June 17, 2009
Craig L. Slingluff Jr.
256 Woodlands Road
Charlottesville, Va 22901
RE: SP2008 -00061 Slingluff Dock
Dear Mr. Slingluff:
On June 10, 2009, the Albemarle County Board of Supervisors took action on SP #200800061 to allow
construction of a private floating dock on the South Fork Rivanna Reservoir on TMP 45 -6D1 and TMP 45-
67A in the Jack Jouett district. This special use permit was approved based on the following conditions:
1. There shall be no lighting within twenty -five (25) horizontal feet of the Reservoir, measured from
the elevation of normal pool, which is Elevation 382 (North American Vertical Datum of 1988);
2. There shall be no removal of vegetation or earth disturbance with the two hundred (200) -foot
stream buffer associated with the installation of the boat dock. The stream buffer is measured
from the edge of the floodplain, which is Elevation 391;
3. Structures and improvements located in the two hundred (200) -foot stream buffer shall be limited
to those shown on the Schematic of Dock Design and Schematic of Dock Design, Side View,
including a set of up to five steps without railings located directly adjacent to the dock; and
4. Non - invasive vegetation shall be allowed to naturally regenerate in the buffer area between the
normal pool elevation of the Reservoir (Elevation 382) and the elevation of the edge of the
floodplain (Elevation 391), except for a pathway of not wider than ten (10) feet leading to the
dock.
Please be advised that although the Albemarle County Board of Supervisors took action on the
project noted above, no uses on the property as approved above may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
• compliance with conditions of the SPECIAL USE PERMIT; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not commenced
within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the
permit terminated. The term 'commenced" means "construction of any structure necessary to the use of
the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to contact