Loading...
HomeMy WebLinkAboutSP200900034 Approval - County 2010-11-12COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 12, 2010 NP Engineering 1850 Browns Gap Turnpike Charlottesville VA 22901 RE: SP200900034 RE- STORE'N STATION Tax Map 55B Parcel 1 Dear NP Engineering: On November 3, 2010, the Albemarle County Board of Supervisors took action on SP #200800056 to allow use of more than 400 gallons of groundwater per site -acre per day for convenience store on Tax Map 55B, Parcel 1 in the White Hall District. This special use permit was approved based on the following conditions: 1. The applicant shall install and maintain a meter on the well head to monitor water consumption. Prior to installation, the model of the meter shall be subject to approval by the Zoning Administrator in conjunction with the County Engineer. Results of daily water consumption shall be made available within forty -eight (48) hours of a request from the Zoning Administrator; 2. Water consumption from all wells on site shall not exceed one thousand six hundred twenty -five (1,625) gallons per day in the aggregate; 3. The applicant shall install and maintain a tamper - proof, flow restriction device limiting water flow to not more than one thousand six hundred twenty -five (1,625) gallons per day. Prior to installation, the model of the flow restriction device shall be subject to approval by the Zoning Administrator in conjunction with the County Engineer; 4. The total building footprint square footage shall not exceed three thousand (3,000) square feet; 5. The hours of business operation shall not exceed sixteen (16) hours per day; 6. There shall be not more than seven (7) pump stations and twelve (12) nozzle dispensers, with not more than eight (8) nozzles for four (4) pump stations for gasoline (or equivalent fuel), with not more than two (2) nozzles for one (1) pump station for diesel fuel (or equivalent fuel), with not more than one (1) nozzle for one (1) pump station for off -road diesel fuel, and with not more than one (1) nozzle for one (1) pump station for kerosene fuel ; 7. If rainwater is collected from roof tops of the pump station canopies or the building, it shall be stored in a lined underground storage tank and utilized for on -site landscaping purposes only; 8. Overnight customer parking on -site shall not be permitted between the hours of 12:30 a.m. and 4:30 a.m. The applicant shall post signs indicating no such overnight parking in such places designated by the Site Plan Agent as a condition of final site plan approval; and, 9. Development of the site shall be in general accord with the submitted preliminary site plan dated December 6, 2009. Permitted modifications may include those required by the Architectural Review Board, those necessary to satisfy the conditions of this special use permit, and additional landscaping /screening approved by the Site Plan Agent. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with conditions of the SPECIAL USE PERMIT; • approval of and compliance with a SITE PLAN amendment; and • approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which this special use permit is issued is not commenced within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above -noted action, please do not hesitate to contact Ron Higgins at 296 -5832. Sincerely, Summer Frederick Senior Planner Current Development Division cc: Jeffries II LLC PO BOX 910 Crozet VA 22932 Email CC: Elise Hackett, GDS Johnathan Newberry, Zoning