Loading...
HomeMy WebLinkAboutSP200800061 Legacy Document 2010-01-26 (2)AFtiilllil,; COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 June 17, 2009 Craig L. Slingluff Jr. 256 Woodlands Road Charlottesville, Va 22901 RE: SP2008 -00061 Slingluff Dock Dear Mr. Slingluff: On June 10, 2009, the Albemarle County Board of Supervisors took action on SP #200800061 to allow construction of a private floating dock on the South Fork Rivanna Reservoir on TMP 45 -6D1 and TMP 45- 67A in the Jack Jouett district. This special use permit was approved based on the following conditions: 1. There shall be no lighting within twenty -five (25) horizontal feet of the Reservoir, measured from the elevation of normal pool, which is Elevation 382 (North American Vertical Datum of 1988); 2. There shall be no removal of vegetation or earth disturbance with the two hundred (200) -foot stream buffer associated with the installation of the boat dock. The stream buffer is measured from the edge of the floodplain, which is Elevation 391; 3. Structures and improvements located in the two hundred (200) -foot stream buffer shall be limited to those shown on the Schematic of Dock Design and Schematic of Dock Design, Side View, including a set of up to five steps without railings located directly adjacent to the dock; and 4. Non - invasive vegetation shall be allowed to naturally regenerate in the buffer area between the normal pool elevation of the Reservoir (Elevation 382) and the elevation of the edge of the floodplain (Elevation 391), except for a pathway of not wider than ten (10) feet leading to the dock. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; and • approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term 'commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Sherri Proctor at 296 -5832. Sincerely, , V. V. Wayne limberg Director of Planning