna Master Plan Framework and Framework Map
The Future Land Use Framework and Future Land Use Framework Map
identify the land use designations, the standards regarding uses, recommended
densities and identifies the village center. The Transportation Map details the
transportation network and makes recommendations for their improvement. A
multimodal approach is taken so all modes of travel — vehicular, pedestrian,
bicycle, and transit — are considered. Based on traffic projections, improvements
to the transportation network are recommended. The Parks and Green
Systems Map identifies existing and recommended parks, open space and
greenways. In addition, the Village of Rivanna Master Plan makes
recommendations for the preservation and protection of historical and cultural
resources.
Future Land Use Framework
Proposed land uses are shown on the Future Land Use Map shown on the next
page. The land use map reflects an expectation that the density, design, and
character of existing residential neighborhoods in the Village of Rivanna will be
retained as the Village of Rivanna further develops. A single Village Center will
be one of the two focal points for the Village. The other focal point is the existing
private golf course and recreational features of the Glenmore development.
Residential Areas
Residential uses will be the predominant use in this Development Area. A mix of
housing types will be provided with the greatest variety of types being in the
Village Center. Density will radiate from the Village Center with the lowest
densities at the edges of the Development Area.
Existing neighborhoods of Glenmore, Running Deer, and the Magruder
subdivision are expected to retain their low-density character. The Glenmore
development is expected to remain unchanged, except for orderly future
expansion of approved additions. Developed land on the east side of Carroll
Creek is not expected to change in character, as it provides for a transition to the
Rural Areas.
Future residential development between the Village Center and Carroll Creek will
transition from the highest density near the Center to no more than 3 units per
Village of Rivanna Master Plan DRAFT 8-25-09 Page 20
acre near Carroll Creek. Future residential development should only be
approved if and when adequate infrastructure is in place to support that
development. It is expected to be at a size and scale compatible with existing
neighborhoods within the Village of Rivanna. The expected number of new
dwellings, in addition to approved developments at the adoption of this Master
Plan, is between 300 — 400 units. In order to maintain this number of new
dwellings, if higher density development is focused in the area adjacent to the
Village Center (Rivanna Village at Glenmore), then a proportionately lower
density in remaining areas will occur.
The Village Center
The Village Center (approved in 2007 as the Rivanna Village at Glenmore) will
have a mixture of residential and non-residential uses. Other characteristics
include:
• Neo -traditional streets characterized by narrow widths, on -street parking,
curb, gutter, sidewalks, and street trees
• A "main street" with retail and office buildings.
• Street connections to both Glenmore Way, Route 250 East and properties
to the south and east of the Village Center.
• A variety of housing types that provide opportunities for all age groups,
including senior housing and housing for all socioeconomic levels to live in
the Village of Rivanna.
• Non-residential uses, mostly in small commercial, office, retail and
restaurant/inn uses. Total square footage should not exceed 125,000 for
retail, office and institutional uses including the East Rivanna fire station.
Automobile repair and self -storage areas are not considered to be
appropriate uses for the Village.
• Design at a pedestrian scale that reflects the architectural tradition of
Williamsburg and other historic towns in Virginia
• A well -integrated pedestrian system, including sidewalks and paths.
• A variety of park and recreational amenities including open space
appropriate to the residential needs of the Village.
• Development in a manner that is sensitive to its location within
Monticello's viewshed in accordance with the Monticello Viewshed
Guidelines for Developers.
• Minimization of adverse impacts on residential properties adjoining the
Village Center by preserving mature vegetation, having residences abut
adjoining residential properties, use of buffering, screening and berming
and use of wide buffer strips.
• Shared parking.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 21
Historic Sites
Historic sites both inside and outside the Village are affected by development of
the Village. Care should be taken with new development that size, scale, and
visibility of new development complements surrounding sites. Coordination with
Monticello on impacts to the viewshed should continue when new development is
considered. Protection of the ruins along the Rivanna River and the Glenmore
Manor should also take place.
Outside of the Development Area
Outside of the Village of Rivanna, Rural Areas are to remain rural, including the
areas between Route 250 and Interstate 64 which were included in the study
area for this Master Plan. No expansion of the Development Area east of
Running Deer Drive is to occur.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 22
Future Land Use Maps
v z Vi I lager of "'Ri canna j1
K -.Future`Land..Use-Context
a
• XSO
. f� �, •. 'moi - '-. !y I 1•. • f/ -ti r ` ,J _ � U
G , •' Awl c JS
1 a �,.• fera _.• o 7 _ '/ (%
4 N •t
e �, acv vrsaoe� e° • �+ -, r ��..�._,+=
r a SeeQ�utiire nd�Us� °p
„r; obi followingrpage
4 IF
io
;e o
• o 69am ° � n ,•
•� .. Ay. 'v � s 4 - r
/ v y
G
0.5 f 0.75 r
Mtles—
IT
— rn[erstale FWodpralns '� � � -p'.�.
u$ c+5[ate RouGa ®Stream 6uMer l
i`
Counry a Private Road Cxeen Corridors .r
»±Pn]p06ed Aa Pdrd - Canservabon Easement ` ��' :r•'�--°y�
VlAtar Feal” ® Village Park
r� w 1NAlIpBllny CncresExisllrq Oevelapmenl f, 2 D.0 +Rc]
&Wdings rJEr(U&hood Dered tFo., e 2 D.U.IAc)
Rrvanna Rhar Tralr WQhDort d D—o Imiu, 3 D.0 FAQ
E=1Vl Mge of RNanna SMy Aro _ Rrvanna_Village
vll[age of RNanna DmbWentArea - Rt Zgp Vegetation buffer
CdwdI SIDpe volage or Rrcanna Fulwe Land Use Inset
Village of Rivanna Master Plan DRAFT 8-25-09 Page 23
oa
•o
b
Village
of Rivanna
D Q
4o
Future
Land Use
250 p� .... A .�
, ❑
■
'� _ •' Potential for Higher Development ,
•�•
96
f jkI��
o �
.� •
O
a� � I
4f
a ; Leave Open For Potential
/f ■
D
r
Road or Trail
■, Y�
Glp °
4 �
�•
O � ,■ ■
Leave Open For Potential
r -' ► �_
aRoad (with gate) or Trail
` r '• _
p
t
c
d b
4474r q Q � a
t
■
�
■i
cl
QQQqj
� ❑ $ J7�r fermi .�
a 6 ���
�b �trD�
a,
�r n •
•,
,�0'4
t`
�aQo,
--- Proposed Access Point
Interstate
US or State Route
p
Other Road
Neter Feature
Mikability Circles
Eb
Critical Slope
Q
!r
O
12 cl�'
❑
❑
Floodplains
G3 •
Q•
® Stream Buffer
B
u
- Rt 250 Vegetafiee buffer
❑ C' i❑y
47 o
_ village Center
O 6
4o a
_ Open Space (Green Corridor)
Future Park
Existing Deve4ment 2 D.U.IAc)
(r
:1 V,
Neighborhood Density (low, <2 D.UJAc)01
a
M
Neighborhood Density (mid, 3 D-WAc)
�� —.1 °CD•2
ti
0.3 0.4 0.5
- -xn
Miles
Village of Rivanna Master Plan DRAFT 8-25-09 Page 24
Future Transportation Framework
The future transportation network is divided into 3 sections: vehicular; transit; and
pedestrian/bicycle. While vehicular travel the dominant means of transportation,
transit service and accommodations for pedestrians and cyclists are included
with this plan.
Vehicular Traffic
Route 250 East is a state highway which extends from Richmond to West
Virginia. It is the northern boundary of the Village of Rivanna development area.
As a regional thoroughfare, it serves a much greater area than the Village of
Rivanna. It is a major commuter route between Louisa & Fluvanna counties and
Charlottesville. Because of its function in a larger network, traffic from the Village
is only a small portion of the overall volume.
As indicated in the prior chapter, traffic near the County line with Fluvanna
represents the lowest volume of traffic on Route 250 East between the County
line and the City of Charlottesville. By the time Route 250 East reaches Route
20 north, traffic has increased tenfold.
Traffic on Route 250 East overall is expected to grow significantly in the next 25
years as a result of growth east of Albemarle County and other growth in the
area. Additional growth resulting from new rezonings within the Village of
Rivanna is not expected to have an impact on Route 250 East. Projections
provided by the Virginia Department of Transportation are below:
2007 and Projected 2035 Average Annual Daily Traffic
Source: Virginia Department of Transportation
Village of Rivanna Master Plan DRAFT 5-25-09 Page 25
AADT
AADT
Volume
Projected
Route
Length
From
To
2007
2035
Route 250
SR 20
Richmond
East City Line
Stony Point
78,747
Rd.
0.20
Charlottesville
Rd
52,000
Route 250
1-64 East of
Richmond
SR 20 Stony
Charlottesvi
Rd
1.64
Point Rd
Ile
37,000
79,384
Route 250
Richmond
1-64 East of
SR 22
42,185
Rd
2.16
Charlottesville
Louisa Rd
23,000
Route 250
Richmond
SR 22 Louisa
Fluvanna
24,400
Rd
4.40
Rd
I County Line
1 5,500
Source: Virginia Department of Transportation
Village of Rivanna Master Plan DRAFT 5-25-09 Page 25
To deal with the additional traffic, several recommendations which affect the
regional nature of Route 250 East are made. They include:
• Improving the interchange improvements at the 1-64/Shadwell interchange to
install dual left turn lanes on the southbound exit ramp onto Route 250 East
• Widening Rt. 250 East from two -three lanes to four lanes east of the
Interstate 64/Shadwell interchange
• Repairing/replacing the bridge over the railroad at Route 22 to solve short-
term safety problems
• Improving the intersection of Rt. 250 East and Route 729 (Milton Road) and
optimizing signal timing
• Improving the intersection of Blackcat Road and Route 250 East
• Monitoring the signal at Glenmore Way and Route 250 East, when installed,
to evaluate whether a roundabout is more appropriate
Recommended Characteristics of Route 250 East
The following recommendations relate to the character of the improvements on
Route 250 East as they affect the Village of Rivanna.
• Route 250 should be a rural section road of 4 lanes from 250/64 Shadwell
interchange to Glenmore Way. This road section should include a median
and a walking/bicycling path on the southern side of Route 250.
V,
Walking/biking path on far left
• Route 250 should be a rural section road of 2 lanes from Glenmore Way
eastward to Black Cat Road, Route 616. Left hand turn lanes may be
needed to accommodate existing entrances. This road section should
include a walking/bicycling path on the southern side of Route 250.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 26
Walking/biking path on far left
Walking/biking path on far left
• A naturalistic landscape buffer should be established along the southern
side of Route 250 so that the non-residential uses in the Village Center
are not visible from Route 250.
Other Recommendations for Vehicular Transportation in Village
• Additional points of access from Route 250 into the Development Area
should be limited to Hacktown Road and near or in the same location as
Breezy Hill Lane. The intersection with Hacktown Road may require a
roundabout or signal when warrants are met.
• Except for the area around Ashton Road, no additional development
should be added to Glenmore without a second gate.
• For the long term, consideration should be given to replace the proffered
signal light at Glenmore Way with a roundabout for improved traffic flow.
• A Park and Ride lot should be established within the Village.
Transit Service
• Fixed- route transit service should be provided to the Village of Rivanna
when ridership levels can support transit.
• New development should be transit -ready design.
Village of Rivanna Master Plan DRAFT 5-25-09 Page 27
Pedestrian and Bicycle Network
• A pedestrian crossing over Carroll Creek should be provided to link new
residential development and the residential area of Running Deer to the
Village Center.
• Pedestrian connections to the Village Center should be established,
linking Glenmore and nearby residential development to the Village
Center.
• An asphalt pedestrian/bicycle path should be provided across the frontage
of the Development Area, abutting Route 250 between Route 250 and the
landscape buffer. Such a path would connect Glenmore Way with
Running Deer and all intervening streets
Parks and Green Systems
The Guiding Principles for the Village of Rivanna emphasize integration of the
natural landscape and that public and private common space, parks, and sports
fields will be provided and located to foster a vibrant community. These
emphases are reflected in the following Green Infrastructure framework map. It
is especially important that the Rivanna River corridor be protected and be
available to the public. The Parks and Green Systems are intended to protect
natural systems and provide resources to residents. To that end, floodplains,
critical slopes and riparian buffers are preserved. In addition, the Village Center
— Rivanna Village at Glenmore — will include an 18 acre community park. The
Rivanna River greenway trail, which is also part of the County's Greenway Plan,
will follow the northern side of the river and ultimately become part of a larger
Rivanna River trail system. Pocket parks should be included in future
development with amenities for new residents which are within close proximity to
homes.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 28
Village of Rivanna Master Plan DRAFT 8-25-09 Page 29
. -•=-���;. ,•�. - _..
lage�p�-vanna
-
Vi fR�
a
Parks and GreenySystems
250
0 ..
Pocket Parks Reconmmended
in New Development
{ r
L=ave Open For Potentia] ^ s x -
Road(with gate) orTrail I r �•` t
Leave Open For Potential +
Road or Trail
-�• ��
Text
..
i! r?
a
`
Y a
01
- w
0 .25 A6,5
a. 59 1
Miles=�
.
P
�
Inferslate�
Village of Rive nna Development Area
9"
g
;• �„
CJs or State Route
Cntical Slope
Courny or Private Road
modplams
1 0
---- Proposed Access Polnt
® Stream Buffer
Waiter Feature
NFafkabitity Circles
Green CORIdOFS
- Corrs rvation Easement
t .,• a -df
Rivanna River Trail
- Rt 250 Vegetalian buffer
6
.Wlage of Rivama Sourly
Area
1 '•
r'
Village of Rivanna Master Plan DRAFT 8-25-09 Page 29
Chapter 5 Implementation
The implementation initiatives of the Village of Rivanna Master Plan have been
organized based on priority needs identified by residents and stakeholders during the
master plan process (See Table below). Implementation of these initiatives will take
place in several different forms: through county capital expenditures (CIP), land use
decisions, private sector investment, community initiatives, and programs and services
provided by the county.
Addressing traffic issues on Route 250 is the highest priority for the Village of Rivanna.
The regional projects identified in the plan will be necessary to address future growth of
a larger area but also affect the Village of Rivanna. Public road projects are the
responsibility of the Virginia Department of Transportation (VDOT).
The County's Capital Improvements Program (CIP), based on a two-year financial cycle,
represents the County's funding policy, including funding level, timing and sources
associated with specific improvements. The actual programming of projects in the CIP
will be based on priority needs and availability of funding from the sources anticipated in
this section
The County will take the lead in initiating non-public road projects and coordinating with
other entities and agencies and may need to partner with VDOT on some road
improvement projects. In some instances, initiatives will be joint projects and the project
manager would not necessarily be the County. However, a point person from the County
will always be assigned to the project. The table below indicates who would be
anticipated as the project lead and then where necessary, who would be the liason from
the County if the County is not the lead.
Village of Rivanna Community Advisory Council (RCAC)
As with other master -planned Development Areas, the County's Board of Supervisors
will establish the village of Rivanna Community Advisory Council (RCAC) to work with
Staff to monitor the implementation of the Village of Rivanna Master Plan. The form and
composition of the RCAC will be determined after adoption of the plan.
The projects needed to implement the plan are as follows:
Village of Rivanna Master Plan DRAFT 8-25-09 Page 30
Village ofPovanna lmplemer►tation Prnjects
Implementation Strategy
Estimated
Responsible
Issues to Be Addressed
Miestones
Timing
Cost/Funding
Departrne * Division
Actions Required
Short-term (FY08 to FY12)
Mid-term (FY 13 to FY 17)
Lon -term(FYI 8 and out
T .4NSRXrATION
US Route 250 East
1-64 at Shadv\ll
$3.14 nillion
\/DOT and developer
■ Install dual left -tum lanes on
■ Design
Short-term
Interchange improven eats
contributions
southbound exit rarrps onto US
■ Construct
— Regional — outside of
250
Village
Four -lane from Shadv%d1
$12 million
\/DOT
■ Provide capacity/maintain
■ Design for road sections
Design — mid-term
Interchange to Glenmo-e
adequate level of service
■ Construct
Way entrance — Regional —
■ Design sensitivity towards historic
Construction — mid to long term
outside of Village
setting, EC, adjacent historic
construction Wth or after
properties and easements
improvement to US 2250 in
Pantops
Intersection
$850,000
\/DOT
■ Improve capacity and functionality
■ Design
Coordinate with bridge over
improvementsioptimize
of intersection
■ Construct
railroad at R. 22—short or mid -
signal timing at intersection
■ Additional tum lanes on R. 729
■ Coordinate with bridge
term
of US 250 and R. 729 (N.
■ Lengthen tum lanes of R. 729
improvement project
Nllton Road) - Regional —
outside of Village
Bridge over railroad at
$8.75 million
\/DOT
■ Address deteriorating condition of
■ CaTplete design
-term
Route 22 to solve short-
bridge
■ Construct
term safety - Regional —
■ Design/oonstruct to ultimate future
outside of Village
need
■ Accommodate pedestrians and
bikes
Village of Rivanna Master Plan DRAFT 8-25-09 Page 31
Implementation Strategy
Estimated
Responsible
Issues to Be Addressed
Milestones
Timing
Cost/Funding
Department/ Division
Actions Required
Short-term (FY08 to FY12)
Mid-term (FY 13 to FY 17)
Long-term (FY 18 and out)
Possible replacement of
$350,000
\/DOT
■ Evaluate functionYcapaaty benefit
■ Periodic monitoring and evaluation
Long - term
traffic signal at Genmore
of roundabout over signal
of intersection
Way and US 250 with
roundabout
"Regional" Transit-
Short term—establish regional
Express Bus (Fluvanna Co.
Capital:
County/CTS/possibly
■ Provide alt to auto travel, reduce
■ Establish RTA or an equivalent
planning/management process
to City on US 250) -
$305,000 to
JAUNT or future
future auto trips on Rt 250
planning/rranagen-ent organization
Regional — but includes
$575,000
Transit Authority or
■ Implement service
Short to Md term priority (w/in
Village
equivalent
next 5-10 years), next regional
Operation:
organization
transit plan update.
$200,000 to
$400,000/yr
Long-term Implementation
(after 2017) depending on
study results.
PARKS AND GREEN SYSTEMS
Rivanna River Greenway
Short and mid-term timeframe.
completion
■ Provide passive recreation
■ Easements/Fee obtained
Ongoing planning/
Cultural -Natural Heritage
$50,000
Parks and
opportunity & alt ped -bike route.
■ Complete Trail Construction
acq/construction throughout
Sites/Boat Launch/oomplete
Rec/Planning
■ Interpret cult -Nat sites
length of corridor in strategic
trails — Regional
locations
Upgrade to Rivanna River
TBD
County/private
■ Upgrade existing reiver access
■ Acquire additional land or
Md -term
Access Pant (Rt. 729—
developer
pant along ad road r.o.w. at R.
easements
IVllton) — Regional
contributions
729 bridge
■ Construct
■ Provide additional parking
■ Construct shelter and trail to river
Neighborhood Trails
Not known at
Private developer
■ P & R Tillage of Rvanna's planner
■ Connections made betwen
Ongoing, initiative; trails may
Connect Deerwood
this time
contributions with
to coordinate assistance to
neighborhoods and to
be public or private
neighborhood to Vllage
rezonings
neighborhoods to construct trails
greenway/public lands
Center
Parks &
Rec./Ranningt
neighborhood assoc.'s
Village of Rivanna Master Plan DRAFT 8-25-09 Page 32
Implementation Strategy
Estimated
Responsible
Issues to Be Addressed
Milestones
Timing
Cost/Funding
Department/ Division
Actions Required
Short-term (FY08 to FY12)
Mid-term (FY 13 to FY 17)
Lon -term (FY 18 and out)
Corr mnity Park
Private development/
■ Stormn�ater management and
■ Intended to be publicly
In conjunction with first phase
Planning/Parks & Rec.
retention of quarry
owned/maintained
of Rivanna Mllage at Glenmore
■ P&R/ Mllage of Rivanna's planner
development
to coordinate assistance in
corrpletion of plan
LAND USE & DESIGN PRINCIPLES
Residential density near
Private developers,
■ Monitor capacity of sewage
■ No additional density in Mllage if
Short and and -term
Village Center
Mllage of Rivanna
treatment plant
LOS on R. 250 goes below at
Planner/ PC/BOS
location
Monticello Viewshed
Mllage of Rivanna
■ Minimize visual impact of new
■ Implementation of designs in
Short, md, and long-term
Protection
Planner/ Preservation
development to the Montioello
Master Plan; Revise EC guidelines;
Require Monticello review
Planner
Mewshed
of all projects
COMPAJINITY FACIUTIES & SERVICES
Recycling Programs
$250,000-
$500,000—to
RSWNCounty
(General Services,
■ Provide convenient drop center.
RSWA Solid Waste Mgt Plan
■ Revieww/ RSWA during update of
Solid Waste Plan. Funding
Dependent on implementation
recornrnendations of Solid
be determined
Planning)
■ Review may indicate different
requested in GP.
Waste plan as recon vended
on revised
approach to recycle (curbside may
■ Construction
in adopted plan
regional solid
be considered)
waste Pan
Fire/Rescue Service —
Mllage of Rivanna
■ Monitor need for ambulance
■ Evaluate facility needs w/ yearly
CnKloing yearly evaluation of
monitor needs — region is
Planner/Fre&Rescue/
service from station
long range planning process
growth in eastern part of
served by ERFRS
Facilities staff
County and facility needs.
Police Service— monitor
Milage of Rivanna
■ Evaluate future facility/service
■ Evaluate facility needs
Ongoing yearly evaluation of
needs
Planner/Police,
needs
■ Monitor needs for satellite office for
population growth and facility
Facilities staff
beat officer located in fire station
needs.
Village of Rivanna Master Plan DRAFT 8-25-09 Page 33
Implementation Strategy
Estimated
Responsible
Issues to Be Addressed
Milestones
Timing
Cost/Funding
Department/ Division
Actions Required
Short-term (FY08 to FY12)
Mid-term (FY 13 to FY 17)
Long-term (FY 18 and out)
library Service— monitor
Village of Rivanna
■ Continue to consider facility needs
■ Evaluate facility needs
Ongoing yearly evaluation of
needs
Planner/JN/RL Board,
w/ long range planning process of
growth in eastern part of
Facilities staff
the JN/RL Board.
County and facility needs.
Schools — monitor needs
Village of Rivanna
■ Continue to consider facility needs
■ Evaluate fad Iity needs
Ongoing yearly evaluation of
Planner/Dept of Ed.,
w/ long range Planning Committee.
school growth and facility
Facilities staff
needs with long range Planning
Co Tr ittee
Historic/Cultural
not known at
Village of Rivanna
■ Evaluate opportunities for
■ Investigate support to provide
Short to mid-term
Resources programs
this tine
Planner/Historic Pres
interpretation of area history
locate history interpretation at local
Interpretation Opportunities
Conrn/commnity
institutions
Village of Rivanna Master Plan DRAFT 8-25-09 Page 34