HomeMy WebLinkAboutSP200900034 Approval - County 2010-11-12COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
November 12, 2010
NP Engineering
1850 Browns Gap Turnpike
Charlottesville VA 22901
RE: SP200900034 RE- STORE'N STATION
Tax Map 55B Parcel 1
Dear NP Engineering:
On November 3, 2010, the Albemarle County Board of Supervisors took action on SP #200800056 to
allow use of more than 400 gallons of groundwater per site -acre per day for convenience store on Tax
Map 55B, Parcel 1 in the White Hall District. This special use permit was approved based on the
following conditions:
1. The applicant shall install and maintain a meter on the well head to monitor water consumption.
Prior to installation, the model of the meter shall be subject to approval by the Zoning
Administrator in conjunction with the County Engineer. Results of daily water consumption shall
be made available within forty -eight (48) hours of a request from the Zoning Administrator;
2. Water consumption from all wells on site shall not exceed one thousand six hundred twenty -five
(1,625) gallons per day in the aggregate;
3. The applicant shall install and maintain a tamper - proof, flow restriction device limiting water flow
to not more than one thousand six hundred twenty -five (1,625) gallons per day. Prior to
installation, the model of the flow restriction device shall be subject to approval by the Zoning
Administrator in conjunction with the County Engineer;
4. The total building footprint square footage shall not exceed three thousand (3,000) square feet;
5. The hours of business operation shall not exceed sixteen (16) hours per day;
6. There shall be not more than seven (7) pump stations and twelve (12) nozzle dispensers, with not
more than eight (8) nozzles for four (4) pump stations for gasoline (or equivalent fuel), with not
more than two (2) nozzles for one (1) pump station for diesel fuel (or equivalent fuel), with not
more than one (1) nozzle for one (1) pump station for off -road diesel fuel, and with not more than
one (1) nozzle for one (1) pump station for kerosene fuel ;
7. If rainwater is collected from roof tops of the pump station canopies or the building, it shall be
stored in a lined underground storage tank and utilized for on -site landscaping purposes only;
8. Overnight customer parking on -site shall not be permitted between the hours of 12:30 a.m. and
4:30 a.m. The applicant shall post signs indicating no such overnight parking in such places
designated by the Site Plan Agent as a condition of final site plan approval; and,
9. Development of the site shall be in general accord with the submitted preliminary site plan dated
December 6, 2009. Permitted modifications may include those required by the Architectural
Review Board, those necessary to satisfy the conditions of this special use permit, and additional
landscaping /screening approved by the Site Plan Agent.
Please be advised that although the Albemarle County Board of Supervisors took action on the
project noted above, no uses on the property as approved above may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN amendment; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not commenced
within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the
permit terminated. The term "commenced" means "construction of any structure necessary to the use of
the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to contact
Ron Higgins at 296 -5832.
Sincerely,
Summer Frederick
Senior Planner
Current Development Division
cc: Jeffries II LLC
PO BOX 910
Crozet VA 22932
Email CC: Elise Hackett, GDS
Johnathan Newberry, Zoning