HomeMy WebLinkAboutCLE201000104 Legacy Document 2010-06-25Zoning Compliance Analysis, Section 30.4 - Natural Resource Overlay District
30.4.02.1 - BY RIGHT
Within any NR district, uses may be permitted by right as for and
subject to the district regulations of the underlying zoning district.
In addition, there shall be permitted by right within any NR district
the following uses:
1. Except as otherwise provided in sections 10.2.1.18, 10.2.2.40 or
Our intent is to operate a stone
30.4.2.2, removal of soil, sand, gravel, stone or other minerals by
quarry. Excavation, stripping,
excavating, stripping, quarrying or other mining operation.
processing, and other related
(Amended 7 -6 -83)
activities shall occur within the
NR property as shown on the
Site Map.
2. Accessory uses to a use permitted by right such as blasting,
Accessory uses listed to the left
washing, grading, sorting,
shall take place in order to
properly operate the quarry
30.4.02.2 BY SPECIAL USE PERMIT
Not Applicable because we are
not requesting a Special Use
30.4.03 PERMIT REQUIRED
Please consider the letter
Prior to commencing any natural resource extraction activity within
accompanying this document as
any NR district, the operator of such activity shall obtain a permit
the formal request for a permit
therefor from the zoning administrator. Such permit shall be issued
from the zoning administrator.
upon filing with the zoning administrator of a plan of the proposed
Please see the attached
natural resource extractive activity, including all data sufficient to
documents for questions
ensure compliance with the provisions of this section. The
regarding the compliance with
applicant may comply herewith by the filing of a copy of any plan
the Zoning Ordinance. Feel free
of such proposed operation approved by the Virginia Department of
to contact David Willis of
Conservation and Economic Development filed pursuant to Title
Rockydale Quarries Corporation
45.1 of the Code, together with such additional data as the zoning
at (540)330 -4861.
administrator may require to ensure compliance with this section.
In addition, the applicant shall provide evidence satisfactory to the
zoning administrator that he has complied with the provisions of
Title 45.1 of the Code. Every such permit issued by the zoning
administrator shall be subject to annual review and shall be revoked
in the event that any permit issued for any such operation shall
expire or otherwise terminate in accordance with the requirements
of Title 45.1 of the Code or the regulations of the Virginia
Department of Conservation and Economic Development.
(Amended 4- 28 -82)
30.4.04 MINIMUM AREA REQUIREMENT—
The NR overlay district for this
ESTABLISHMENT OF DISTRICT
property is roughly 110.44 acres
The minimum area for the establishment of any NR overlay district
and exceeds the minimum
shall be twenty (20) acres.
requirements.
30.4.05 MAXIMUM PERCENTAGE LOT COVERAGE
The total NR property, parcels
All operations associated with the extraction of natural resources as
TM 45 -58, 45-60,45-61 is
well as the provision of parking areas and access roads and
110.44 acres. The current area
driveways shall not occupy more than eighty (80) percent of
associated with the extraction of
the total site.
natural resources, per our active
mining permit with the DMME,
is 22.41 acres, or 20.3% of the
site. The operation shall not
exceed 80% of the site.
30.4.06 YARD AND BUILDING LOCATIONS
We plan to erect permanent
Minimum yard dimensions and building location requirements shall
structures associated with the
be as specified in the underlying zoning district regulations except
NR extraction use. Such as a
that no natural resource extraction operation, including associated
maintenance shop, scale house,
uses, and structures containing any such use shall be located less
office, and structures associated
than one hundred (100) feet from any public road right -of -way or
with aggregate processing.
adjoining property within any residential district; except that no
There is a 100' buffer indicated
such operation, uses or structure shall be located within two
on the operational plan along the
hundred (200) feet of any contiguous property subdivided into
perimeter of the NR property.
residential lots of one (1) acre or less not under the ownership or
The current active mining area is
control of the applicant nor within two hundred (200) feet of any
over 200' away from all
occupied dwelling.
residential lots less than 1 acre.
30.4.07 FENCING
Please see the attached site map
Any natural resource extraction operation shall be subject to such
for location of fencing
fencing requirements as may be deemed necessary by the zoning
administrator for the protection of the public safety. In particular,
fencing shall be provided in the cases hereinafter described by a
substantial fence erected at least sixty (60) feet outside the limits
thereof, such fence being at least five (5) feet in height and so
designed as effectively to control access thereto from locations
ordinarily open to the general public, including, but not limited to,
locked gates at all access points.
30.4.7.1 The top of all open excavations having a depth often (10)
Please see attached map
feet or more, which will create a slope of forty -five (45) degrees or
more from the horizontal and which shall remain for a period of
more than twenty -four (24) hours;
30.4.7.2 Any collection of water of five (5) feet or more in depth
Please see attached map
and occupying an area of two hundred (200) square feet or more,
which shall remain for at least one (1) consecutive month.
30.4.08 LATERAL SUPPORT
The quarry shall be operated
All operations shall be conducted in a safe manner with respect to
safely under the DMME and
the likelihood of hazard to persons, physical damage to adjacent
MSHA regulations
land or improvements and damage to any public road by
reason of slides, sinking or collapse.
30.4.09 ROADSIDE LANDSCAPING, SCREENING
There is a 50' buffer berm along
Existing trees and ground cover along public road frontage shall be
the property fronting Route 643
preserved, maintained and supplemented by selective cutting,
to screen the operations. This
transplanting and addition of new trees, shrubs and other
berm was created during earlier
ground cover for the depth of any roadside setback. The type,
operations of the quarry and will
design and spacing of such plantings shall be approved by the
be extended along Route 643.
zoning administrator and shall be so designed as to lessen the visual
Natural vegetation is already
impact of the activity from any adjacent public road, and to
densely established on this berm.
minimize the noise and dust resulting from such operation. In any
case in which roadside planting is not practical, the zoning
administrator may permit the substitution of other screening devices
such as fences, berms, walls and the like which are adequate to
accomplish the same purpose.
30.4.10 HOURS OF OPERATION
We will follow the operational
Operations involving power equipment of an industrial type shall
limits established in this section.
be limited to the hours of 7:00 a.m. to midnight except in cases of a
public emergency as determined by the director of emergency
services for the county. Blasting operations shall be restricted to
Monday through Friday between 8:00 a.m. and 5:00 p.m.
30.4.11 PUBLIC IMPROVEMENTS, INTERNAL ROADS
30.4.11.1 Operations as proposed shall not generate unusual traffic
There shall be no unusual traffic
hazards or the need for improvements to public streets or other
hazards and the existing
public facilities at public expense.
infrastructure is adequate to
handle any traffic generated by
quarry operations.
30.4.11.2 All internal access roads shall be surfaced with
Please see the attached site map.
bituminous or other dust free surface for a distance of three hundred
(300) feet from any public road.
30.4.12 TRANSPORTATION OF EXCAVATED MATERIALS
Vehicles used to transport
All vehicles used to transport excavated materials shall be loaded
excavated materials will pass
in such manner that the material cannot be unintentionally
through a wash station equipped
discharged from the vehicle. All such vehicles shall be cleaned of
with spray bars that will spray
all material not in the load -bed prior to entering onto any public
the top, sides, front, and rear of
road.
the vehicle with high pressure
water to remove all material not
in the load -bed. They will also
pass through a wheel wash that
will remove loose material from
the tires.
30.4.13 COLLECTIONS OF WATER
Stagnant pools will be either
Creation of undrained pockets and stagnant pools of water shall be
sprayed or removed during the
avoided to the maximum extent reasonably practicable, and all such
regular maintenance of the site.
undrained pockets and stagnant pools resulting from surface
drainage shall be sprayed in accordance with requirements of the
Virginia Department of Health to eliminate breeding places for
mosquitoes and other insects.
30.4.14 PERFORMANCE STANDARDS
In addition to any other provision of law, the following
performance standards shall apply to any use permitted hereby:
1. No blasting shall be permitted except in conjunction with a
Since this is a stone quarry
permit for a stone quarrying operation;
operation, blasting shall only be
performed in conjunction with
stone quarrying.
2. Ground vibration from surface blasting shall not exceed the
Blasting will conform with
limits set forth in 4 VAC 25 -40 -880, as measured in the manner set
applicable state and federal
forth therein (Amended 6- 14 -00);
standards.
3. Airblast resulting from surface blasting shall not exceed 129
Blasting will conform with
decibels at any occupied structure not on the subject property.
applicable state and federal
(Amended 6- 14 -00)
standards.
30.4.15 OFF - STREET PARKING
Ample parking will be provided
Off - street parking areas adequate for all employees' vehicles and
in the "Contractor's Yard" area as
used in any extractive operation shall be provided.
shown in the map.