Loading...
HomeMy WebLinkAboutZMA200700013 Correspondence 2010-08-30Claudette Grant From: Gary Whelan [gwhelan @serviceauthority.org] Sent: Monday, May 24, 2010 4:34 PM To: Claudette Grant Cc: Justin Weiler Subject: ZMA200700013 Fontaine Research Park Claudette, The Service Authority's previous comments concerning capacity issues and improvements are still valid. These and other technical engineering issues can be addressed during the site plan stages. The ACSA takes no exception to the ZMA. Gary K - , . Claudette Grant From: Justin Weiler Dweiler @rivanna.org] Sent: Friday, April 16, 2010 11:18 AM To: Claudette Grant; 'Gary Whelan' Cc: Jennifer Whitaker, Michelle S. Simpson, PE Subject: RE: Fontaine Research Park Claudette, On August 6th, 2009, RWSA received a revised version of the sewer capacity report by Dewberry and Davis. We sent comments for this report to Dewberry and Davis on August 25th, 2009. Since then we have not heard anything and we are still waiting for the report to be revised and resubmitted. Since RWSA and ACSA still do not have a final report, RWSA's previous comments are still accurate. Please let me know if you need anything else. Thanks. Justin Justin Weiler, E.I.T. Civil Engineer Rivanna Water and Sewer Authority 695 Moores Creek Lane Charlottesville, VA 22902 Phone: 434.977.2970 ext.206 Fax: 434.295.1146 From: Claudette Grant [mailto:cgrant @albemarle.org] Sent: Wednesday, April 14, 2010 12:32 PM To: Gary Whelan; Justin Weiler Subject: Fontaine Research Park Gary and Justin, I am preparing comments to be sent to the applicant regarding the subject project. Gary, I did receive your comments dated March 3151 and saw that you commented on the following issues: 1) RWSA sewer capacity issues with the Morey Creek line. 2) We are still waiting on a sewer capacity report. 3) This will require RWSA capacity certification and 4) that future sanitary sewer upgrades are necessary. The following are the last comments we sent to the applicant on July 2, 2009. Are they still accurate or have you had additional communication with the applicant and /or consultant? ACSA: According to the Service Authority, your consultant, Dewberry & Davis has been working on an extensive sewer capacity report for the rezoning, which both the ACSA and RWSA were reviewing. ACSA has looked at the report twice and given comments to the consultant but have yet to see the final report with the final recommendations. Their last comments were provided to the consultant via email on July 25, 2008. RWSA had issues with one of their lines not being of sufficient size to handle the additional capacity but there were other comments from them as well. The ACSA had capacity issues for a couple of runs of sewer within the research park itself: wherein the existing lines could not handle the peak flow at build - out given the usage projections supplied in the report. RWSA: RWSA has been reviewing and commenting on a report by Dewberry and Davis regarding the projected sewer flows for the rezoning but has not received a revised report based on their latest comments which were sent on 7/18/08. • % r % RWSA believes that the applicant will need to, at a minimum, upgrade an offsite portion of existing RWSA 8" sewer so that it can handle the projected sewer flows. RWSA will need to review the final report in order to determine all impacts to our sewer facilities. This project will also require a flow acceptance letter to be issued by RWSA to ACSA for the additional sewer- flows. Thank you so much for your time. Claudette Grant Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 -4596 (434) 296 -5832, Ext. 3250 Fax: (434) 972 -4126 Claudette Grant From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Friday, May 21, 2010 2:55 PM To: Claudette Grant Subject: ZMA- 2007 -00013 Fontaine Research Park Claudette, The below comments sent for the Fontaine Research Park have not yet been resolved to the satisfaction of VDOT with the latest submission of the rezoning request. Please let me know if you have any questions. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 -293 -0011 Ext. 120 Le 1.denunzio vdot.virginia.aov From: DeNunzio, Joel D., P.E. Sent: Monday, April 05, 2010 1:57 PM To: Claudette Grant Cc: Shiley, Matthew, PE; Kulkarni, Vidyadhar (Vijay), PE, PTOE Subject: ZMA- 2007 -00013 Fontaine Research Park ZMA- 2007 -00013 Fontaine Research Park Claudette, VDOT Northwest Regional Operations Traffic Engineers have reviewed the re- zoning request and traffic models and have the following comments: 1. In addition to the proposed and proffered signal at the southbound ramps at Route 29 and Fontaine Ave, VDOT Traffic Engineers believe a signal may be warranted at the northbound ramps on Fontaine Ave to Route 29 due to the traffic from the development. 2. The developer should submit a signal warrant analysis at 75% build out for a signal at the northbound ramps. If the analysis shows that a signal is warranted at the northbound ramps by the development traffic, the developer should fund the design and construction of the signal. 3. The two options for the intersection configuration at the Fontaine/ route 29 southbound ramp are fine and the design can be determined during the site plan phase. If you have any questions, please contact me. Thanks,