PROFFER FORM
Date: July 23, 2010
ZMA # 2008 -003 Albemarle Place
Tax Map and Parcel Numbers: 061WO- 03- 00- 019AO, 061WO- 03- 00- 019BO, 061WO- 03 -00-
02300, 061WO- 03 -00- 02400, and 61WO -03 -00 -02500
64.694 Acres zoned Neighborhood Model District (NMD), and 0.3404 acres to be rezoned
from Commercial (C -1) to Neighborhood Model District (NMD)
Albemarle Place EAAP, LLC, a Delaware limited liability company, is the fee simple owner (the
"Owner ") of tax map parcels 061 WO- 03- 00- 019AO, 061 WO- 03- 00- 019BO, 061 WO- 03 -00- 02300,
061 WO- 03 -00- 02400, and 061 WO -03 -00 -02500 (collectively, the "Property "), which is the
subject of zoning map amendment application number ZMA 2008 -003 known as "Albemarle
Place Amendment."
Pursuant to Section 33.3 of the Albemarle County Zoning Ordinance, the Owner hereby
voluntarily proffers the conditions listed in this proffer statement, which shall be applied to the
Property if the rezoning is approved by Albemarle County. These conditions are proffered as
part of the rezoning and it is acknowledged that the conditions are reasonable.
The Albemarle Place project was originally approved by the County Board of Supervisors on
October 22, 2003 as ZMA 2001 -007, along with proffers from the prior owner dated October 22,
2003, and a Code of Development prepared by The Cox Company dated October 15, 2003 (with
Exhibit A to the Code of Development last revised July 8, 2010) (the "Code of Development').
The Code of Development included an application plan (the "Application Plan "). The
improvements proposed for the Property are collectively referred to as the "Project."
The term "Owner" as referenced herein shall include within its meaning the owner of record and
successors in interest. The term "Application Plan" refers to Exhibit A. The term "Code of
Development' refers to Exhibit B. These proffers amend and supersede the proffers accepted in
conjunction with the approval of ZMA 2001 -007.
The headings of the proffers set forth below have been prepared for convenience or reference
only and shall not control or affect the meaning or be taken as an interpretation of any provisions
of the proffers,
1. Phasing of Albemarle Place Improvements: The Owner shall phase development of the
Project as follows:
A. Phase 1: Phase 1 of the Project shall be composed of Blocks A, B, C and D as shown on
the Application Plan, and as shown in more detail on Exhibit A -1 attached hereto ( "Phase
1 "), and shall include street and utility improvements to serve the planned building
improvements contained within Phase 1. As part of Phase 1, the Owner shall design and
Original Proffer:
Amendment: X
construct Albemarle Place Boulevard (also known as Fourth Street/Cedar Hill Road)
( "Albemarle Place Boulevard ") from Hydraulic Road to the point where Albemarle Place
Boulevard connects with the new planned western entrance to the Sperry Marine facility in
the location shown on the Application Plan, and as shown in more detail on Exhibit A -1.
This first phase of Albemarle Place Boulevard shall include all supporting utility
infrastructure on such street, and shall be completed prior to issuance of a final certificate of
occupancy for any buildings within Blocks A, B, C and D. Construction of the first phase of
Albemarle Place Boulevard shall be deemed complete when it is constructed in conformance
with the plans approved by the Virginia Department of Transportation ( "VDOT ") and the
County Engineer has approved it for vehicular travel. No more than three hundred seventy
thousand (370,000) square feet of commercial space and one hundred seventy (170) dwelling
units may be constructed within the Project until the remainder of Albemarle Place
Boulevard is constructed to the new planned intersection with U.S. Route 29 as shown on the
Application Plan. Notwithstanding anything to the contrary contained in this Paragraph IA,
the Owner shall be permitted to utilize portions of the Phase 2 land (as shown on Exhibit 1-
A) for the installation of infrastructure to serve the Phase 1 building improvements to be
constructed in Blocks A, B, C and D.
B. Phase 2: Phase 2 of the Project shall be composed of Blocks E, F and G as shown on the
Application Plan and as shown in more detail on Exhibit A -1 ( "Phase 2 "), and shall include
street and utility improvements to serve the planned building improvements contained within
Phase 2. As part of Phase 2, the Owner shall design and construct Albemarle Place
Boulevard from the point where it connects with the new planned western entrance to the
Sperry Marine facility north and east through Blocks E, F and G to the new planned
intersection with U. S. Route 29 as shown on the Application Plan and as shown in more
detail on Exhibit A -1. This second phase of Albemarle Place Boulevard shall include all
supporting utility infrastructure on such street and shall be completed prior to issuance of a
final certificate of occupancy for any buildings within Blocks E, F and G. Construction of
the second phase of Albemarle Place Boulevard shall be deemed complete when it is
constructed in conformance with the plans approved by VDOT and the County Engineer has
approved it for vehicular travel. Notwithstanding anything to the contrary contained in this
Paragraph 1B, the Owner shall be permitted to utilize portions of the Phase 2 land (as shown
on Exhibit 1 -A) for the installation of infrastructure to serve the Phase 1 building
improvements to be constructed in Blocks A, B, C and D.
C. Landscape improvements and associated streetscape improvements to serve the planned
building improvements contained within each block shall be reviewed at the time of final site
plan review for each block. The Project shall have a consistently designed and planted
streetscape along Route 29 and Hydraulic Road.
2. Community Development Authority Participation: Upon request by the County, the
Owner shall petition for and consent to all tax map parcels used for non - residential purposes
participating in a Community Development Authority ( "CDA ") established pursuant to
Section 15.2 -4142, et seq, of the Code of Virginia ( "Code') to be created for the purpose of
implementing Route 29 regional transportation improvements, including but not limited to
transportation improvements within the "Super Block" (the geographical area bounded by
Original Proffer:
Amendment: X
Route 29, Hydraulic Road, Commonwealth Drive, and Greenbrier Drive) and intersectional
improvements associated therewith.
3. Cash Proffer for Route 29 Regional Transportation: The Owner will make a cash
contribution to the County for the MPO/29H250 Phase 2 Route 29 regional transportation
study in the amount of One Hundred Thousand Dollars ($100,000.00). The cash contribution
shall be made by the Owner within thirty (30) days upon request by the County. This proffer
has been satisfied.
4. Cash Proffer for City of Charlottesville Traffic Calming Improvements: The Owner
shall contribute Ten Thousand Dollars ($10,000.00) to the City of Charlottesville for the
construction by the City of traffic calming improvements on Swanson Road, Cedar Hill Road
and other City streets intersecting Hydraulic Road in the vicinity of Albemarle Place. The
cash contribution shall be made by the Owner within thirty (30) days upon request by the
City. If the traffic calming improvements are not implemented by October 15, 2007, all
unexpended funds shall be refunded to the Owner. The City constructed the traffic calming
improvements, and requested the prior owner of the Property to pay the contribution on
November 9, 2005, but there are no immediately available records that such contribution was
ever received by the City. Upon evidence of prior payment of such funds that is satisfactory
to the County, the requirements of this Paragraph 4 shall be deemed satisfied. In the event
the Owner has not produced such evidence to the County by March 31, 2010, the Owner
shall contribute the funds to the City within thirty (30) days of a written request from the
City, provided that such request is made no sooner than April 1, 2011. At the time such
funds are delivered to the City, the Owner shall provide notice of such payment to the
County.
5. Cash Proffer for Charlottesville Area Transit ( "CAT ") Commercial Corridor "Jitney
Service ": Upon the request of the County, the Owner shall contribute Twenty Thousand
Dollars ($20,000.00) per annum or an amount equal to twenty percent (20 %) of the annual
operating and maintenance costs, whichever is less, for a period not to exceed five years for
operating and /or maintaining a dedicated "jitney bus" service to retail commercial
developments, including Albemarle Place, along the Route 29 Corridor. If the CAT "jitney
service" is not placed into operation by the date of issuance of the first occupancy permit for
a commercial building in Albemarle Place, then the Owner shall contribute Seven Thousand
Dollars ($7,000.00) per annum, for a period not to exceed five years, to CAT for costs
associated with operating existing CAT bus route(s) that provide service to Albemarle Place,
6. Cash Proffer for Capital Improvements: The Owner shall contribute One Million Five
Hundred Thousand Dollars ($1,500,000.00) (hereinafter referred to as the "Total
Contribution ") to the County for the purpose of funding capital improvements related to
Albemarle Place. The contribution shall be paid as follows: (a) Three Hundred and Seventy
Five Thousand Dollars ($375,000.00) shall be contributed to the County within thirty (30)
days after the first final site plan or subdivision plat containing residential dwelling units is
approved for Albemarle Place; (b) an additional Tluee Hundred and Seventy Five Thousand
Dollars ($375,000.00) of the total contribution shall be contributed to the County prior to the
issuance of a certificate of occupancy for the first residential dwelling unit in Albemarle
Original Proffer:
Amendment: X
Place, and (c) the remaining Seven Hundred Fifty Thousand Dollars ($750,000.00) of the
Total Contribution shall be paid on a pro rata basis of Three Thousand Dollars ($3,000.00)
per residential dwelling unit at the time certificates of occupancy are issued for the first two
hundred fifty (250) dwelling units. No additional contribution shall be required for the next
two hundred fifty (250) dwelling units.
If, five (5) years from the date of approval of the first final site plan or subdivision plat for
residential dwelling units, the Total Contribution has not been fully paid, the balance of the
Total Contribution shall be contributed to the County within thirty (30) days upon request by
the County. If this fund has not been exhausted by the County for the stated purpose within
five (5) years from the date the last contribution is made, all unexpended funds shall be
refunded to the Owner.
In addition to the foregoing, after building permits have been issued for the first five hundred
(500) dwelling units within Albemarle Place, the Owner shall pay to the County Three
Thousand Dollars ($3,000.00) prior to the issuance of a building permit for each new
residential dwelling unit thereafter.
7. Construction of Frontage improvements on Route 29 and Hydraulic Road: At its
expense, the Owner shall plan, design, bond and construct travel lane improvements to be
dedicated for public use on its Hydraulic Road and Route 29 frontage. The design shall be
submitted with the first site plan for the initial phase of Albemarle Place. The subject
frontage improvements are depicted by Exhibit F, "Short Term Route 29 Transportation
Improvements." The County may require these improvements to be completed as a
prerequisite to the issuance of any certificates of occupancy. The construction of the subject
improvements shall be deemed complete when they are constructed in conformance with the
plans approved by VDOT and opened to public use as approved by VDOT.
8. Construction of Off -Site Improvements: Upon request by the County or as provided
herein, the Owner shall plan, design, bond and construct off -site transportation improvements
in the County and the City, as depicted on Exhibit F, "Short Term Route 29 Transportation
Improvements ". If the improvements are required to be constructed, the County may require
these improvements to be completed as a prerequisite to the issuance of any certificates of
occupancy. Construction shall be deemed complete when the improvements are constructed
in conformance with the plans approved by VDOT and opened to public use as approved by
VDOT.
A. Off -site Improvements in the County at the Northwest Quadrant of the
Hydraulic Road/Route 29 Intersection. The engineering, plats and construction
documents for off -site improvements in the County shall be submitted with the first final
site plan for Phase 1 of Albemarle Place.
B. Off -site Improvements in the City at the Northeast Quadrant of the Hydraulic
Road/Route 29 Intersection (numbered items 4 and 11 on Exhibit F). The Owner shall
submit the engineering, plats and construction documents (the "Plans ") for the
improvements in the City of Charlottesville to the City of Charlottesville within sixty (60)
Original Proffer:
Amendment: X
days after the first final site plan for Phase 1 of Albemarle Place is submitted to the
County. The Owner shall diligently pursue approval of the Plans in the City. If the City
does not approve the Plans within six (6) months after the first final site plan for the first
phase of Albemarle Place is approved by the County, the Owner shall not be required by
this proffer to construct any improvements for which approvals have not been obtained.
The Owner shall not be required by this proffer to acquire or otherwise pay for right of
way in the City for these improvements.
If the improvements are required to be constructed, the Owner shall complete
construction of the improvements for which right of way is available within twelve (12)
months after the issuance of the first certificate of occupancy within Albemarle Place.
Construction shall be deemed complete when the improvements are constructed in
conformance with the plans approved by VDOT and opened to public use as approved by
VDOT.
This Paragraph 8(B) is subject to the terms of Paragraph 14, "Substituted Transportation
Improvements."
9. Reservation and Dedication of land for Regional Route 29 and Hydraulic Road
Intersection Improvements: The Owner shall reserve for the future dedication to the
Commonwealth of Virginia certain land on the Property in the County for certain short -term
transportation improvements for the Route 29 and Hydraulic Road intersection (the "Short -
Term Route 29 /Hydraulic Road Improvements ") as follows: (a) the land shown as "Parcel A
6,511 S.F." on the plat of Kirk Hughes and Associates dated March 3, 2009, last revised
March 25, 2010, which plat is attached hereto as Exhibit H; and (b) any portions of the
parcels shown as "Parcel One Future Right of Way 1,117 SY.," "Parcel Two Future Right of
Way 9,079 SY.," "Parcel Four Future Right of Way 1,660 S.F.," and "Parcel Five Future
Right of Way 790 S.F.," on the Official Map adopted by the County on December 2, 2009, a
copy of which Official Map is attached hereto as Exhibit I, that are required by VDOT for
the Short -Term Route 29 /Hydraulic Road Improvements (collectively, the "Short -Term
Improvements Dedication Area "), provided, however, that the subdivision plats depicting the
Short-Term Improvements Dedication Area are subject to final approval by the County
Department of Community Development and that the precise boundaries and size of the
Short -Term Improvements Dedication Area may be adjusted accordingly.
The Owner shall dedicate the Short-Term Improvements Dedication Area to the
Commonwealth of Virginia in fee simple by October 1, 2010, or within thirty (30) days after
the County approves the subdivision plat necessary to dedicate the Short -Term
Improvements Dedication Area, whichever is first to occur. In addition to the dedication of
the Short -Term Improvements Dedication Area, the Owner shall dedicate and convey all
necessary drainage and construction easements for the Short-Term Route 29/Hydraulic Road
Improvements. If the Short -Term Improvements Dedication Area is not dedicated and
conveyed as part of a subdivision plat, the Owner shall pay all costs of surveying and
preparing legal documents in a form acceptable to the Office of the Attorney General
necessary to dedicate and convey the Short -Term Improvements Dedication Area land.
Original Proffer:
Amendment: X
After dedication and until the subject regional transportation improvements are funded for
construction, the Owner shall, at the request of the County, and with the consent of the
Commonwealth of Virginia, maintain the Short -Term Improvements Dedication Area land
until requested by the County to no longer do so provided the Owner is granted the right to
the exclusive use of the land for landscaped open space, a pocket park, temporary parking,
fencing, signage, utilities or other purpose as may be approved with the final site plan for the
first phase of Albemarle Place. Upon being requested by the County to no longer maintain
the land, the Owner shall cease all use of the land and remove all improvements established
by the Owner that the County requests be removed.
In the event that the adopted design for future public intersection improvements does not
require the utilization of all of the Short-Term Improvements Dedication Area land, upon the
Owner's request, the residual portion of the dedicated land shall be transferred to the Owner
at no expense to the Owner. The deed(s) of dedication for the Short -Term Improvements
Dedication Area may provide for such conditions.
10. Reservation and Dedication of Additional Land for Route 29 and Hydraulic Road
Intersection Improvements: The Owner shall reserve for future dedication to the County,
subject to the conditions herein below, certain additional land on the Property for the right of
way for future Hydraulic Road and Route 29 related regional transportation improvements
(the "Long -Term Route 29/Hydraulic Road Improvements ") as follows: (a) the area shown
as "Parcel Al 1,432 S.F." on Exhibit H; and (b) any portions of the parcels shown on Exhibit
I that were not previously dedicated to the Commonwealth of Virginia for the Short -Term
Route 29/Hydraulic Road Improvements pursuant to the Paragraph 9 herein (collectively, the
"Long -Term Improvements Dedication Area ") provided, however, that the subdivision plats
depicting the Long -Term Improvements Dedication Area are subject to final approval by the
County Department of Community Development and that the precise boundaries and size of
the Long -Term Improvements Dedication Area may be adjusted accordingly.
The Owner shall dedicate the Long -Term Improvements Dedication Area to the County
within ninety (90) days after the County's request for such dedication, and such dedication
shall include the dedication and conveyance of all necessary drainage and construction
easements for the Long -Term Route 29/Hydraulic Road Improvements. If the Long -Term
Improvements Dedication Area is not dedicated and conveyed as part of a subdivision plat,
the Owner shall pay all costs of surveying and preparing legal documents in a form
acceptable to the County Attorney's Office necessary to dedicate and convey the Long -Term
Improvements Dedication Area.
Until the Long -Term Improvements Dedication Area land is dedicated, the Owner shall
maintain the land and shall retain the right to the exclusive use of the land for landscaped
open space, a pocket park, temporary parking, fencing, utilities or other purposes as may be
approved with the first final site plan for Phase 1 of Albemarle Place.
The conditions on the subject reservation and dedication shall be as follows:
Original Proffer:
Amendment: X
(a) In the event that the adopted design for future public intersection improvements does not
require the utilization of all of the Long -Term Improvements Dedication Area land, upon
request of the Owner the residual portion shall be released by the County from the
reservation or, if the land has been dedicated, upon request of the Owner title shall be
transferred back to, and for the use of, the Owner at no expense to Owner. The deed(s)
of dedication for the Long -Term Improvements Dedication Area may provide for such
conditions.
(b) The design and construction of the Long -Term Route 29/Hydraulic Road Improvements
shall substantially maintain the access, function, and continuity of service of the planned
intersection of Swanson Road (Extended) and existing Hydraulic Road into Albemarle
Place at the location of the existing Swanson Road and Hydraulic Road intersection;
otherwise this proffer becomes null and void.
11. Signalization of Hydraulic Road and Route 29 Intersections: The Owner shall be
responsible for traffic signalization improvements as follows:
A. The Owner at its expense shall engineer, bond, and construct traffic signalization
improvements at the intersection of Albemarle Place Boulevard and Hydraulic Road. The
traffic signalization improvements at this intersection shall be constructed when the County
or VDOT request installation of such, but in any event prior to the issuance of a certificate of
occupancy for any building in Blocks A, B, C or D, provided that such signal is warranted by
the traffic volumes or is otherwise approved by VDOT.
B. Owner at its expense shall engineer, bond and construct traffic signalization
improvements at the intersection of Albemarle Place Boulevard and U.S. Route 29. The
traffic signalization improvements at this intersection shall be constructed when the County
or VDOT request installation of such, but in any event prior to the issuance of a certificate of
occupancy for any building in Blocks E, F or G, provided that such signal is warranted by the
traffic volumes or is otherwise approved by VDOT, provided that such signal is warranted by
the traffic volumes or is otherwise approved by VDOT.
12. Commonwealth Drive Connection: Upon demand of the County, but no earlier than the
issuance of a building permit for any building within Block F, the Owner shall reserve right -
of -way along the northern edge of the parking lot in Block F of the Property for a future
street connection to Commonwealth Drive through the "Comdial Property" (TM 61W-3-18).
The future connection will be a two lane facility.
Upon the request of the County, the Owner shall engineer, bond and construct both the on-
site and the off -site portions of the connection to Commonwealth Drive on the "Comdial
Property" provided that easements and acquisition of right -of -way as may be necessary for
such construction for the connection through off -site properties for this improvement have
been granted at no cost to the Owner, and the request for such connection through the off -site
property is made by the County prior to October 15, 2020. Upon the request of the County,
the connection shall be completed by the Owner within twelve (12) months from the date of
satisfaction of the conditions as set forth above.
Original Proffer:
Amendment: X
13. Other "Super Block" Street Connections: The Owner shall reserve land and grant
construction and permanent access easements or right of way at no expense to the County for
the purposes of future construction (by others) of inter - parcel street connections within the
"Super Block" at the following locations; First Street (to west to Commonwealth Drive),
second Street (to west to Commonwealth Drive), Third Street (to west to Commonwealth
Drive), Cedar Hill Road Extended (in Block F north to "Comdial Property "), Fourth Street
(between Blocks F and G north to "Comdial Property "), Swanson Road Extended (to north to
"Sperry Property ") and at two additional locations into Sperry Property.
The locations for easement or right of way reservation and dedication are as generally
depicted on Exhibit A and labeled thereon as "Future Extension." These easement or right of
way locations shall be identified, platted and dedicated at the request of the County in
conjunction with subsequent site plan applications for Albemarle Place.
14. Substituted Transportation Improvements.
A. In lieu of constructing the improvements referenced in Paragraph 8(B) herein, which
Paragraph 8(B) refers to certain off -site improvements in the City of Charlottesville at the
northwest quadrant of the Hydraulic Road /Route 29 intersection, and also other
improvements along the City side of Route 29 between Hydraulic Road and Greenbrier
Drive, which improvements are collectively hereinafter referred to as the "Paragraph 8(B)
Improvements ", the Owner may elect, in its sole discretion, and on the terms and conditions
contained in this Paragraph 14, to contribute cash to the City for certain transportation
improvements in the City known as the "Rte. 29/250 Bypass Interchange Improvement
Project" identified as VDOT and City project number 0029 - 104 -248 (the "Substituted
Improvements Project ").
B. In the event the Owner elects to contribute cash toward the Substituted Improvements
Project (the "Owner's Contribution ") in lieu of constructing the Paragraph 8(B)
Improvements, the following terms shall apply:
1. The Owner shall notify the County's Director of Community Development (the
"Director ") in writing of its election within sixty (60) days after the approval of the first final
site plan for Phase 1 of Albemarle Place (the "Notice "). The Owner shall also send a copy of
the Notice to the City Development Services Manager at the same time it is sent to the
Director.
2. The submission of the Notice to the Director shall suspend the deadline for the Owner
to submit the Plans (as "Plans" is defined in Paragraph 8(B)) to the City, if applicable.
3. The amount of the Owner's Contribution to the Substituted Improvements Project
shall be subject to a written agreement between the Owner and the City (the "City
Agreement "). Within ten (10) days after full execution of the City Agreement, the Owner
shall provide a copy of the City Agreement to the Director.
Original Proffer:
Amendment:
4. Within six (6) months after the Notice is sent to the Director, or within sixty (60) days
after execution of the City Agreement, whichever is later to occur, the Owner shall contribute
a portion of the Owner's Contribution to the City in the amount of One Million Dollars
($1,000,000), less any amounts credited by the City and VDOT to the Owner for planning
and design work on the Paragraph 8(B) Improvements (the "Net Contribution "). The Net
Contribution may be in the form of cash or a letter of credit issued by a bank approved by the
City, or a combination thereof. The City Agreement shall set forth the terms of and schedule
for draw down of the Net Contribution.
5. In the event that the Substituted Improvements Project is terminated, or has not
otherwise been completed (as described herein) within thirty -six (36) months after the City
receives the Net Contribution (which thirty -six (36) month period may be extended by
mutual agreement of the Charlottesville City Manager and the Albemarle County Executive),
and upon the City's refunding of the Net Contribution to the Owner pursuant to the City
Agreement, the Owner shall forward funds equal to Five Hundred Thousand Dollars
($500,000) to the County for funding transportation improvements in the vicinity of the U.S.
Route 29/Hydraulic Road intersection identified in the County's Capital Improvements
Program. In the event such funds have not been expended by the County for the stated
purpose within ten (10) years from the date the funds were contributed to the County, all
unexpended funds shall be refunded to the Owner. Construction of the Substituted
Improvements Project shall be deemed complete when the improvements are accepted by the
appropriate public entity or are bonded for the entity's acceptance.
6. Notwithstanding the provisions of Paragraph 14(B)(5) herein, upon the City's receipt
of the Net Contribution, the Owner shall be relieved of any obligation to construct the
Paragraph 8(13) Improvements.
WITNESS the following signature:
ALBEMARLE PLACE EAAP, LLC,
a Delaware limited liability company
B _--
odi McLean, President
7617826 9.DOC
m
`I
o
oa wo
N
6� et
Bo
\
V�
ooeo
a�
a�°
:,
O
e
°rj of Cpp
'Y'TF
O ap
a''c
MV qp�qqq
�S3j
•=5 ,6•
I
ti•I
b-j F � Li
YFWyy'
�
p �
��C,�5•qeq �..e�igJ
oEOW�40 °.3
p spy
M,d
0Q�
•U uJ
O
= 9
l 8
pX
�y
xx
�m
6 •i. VJ '
N
Qr
^
C1
3 % �
,o�ajfn 1
i
i
::jo
=
vaw
O O N O
u
O
3
O Q
V�
O� •� s
r
:,
O
e
S F
iCi
•a
9 Y..cOc
O ap
a''c
MV qp�qqq
�S3j
•=5 ,6•
- RO•i 4
{;'rG oo N
•U uJ
«O S
pX
sq
Rig
6 o
v� �
Q.7
QFroO
m
FW
d
(�J
�n
•o
r
—
�1 :rl
e
Oil
_II
i _ E
s
= >k•� VxR g� �o �
�p�p gg a
ov �� Sa•o 'SF8 o�Q
�b�T �9'9 gg9a 6. °aC °y
o
1�
ll1 `J I
(1
I
0
�i
a
W
a
�C
W
V
LL
zz ra
owwwin° �g i
moQ °m�wwa rn
�mW mz(w'J °N(Wj
Oww <<Ii F U
UxmO �.��a1 W J a
U_ W UIJ� •0 >23 N J U i d y
W zoOZn -onC °Z lNIA I ~L c "� `�" z No
°w a U cwa S� W� d' Q W
W �QK LLo K2W� a� V Y R
o >zaMW Fz°�n
o aoxwwo °w �W
wF Nmzj°,j >n�W.w y�� U¢ o w r LL sy a=i °�vi
�O¢J�m p W°f °
W W K!- IS{OJ Q W Y K Z
N x3a¢ Wo A > < Y S
zo Q 00oow� ¢
xza�zwYjUFO `J`
c
Y O Z > W> W F } W
°PWx om'0
0 w¢zom wmJw z°
— � F- °U K O FM( N
NZZ> o ozw � �¢zRr
,Rdwz F �2 z° fLLZO2o
U E °M 3�N °awn z°
4 + CO° wwU�Q.a O < 4� EE'wurc.= woo
OF z
zzw?U xZ z wx UZ F o wW o N o 34UaZzOoa
ja¢ °zxm mz° c
Jo m
$ Hzn¢aq z °r I-
a ZQ 7O r O Owj
0
U ~
F M m �+ m` m A OR b N O 2
m n .tt ANN^ Om �
w c>n MOOinriv a-i�.n ain a
21V
,50'01 =0
Q:
NM Nb •tb NmnO d'•t a W �•-
I" f/1NmmNZm V1Z Zf/�N N � 3 � Q
�Ny MM11 YY�� f \ m
J Z J J J J J J J J� N O •- i U a 3 K � w V
J_ O
t0 d
a
m m�md Wno
a
S2 ¢ Uw3
o ..
o oN
w 1211 Ol dal
a m 3 n
m ,W L12 �a
U L Uvn
12 M
N N � I O � pp N •-
Na �a z¢ Irre 3 j t3 = a
Q
N K m
OzLLo
Id
o ) _
\\ O of
N
°n n:rn:
FF U 1 2 M N Op' ^ N
�U Z'
•tg= m ~ Z .
Gg 00 ? m o
'l)F Quf ��2k6 �+1MO�Y�(1
n N m M N
csizz.zz
U d
Z o m M V
or y dJ eJ ra -n�amm
J,o ��o �� bbO�yH1pe9F 2�2 a 01
yid ��o ro � � m
P b II
02 ¢ X0"1 o 0"'
U Q O m O O M
W
m � MM Mh�N
O O'er d'O
W h D O
O� NO
N d
� Z O N M Y m m
U U U U U U
y
gym. -n .l °m No=r IJ
d-
W1.
Bryn oo�Ob000rv° J
Sam I '•.. � � i{I'Ef�3 I
�z
se.w "!� �
N1' °oo
� p s,.sogloa
3W 3ro_ °ogry 5
z
L N"
v
3.. 8o Bo Sn
ow 4a 4o Ux uy �� w % LL
Gj
w_ \
�NOb'pao y�o .ry�E, r�� w
my n ra J,'�r3��MJ ZIrlo a
-�
N3NOL
(1Md) 069 Od 'ZfOZ "e
Bf10d '6661 80 0
°
lS'<I41 3 .lf.Lf.4535
J22 69
,80'C I[
,t9 tOL
1
T
�I
rF _
arc
wiz
1 lu��
Mlle
p,Ct" 9
011
M..56.Ll.SSM NB
I 1
�ijo
3
ttHH 5r
�
I
I I
i n o
u 1-Q
ja -1 to
j
o
uWi
_
v ryiil
—
I
II w� III
1
//
/ / � �� 8 � a atl�a X1,11 M0AN-EtL 31lION 31tl1S � ry
Ie
ED
W)lSNUlxdj)jrjUjj
tifi
P-4
IsNam. aunifu
cq
NOIINAIX�j JJ.L;J:j
7-7
P-4
NOMI) UXAME111H
IN-
'. r'o
Qolp� 21 10 ......... ...
io
Nk- UFI
L MIAM-INfUdON
&
IM64
4. Ali 0
p
P4
KIS
is
lAnM—M
7we
L, N N V-
10,
crvolr:)l,lnv-dcuu
Z,
0
Nod
04 0
0 T4 i
o
o
oi
ZP
z
w
E-4
PA
P4
w
PQCS
rr
12
rd
O.
O
O
4� P�
u
0
PL4
O
U
O
z
I