Loading...
HomeMy WebLinkAboutZTA200900017 Legacy Document 2009-11-11 (5)ZTA 2009 -017 - Fees - Amend and renumber Sec. 35.0 (to 35.1) , Fees; amend, renumber and rename Sec. 35.1 (to 35.2), Fee reduction, and add Sec. 35.3, Fee refunds, of Chapter 18, Zoning, of the Albemarle County Code. This ordinance would amend and reorganize the Zoning Ordinance's fee regulations and increase existing fees, impose new fees, and change but not necessarily increase other fees, for listed applications, permits, reviews, approvals, inspections and other services provided by the County in the administration of Chapter 18. Sec. 35.0 would be renumbered Sec. 35.1, Fees, and would be amended as follows: Application - Current Fee I Application - Proposed Fee Not to Exceed Zoning text amendments: $840 Zoning map amendments 1. For planned developments - under 50 acres - $1020 2. For planned developments - 50 or more acres - $1570 3. For all other zoning map amendments - under 50 acres - $1020 4. For all other zoning map amendments - 50 or more acres - $1570 5. Minor amendment to a zoning map amendment - $220 6. Deferral of action to a specific date - $35 7. Deferral of action indefinitely - $75 Special use permits: 1. Rural area division for the purpose of "family division" where all original 1980 development rights have been exhausted under "family division" - $220 2. Rural area divisions - $1240 3. Commercial use - $980 4. Industrial use - $1020 5. Private club /recreational facility - $1020 6. Mobile home park or subdivision - $980 7. Public utilities - $1020 8. Grade /fill in the flood plain - $870 9. Minor amendment to valid special use permit or a special use permit to allow minor expansion of a non - conforming use - $110 10. Extending special use permits - $70 11. Home Occupation -Class A - $13 Home Occupation -Class B - $440 12. For day care centers - six (6) to nine (9) children - $490 13. For day care centers - ten (10) or more children - $980 14. All other uses except signs - $980 15. Deferral of action to a specific date - $35 16. Deferral of action indefinitely - $75 Site plans Preliminary site development plan: 1. Residential - $1,190, plus $13.00 /unit. 2. Non - residential - $1,580, plus $13.00/1000 square feet. Final site development plan: 1. Approved administratively - $410 2. If reviewed by the commission before approval of preliminary site development plan - $1,130 3. If reviewed by the commission after approval of the preliminary site development plan - $790 4. For site development plan waiver - $270 5. For site development plan amendment: a) Minor - alterations to parking, circulation, building size, location -$95 b) Major - commission review - $270 6. Review of site development plan by the architectural review board - $200 7. Appeal of site development plan to the board of super visors - $240 8. Rehearing of site development plan by commission or board of supervisors - $190 9. Rejection by agent of incomplete site development plan: a) Rejected within ten days - $200 b) Suspended after site plan review - site plan fee shall not be refunded. $65 fee shall be required to reinstate project. Zoning text amendments: $1000 Zoning map amendments 1. Less than 50 acres; application and first resubmission: $2500 2. Less than 50 acres; each additional resubmission: $1250 3.50 acres or greater; application and first resubmission: $3500 4.50 acres or greater; each additional resubmission: $1750 5. Deferral of scheduled public hearing at applicant's request: $180 Special use permits: 1. Additional lots under section 10.5.2, public utilities, day care center, home occupation class B, to amend existing special use permit, or to extend existing special use permit; application and first resubmission: $1000 2. Additional lots under section 10.5.2, public utilities, day care center, home occupation class B, to amend existing special use permit, or to extend existing special use permit; each additional resubmission: $500 3. All other special use permits; application and first resubmission: $2000 4. All other special use permits; each additional resubmission: $1000 5. Deferral of scheduled public hearing at applicant's request: $180 6. Signs reviewed by the board of zoning appeals: See subsection 35.1(f) Site plans 1. Preliminary site plans; administrative review: $1200 plus $15 per dwelling unit and $0.015 per square foot of nonresidential structure 2. Preliminary site plans; planning commission review: $1800 plus $15 per dwelling unit and $0.015 per square foot of nonresidential structure 3. Final site plans; administrative review: $1500 4. Final site plans; planning commission review: $2000 5. Waiver of drawing of site plan under section 32.2: $1500 6. Site plan amendments under section 32.3.8 12 (minor): $500 7. All other site plan amendments (major): $1500 8. Appeals to the board of supervisors under section 32.4.2.7: $240 9. Reinstatement of review under section 32.4.2.1: $240 IO.Reinstatement of review under section 32.4.2.4: $80 11.Extension of period of validity: $475 12.Inspections pertaining to secured site plan improvements; per inspection: $280 13.Deferral of scheduled public meeting at applicant's request: $180 Other 1. Extension of approval of site plan - $45 2. Deferral of action to a specific date - $35 3. Deferral of action indefinitely - $75 4. Bond inspection for site plan, each inspection after the first bond estimate - $60 Matters considered by the Board of Zoning Appeals 1. Variances: $120 2. Appeals: $120 3. Special use permits for signs under section 4.15.5: $120 Matters considered by the Architectural Review Board None Matters considered by the zoning administrator or others 1. Official determinations regarding compliance - $75 2. Official determinations regarding development rights - $40 3. All other official determinations - $75 4. Zoning clearance for tourist lodging - $35 5. Zoning clearance for home occupation, class A: none 6. All other zoning clearances - $35 7. Sign permits; no ARB review required - $35 8. Sign permits; ARB review required - $75 Groundwater assessments 1. Tier 1 assessment under section 17 -401 - $50 2. Tier 3 assessment under section 17 -403 - $400 plus $25 per lot 3. Tier 4 assessment under section 17 -404 - $1000 Miscellaneous 1. Change in name of development - $25 2. Change in name of road - $20 3. Relief from condition of approval from commission or landscape waiver by agent - $180 4. Tier II personal wireless service facilities - $790 Notice The actual costs of any notice, to the extent that the cost exceeds the applicable fee Matters considered by the Board of Zoning Appeals 1. Variances: $500 2. Appeals: $240 3. Special use permits for signs under section 4.15.5: $500 Matters considered by the Architectural Review Board 1. For a site plan; per review by the ARB: $1000 (new) 2. For a building permit; per review by the ARB: $590 (new) 3. Amendment to approved certificate of appropriateness: $225 Matters considered by the zoning administrator or others 1. Official determinations regarding compliance: $185 2. Official determinations regarding development rights: $100 3. All other official determinations: $100 4. Zoning clearance for tourist lodging: $100 5. Zoning clearance for home occupation, class A: $25 (new) 6. Zoning clearance for temporary fundraising activities: No fee 6. All other zoning clearances: $50 7. Sign permits under section 4.15.4; no ARB review required: $25 8. Sign permits under section 4.15.4; ARB review required: $120 Groundwater assessments 1. Tier 1 assessment under section 17 -401: $50 2. Tier 3 assessment under section 17 -403: $510 3. Tier 4 assessment under section 17 -404: $1100 Miscellaneous 1. Change in name of development or change in name of street: $80 2. Relief from conditions of approval; modification or waiver of requirements: $425 3. Tier 11 personal wireless service facilities: $1820 Notice 1. Preparing and mailing or delivering up to fifty (50) notices: $200 plus the actual cost of first class postage (new) 2. Preparing and mailing or delivering, per notice more than fifty (50): $1 plus the actual cost of first class postage (new) 3. Published notice: actual cost (new) Sec. 35.1 would be renumbered Sec. 35.2 and its heading would be changed from "Fee reduction" to "Calculation of fees in special circumstances" and current regulations for calculating fees where applications for multiple related approvals are required for a project would be restated and clarified. Sec. 35.3 would be added to include what is currently in Sec. 35.1(c) to provide that an application fee shall be refunded if, after the fee is received, it is determined that the application for which the fee was received is not required. The proposed fees and fee increases are authorized by Virginia Code §§ 15.2- 2241(9) and 15.2- 2286(A)(6). The full text of the ordinance is available for examination by the public in the offices of the Clerk of the Board of Supervisors and in the Department of Community Development, County Office Building, 401 McIntire Road, Charlottesville, Virginia.