Loading...
HomeMy WebLinkAboutSDP201000046 Review Comments Major Amendment, Preliminary Plan 2010-07-06 (2)AN A ;� Im- Sr��R�Y COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 =5832 . Fax (434) 972 -4126 July 6,.20 10 William Moore Balzer and Associates 1561 Commerce Road Verona, VA 24482 RE: SDP-w2010-46 Kingdom Hall Major Amendment Dear Sir: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Current Development (Planner) Albemarle County Division of Current Development (Engineer) Albemarle County Service Authority (ACSA) Albemarle County Division of Planning (E911)- no objection Albemarle County Division of Planning Albemarle County Department of Fire Rescue Albemarle County Division of Inspections Albemarle County Division of Planning (Architectural Review Board) pending 812110 meeting Virginia Department of Transportation (VDOT)- pending Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that .could affect approval of the proposed project. :Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to, make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by July 19, 2010. Failure to submit this information by this . date will result in suspension of the review schedule. Review will resume when revisions are submitted along with areinstatement fee of $65. Please contact me at your earliest convenience i f you have questions or require additional information. Sincerely, Elizabeth M. Marotta, Senior Planner Current Development $� of 0 �'jRGIN1P County of Albemarle Department of Community Development Memorandum To: William Moore, Balzer and Associates, Inc. I—;rw/o'm: er: Morgan Davis, East Congregation of Jehovah's Witnesses Elizabeth Marotta, Senior Planner Division: .Zoning & Current Development Date: July 1, 2010 -Subject: SDP 2010 -46- Charlottesville Kingdom Hall Major Amendment The Planner for the Current .Development Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following.items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) [Each comment is preceded by the applicable reference to the Albemarle County Code.] [SP2009 -29] Plan must be in conformance with the Concept Plan (dated 11 -16- 09) and conditions approved with the Special Use Permit (June 11, 2010). COMMENT: SP condition #3 indicates the sidewalk easement shall be reserved for future dedication; therefore please amend sidewalk easement callout to say "Proposed sidewalk easement and 5' right -of -way to be dedicated upon demand of the County." 2. [32.5.6.a] Name of development: COMMENT.: Add to the cover sheet and/or title blocks that this is "Major Site Plan Amendment SDP2010 -46" 3. [32.5.6.a]:COMMENT: Provide magisterial district (Scottsville) on the cover sheet. 4. [32:5.6.a] Descriptions of all variances, zoning proffers, and bonus factors: COMMENT: Conditions of SP2009 29 must be provided on the plan. Typically, these are added as a list to the cover sheet or notes /details sheet. 5. [32.5.6.a] Source of survey /topography: ;COIV MENT: Provide dates for survey, topography, and tree location. 6. [32.5.6.a] Datum reference: ,COMMENT: Benchmark symbol on cover sheet Cl does not match that on Sheet C4. Please revise so that Legend matches symbol used in the plans. 7. [32.5.6.a] Total number of sheets: COMMENT: While not required for approval, please add total number of sheets to each sheet, as in "1115" or "1 of 15 ". This is very helpful when/if the sheets get separated from the set. 8. [32.5.6.a] Minimum setback lines: COMMENT: While setbacks are drawn on C4 etc., please list minimum setbacks as a note on the cover sheet. 9. [32.5.6.d] Critical slopes: - COMMENT: On the cover sheet, indicate critical slopes waiver was approved. Then, on the site plan, indicate the critical slopes that were approved for disturbance in the waiver. 10. COMMENT: Remove sign height note; this will be reviewed at the time the sign permit is reviewed. 11. [32.6.6.f] Signature panel COMMENT: Signature panel is not required; this is an amendment and will get an approval stamp. 12. [32.5.6.p, 32.6.61] Landscape Plan: COMMENT: Is Note #10 on the cover sheet C1 referring to "interior parking lot landscaping ?" If so, please change the term "green space" to "interior parking lot landscaping" so that it is more clear what .code requirements are being met. a. If this is discussing interior parking lot landscaping, then the calculation should be 5% of paved parking and vehicular circulation areas. [32.5.6.n.] Please confirm parking and vehicular circulation areas are accurate, i.e. that the 23,600 stated in Note #11 is correct, as opposed to the 21,095 stated in Note #10. Both figures should match. b. If your calculations are based on something different, please explain in your response letter, or make adjustments on the sheet as necessary. 13. [32.5.6.p, 32.6.61] Landscape plan: Conservation Checklist must be updated. Please review checklist to make sure it is accurate, and re -sign and date. 14. [32.5.6.p,.32.6.6.i] Landscape plan: "JS" should probably be called out as "ZS" in the drawing. Also, identify 4 plants to the immediate east of the proposed dumpster. Please revise either landscape schedule or the plan. accordingly. a.. Trees are proposed very close to water and power lines. Please place trees farther away from the utilities to allow room for utility work and root growth. b. Waterline linetype is not provided in the legend on Cl. Please add it to the legend, or revise linetype. 15. [32.6.6J] Lighting plan: The lighting plan must conform to Chapter 18 Section 4.17. Therefore, provide cut - sheets on the plan for all fixtures proposed. (All fixtures must be full- cutoff.) 16. [32.6.6 j] Lighting plan: Lighting is not permitted to be over 0:5 footcandle at the property line. Please address 0.8 at the northern property line (entrance). 17. [32.6.6.j] Lighting Plan: Albemarle County Code requires a LLF of 1.0. Please revise data and photometrics accordingly. 18. [32.5.6.n] Trash containers: Be sure to label details on Sheet C10 consistently 2 with Legend on C4. For example, C4 calls "T" a "trash enclosure ", but on C10 there is no "trash enclosure." I assume it is the "fence screen detail," but for clarity purposes, either provide a "T" with the detail on C 10, or change the name to match what it is called out on C4. a. Similarly, indicate under "C" and "H" and any other details in the Legend on C4 where exactly that detail can be found (C10). 19., COMMENT: ACSA approval is required prior to approval of this amendment. However, before ACSA can issue their approval, Rivanna Water and Sewer Authority (RWSA) must approve the plans. Unless otherwise directed by ACSA, please coordinate directly with both ACSA and RWSA to obtain ACSA approval. RWSA contact is Justin Weiler, (434)977 -2970 x206. His email is Jweiler@rivanna.org. 20. COMMENT: This project proposes private septic; Health Department approval/ confirmation of system proposed is required in writing. If it has already been obtained, please forward a copy of the approval to me for verification. 21.�COMMENT: ARB approval is required. ARB meeting is set for August 2,20 10, after which comments will be received. 22. COMMENT: Inspections Division approval is required. See comment in County View dated 6/21/10, and included in the SRC package 7/8/10. 23. COMMENT: Engineering approval is required. See Comments dated July 1, .2010, available online on County View, and included in the 7/8/10 SRC package. 24. COMMENT: VDOT approval is required. Comments are -pending. Please contact Elizabeth Marotta, Senior Planner at the Department of Community Development 296 -5832 ext. 3432 for further information. OF Al, � IRGINIP COUNTY OF ALBEMARLE Department of Community Development ,401 McIntire Road, Room 227 Charlottesville, Virginia :22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Kingdom Hall of the Jehovah's Witness [SDP201000046, WP0201000034] Plan preparer: William Moore [wmoore @balzer.cc] Owner or rep.: East Congregation of Jehovah's Witnesses; Morgan Davis ETAL TRS Plan received date: 15 June 2010 Date of comments: 1 July 2010 Reviewer: John P. Diez — Current Development - Engineering Technician A. Final site plan (SDP201000046) 1. Please provide the application number of the previously approved site plan that this plan is amending. 2. All proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plan. 3. All entrances must have VDOT designations (PE -1, CG -9a, etc.) 4. VDOT approval must be obtained for any plan affecting right -of -way. 5. Please clarify arrow stripping in the parking area. B. Stormwater Management Plan (WP0201000034). 6. Please provide a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities. 7. Please label STR #3 and #4 on the profile. 8. Please replace the sidewalk turn -down with a CG 72 and shift 6" out to allow the minimum 5' width of sidewalk. 9. Please show all utility crossings on the profiles. 10. Minimum pipe sizes into and out of the facility must be 15" diameter for maintenance. 11. It appears that the some of the runoff in post - development is now flowing to a SWM facility. The run -off from DA #2 must be captured for stormwater management treatment. 12. With the added impervious from DA #2, please revise the size for the biofilter. If the facility is to treat 50% removal rate, then the. first 0.5" of runoff is to be treated. Please size the biofilter using the 2.5% of the total impervious area. In addition: - Please provide 2.5' of sand /soil media. - The floor of the biofilter must be flat (0% slope) - Please provide l'— 1.5' of stone drain in geotech fabric under media, with 6" perforated pipe to daylight. - Please provide 1' ponding depth. Please refer to the SWMH Section 3.11A and 5 -6.1 and the Design Standards. Manual for specs. and details. Engineering Review Comments Page 2 of 2 C. Erosion Control Plan (WPO201000034) 13. Please provide a stockpile location. 14. Please provide a staging and parking area. 15. Please show on the detail or plan that the wet storage side slope is 1:1 or flatter. 16. Please extend the diversion dike towards the northeast side of the proposed building. 17. Please provide a construction entrance prior to #6 of the construction sequence. Protection must be provided for all stages of construction. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:OOpm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434- 296 -5832 or apflaum @albemarle.ork to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: idiez@albemarle.org. a:i €?i( iiyv' to ..l;1;}:3<}ws "'Et1i;.t:1f ".y�:P til?I(t004ihirAgdoalJ-tsi ti<a,x? {:;.�:�i::i i .;; ,sti � .1.i't:)....1 Paz -l; tzIA?AIA'x' a :Service Auth`rity ��� ♦conSQ��n� 'TO: Elizabeth Marotta PROM: Gary Whelan, Civil Engineer 'DATE: June.25, .2010 'RE: Site Plan Technical Review for: Kingdom Hall of the Jehovah's Witnesses SDP201000046 TM 76 -51 The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A .20 inch water line is located approximately 50' distant. 3. Fire-flowftom, nearest public hydrant, located distant from-this site plan, is Gpm + at 20 psi residual. J .4. An 8 inch sewer line is located approximately 400' distant. 5. An Industrial Waste Ordinance survey form must be completed. J 6. No improvements or obstructions shall be placed within existing orfuture easements. 7. and plans are currently under review. 8. and plans have been -received and approved. J 9. No plans are required. '10. Final and plans are required for our review.and approval prior to granting tentative approval. 1.1. =Final site plan may /may-not be�signed. '12. 'RWSA approval for water and /or sewer connections. -13. City of Charlottesville approval-for sewer. ✓ Comments: ACSA records indicate a 1" water meter. If demand requires a larger water meter a new tap might be required. RWSA must approve all new water connections-to-their pipes. -Backflow prevention is required and should be indicated on-the utility plan. The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows 168 Spotnap Road Charlottesville VA 22911 Tel (434) 977 -4511 • Fax (434) 979 -0698 www. servicea uthoriy. org Memo& County :. :'Service .Auth6Hty Serving 6 Conserving — easements - expected water demands 168 Spotnap Road • Charlottesville VA 22911 • Tel (434) 977 -4511 Fax (434) 979 -0698 www.serviceauthoriy.org Application #: SDP.201000046 Short Review Comments Project Name:1 Kingdom Hall of The Jehova's Witnesses -- Major Major Amendment Date Completed: 06/24/2010 Reviewer: Andrew Slack E911 Review Status: Approved Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: %PPROVED. 07/02/2010 Claudette Grant Planning Requested Changes Fhis is a reminder that the applicant needs to remember to show Condition #3 on the final site plan. 06/23/2010 James Barber Fire Rescue No Objection please indicate the location of fire hydrants. Hydrants must be located within 400 feet of the building )y way of a prepared travel way. 06/21/2010 Jay Schlothauer Inspections Requested Changes Based on plans dated June 11, 2010. Relocate the three barrier -free parking spaces to the eastern -most row of parking (adjacent to the -urb and gutter), as close as practicable to the main building entrance. 06/29/2010 Margaret Maliszewski ARB Requested Changes phis plan is scheduled for review by the ARB on August.2, 2010. Comments will be provided after thal neeting. Page: 1.00 County of Albemarle Printed On: Tuesday, July 06, 2010