Loading...
HomeMy WebLinkAboutSDP201000078 Legacy Document 2010-10-28Elizabeth Marotta From: Elizabeth Marotta Sent: Thursday, October 28, 2010 2:45 PM To: kirsten @collins - engineering.com Subject: Hollymeade TC Apts- Final, Planning Commentsl Attachments: CD1_emm_comments_sdp10- 78.pdf; Site Plan Final Comments Cover.pdf Kirsten, Town Center Apts, SDP10 -78 comments from Planning are attached. As discussed over the phone, there was a limit to how much I could review because required information is missing. Usually with final site plans we send the first round of comments out as a package with comments from everyone. I have attached the cover sheet that we use for that, but please note that Engineering, VDOT, and Inspections reviews are pending, and ACSA comments were that you need to coordinate with them directly, so there really isn't a package to attach. Feel free to call me if you have any questions about the comments or the process at this point. Elizabeth M. Marotta Senior Planner County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 (434) 296 -5832 Ext. 3432