Loading...
HomeMy WebLinkAboutSDP201000023 Legacy Document 2010-04-15COLLINS ENGINEERING March 8, 2010 Elizabeth Marotta Senior Planner Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902 `SOO E JEFFERSON ;CHARLOTTESVILLE'.VA 22.902 A34.293 3719 Rl-4 434 293'3719 FX www.aollins- ongineering.co'm RE: SDP - 2009 -48 Stonewater Townhomes Site Plan -Final Dear Elizabeth: Thank you for your comments dated June 29, 2009 on the above - referenced project. The following are responses to the items raised in your letter: Planning 1. The maximum acreage is listed in note #23 on T -1. 2. The conservation checklist has been completed and signed on sheet LL -1 3. The landscaping plan and quantities have been updated for consistency. Lee LL -1. 4. All landscaping is now within the project limits. See LL -1. 5. A driveway pavement section is included on S -2. 6. The trail detail and notes have been removed from this plan. 7. Storm drain and utility revisions are not included in this plan. Please note that a minor site plan amendment has also been submitted for Stonewater Subdivision which includes road and utility infrastructure revisions. 8. Driveway parking spaces meet the minimum required dimensions. Adequate sidewalk and planting strips are provided. 9. The project limits are now consistent with the Stonewater Subdivision Minor Site Plan Amendment submitted 3 -8 -10. 10. The sidewalk easement has been extended as indicated. Engineering 1. A site plan amendment has been submitted for the approved road plan to ensure consistency with the townhouse site plan. 2. n/a 3. A site plan amendment has been submitted for the approved road plan to ensure consistency with the townhouse site plan. 4. n/a 5. A site plan amendment has been submitted for the approved road plan to ensure consistency with the townhouse site plan. 6. The sidewalk and planting strip requirements have been met. Please contact me if you have any questions or require any further information. Sincerely, Scott Collins C,OLLINs rENGINEERING ( soo r= JEFFERSON CHARLOTTESVILLE VA 22902 434 293 3719PI-1, 434 293 371.9 FX wwwcoll in's-ongineering.com TRANSMITTAL ❑ FAX ❑ MAIL DELIVERY I TO: FROM: (e) / v i s COMPANY: DATE: 'a - lo FAX: TOTAL NO. OF PAGES INCLUDING COVER: PHONE NUMBER: SENDER'S PHONE NUMBER: 2-15-3-71 PROJECT/SUBJECT: 2kAl -nhr PLEASE FIND ENCLOSED: NO. COPIES DATE DESCRIPTION NOTES/ COMMENTS: RECEIVED BY: SIGNATURE DATE